765 resultados para arbre de duplication
Resumo:
This project advances current understanding of intra-urban rail passengers and their travel experiences in order to help rail industry leaders tailor policy approaches to fit specific, relevant segments of their target population. Using a Q sorting technique and cluster analysis, our preliminary research identified five perspectives occurring in a small sample of rail passengers, who varied in their frequency and location of rail travel as well as certain socio-demographic characteristics. Revealed perspectives (named to capture the gist of their content) included: ‘Rail Travel is About the Destination, Not the Journey’; ‘Despite Challenges, Public Transport is Still the Best Option’; ‘Rail Travel is Fine’; ‘Rail Travel? So Far, So Good’; and ‘Bad Taste for Rail Travel’. This paper discusses each of the perspectives in detail, and considers them in terms of tailored policy implications. An overarching finding from this study is that improving railway travel ‘access’ requires attention to physical, psychological, financial, and social facets of accessibility. For example, designing waiting areas to be more socially functional and comfortable has the potential to increase ridership by addressing social forms of access, decreasing perceived wait times, and making time at the station feel like time well spent. Even at this preliminary stage, the Q sorting technique promises to provide a valuable, holistic albeit fine-grained analysis of passenger attitudes and experiences that will assist industry efforts to increase ridership.
Resumo:
The androgen receptor (AR) signaling pathway is a common therapeutic target for prostate cancer, because it is critical for the survival of both hormone-responsive and castrate-resistant tumor cells. Most of the detailed understanding that we have of AR transcriptional activation has been gained by studying classical target genes. For more than two decades, Kallikrein 3 (KLK3) (prostate-specific antigen) has been used as a prototypical AR target gene, because it is highly androgen responsive in prostate cancer cells. Three regions upstream of the KLK3 gene, including the distal enhancer, are known to contain consensus androgen-responsive elements required for AR-mediated transcriptional activation. Here, we show that KLK3 is one of a specific cluster of androgen-regulated genes at the centromeric end of the kallikrein locus with enhancers that evolved from the long terminal repeat (LTR) (LTR40a) of an endogenous retrovirus. Ligand-dependent recruitment of the AR to individual LTR-derived enhancers results in concurrent up-regulation of endogenous KLK2, KLK3, and KLKP1 expression in LNCaP prostate cancer cells. At the molecular level, a kallikrein-specific duplication within the LTR is required for maximal androgen responsiveness. Therefore, KLK3 represents a subset of target genes regulated by repetitive elements but is not typical of the whole spectrum of androgen-responsive transcripts. These data provide a novel and more detailed understanding of AR transcriptional activation and emphasize the importance of repetitive elements as functional regulatory units
Resumo:
The human kallikrein-related peptidases are a subgroup of trypsin and chymotrypsin-like serine peptidases that are characterized by their homology to tissue kallikrein or kallikrein 1 (KLK1) encoded by the KLK1 gene (reviewed in[1-4]). The human KLK locus spans an approximately 320 kb region on chromosome 19q13.3-13.4 and contains fifteen genes encoding KLK1 and fourteen other kallikrein-related peptidases, KLK2-KLK15, which have been named contiguously in the locus in the order of their discovery [5-8] (Figure 606.1). It is the largest contiguous cluster of serine protease encoding genes in the human genome which has evolved from gene duplication of KLK1 and then subsequent reduplication of the newly evolved KLK genes [2]. The high conservation noted for KLK1-KLK3 (62-77%) reflects the proposed duplication of the KLK1 gene that produced the KLK2 gene which further generated the KLK3 gene. In contrast, the newer KLK4-KLK15 proteases share much less similarity, from 24-66%, although strong homology between KLK4 and KLK5, KLK9 and KLK11, and KLK10 and KLK12 suggests these genes are duplications of each other [2]...
Resumo:
This paper gives an overview of the INEX 2011 Snippet Retrieval Track. The goal of the Snippet Retrieval Track is to provide a common forum for the evaluation of the effectiveness of snippets, and to investigate how best to generate snippets for search results, which should provide the user with sufficient information to determine whether the underlying document is relevant. We discuss the setup of the track, and the evaluation results.
Resumo:
Background WSUD implementation in the Gold Coast City Council area commenced more than a decade ago. As a result, Council is expected to be in possession of WSUD assets valued at over tens of million dollars. The Gold Coast City Council is responsible for the maintenance and long-term management of these WSUD assets. Any shortcoming in implementation of best WSUD practices can potentially result in substantial liabilities and ineffective expenditure for the Council in addition to reduced efficiencies and outcomes. This highlights the importance of periodic auditing of WSUD implementation. Project scope The overall study entailed the following tasks: * A state-of-the-art literature review of the conceptual hydraulic and water quality treatment principles, current state of knowledge in relation to industry standards, best practice and identification of knowledge gaps in relation to maintenance and management practices and potential barriers to the implementation of WSUD. * Council stakeholder interviews to understand current practical issues in relation to the implementation of WSUD and the process of WSUD application from development application approval to asset management. * Field auditing of selected WSUD systems for condition assessment and identification of possible strengths and weaknesses in implementation. * Review of the Land Development Guidelines in order to identify any gaps and to propose recommendations for improvement. Conclusions Given below is a consolidated summary of the findings of the study undertaken. State-of-the-art literature review Though the conceptual framework for WSUD implementation is well established, the underlying theoretical knowledge underpinning the treatment processes and maintenance regimes and life cycle costing are still not well understood. Essentially, these are the recurring themes in the literature, namely, the inadequate understanding of treatment processes and lack of guidance to ensure specificity of maintenance regimes and life cycle costing of WSUDs. The fundamental barriers to successful WSUD implementation are: * Lack of knowledge transfer – This essentially relates to the lack of appropriate dissemination of research outcomes and the common absence of protocols for knowledge transfer within the same organisation. * Cultural barriers – These relate to social and institutional factors, including institutional inertia and the lack of clear understanding of the benefits. * Fragmented responsibilities – This results from poor administrative integration within local councils in relation to WSUDs. * Technical barriers – These relate to lack of knowledge on operational and maintenance practices which is compounded by model limitations and the lack of long-term quantitative performance evaluation data. * Lack of engineering standards – Despite the availability of numerous guidelines which are non-enforceable and can sometimes be confusing, there is a need for stringent engineering standards. The knowledge gaps in relation to WSUDs are only closing very slowly. Some of the common knowledge gaps identified in recent publications have been recognised almost a decade ago. The key knowledge gaps identified in the published literature are: * lack of knowledge on operational and maintenance practices; * lack of reliable methodology for identifying life cycle issues including costs; * lack of technical knowledge on system performance; * lack of guidance on retrofitting in existing developments. Based on the review of barriers to WSUD implementation and current knowledge gaps, the following were identified as core areas for further investigation: * performance evaluation of WSUD devices to enhance model development and to assess their viability in the context of environmental, economic and social drivers; establishing realistic life cycle costs to strengthen maintenance and asset management practices; * development of guidelines specific to retrofitting in view of the unique challenges posed by existing urban precincts together with guidance to ensure site specificity; establishment of a process for knowledge translation for enhancing currently available best practice guidelines; * identification of drivers and overcoming of barriers in the areas of institutional fragmentation, knowledge gaps and awareness of WSUD practices. GCCC stakeholder interviews Fourteen staff members involved in WSUD systems management in the Gold Coast City Council, representing four Directorates were interviewed using a standard questionnaire. The primary issues identified by the stakeholders were: * standardisation of WSUD terminology; * clear protocols for safeguarding devices during the construction phase; * engagement of all council stakeholders in the WSUD process from the initial phase; * limitations in the Land Development Guidelines; * ensuring public safety through design; * system siting to avoid conflicts with environmental and public use of open space; * provision of adequate access for maintenance; * integration of social and ecosystem issues to ensure long-term viability of systems in relation to both, vandalism and visual recreation; * lack of performance monitoring and inadequacy of the maintenance budget; * lack of technical training for staff involved in WSUD design approvals and maintenance; incentives for developers for acting responsibly in stormwater management. Field auditing of WSUD systems A representative cross section of WSUD systems in the Gold Coast were audited in the field. The following strengths and weaknesses in WSUD implementation were noted: * The implementation of WSUD systems in the field is not consistent. * The concerns raised by the stakeholders during the interviews in relation to WSUD implementation was validated from the observations from the field auditing, particularly in relation to the following: * safeguarding of devices during the construction phase * public safety * accessibility for maintenance * lack of performance monitoring by Council to assess system performance * inadequate maintenance of existing systems to suit site specific requirements. * A treatment train approach is not being consistently adopted. * Most of the systems audited have satisfactorily catered for public safety. Accessibility for maintenance has been satisfactorily catered for in most of the systems that were audited. * Systems are being commissioned prior to construction activities being substantially completed. * The hydraulic design of most systems appears to be satisfactory. * The design intent of the systems is not always clear. Review of Land Development Guidelines The Land Development Guidelines (TDG) was extensively reviewed and the following primary issues were noted in relation to WSUD implementation: * the LDG appears to have been prepared primarily to provide guidance to developers. It is not clear to what extent the guidelines are applicable to Council staff involved in WSUD maintenance and management; * Section 13 is very voluminous and appears to be a compilation of a series of individual documents resulting in difficulties in locating specific information, a lack of integration and duplication of information; * the LDG has been developed with a primary focus on new urban precinct development and the retrofitting of systems in existing developments has not been specifically discussed; * WSUDs are discussed in two different sections in the LDG and it is not clear which section takes precedence as there are inconsistencies between the two sections; there is inconsistent terminology being used; * there is a need for consolidation of information provided in different sections in the LDG; * there are inconsistencies in the design criteria provided; * there is a need for regular updating of the LDG to ensure that the information provided encompasses the state-of-the-art; * there is limited guidance provided for the preparation of maintenance plans and life cycle costing to assist developers in asset handover and to assist Council staff in assessment. * Based on these observations, eleven recommendations have been provided which are discussed below. Additionally, the stakeholder provided the following specific comments during the interviews in relation to the LDG: * lack of flexibility to cover the different stages of the life cycle of the systems; * no differentiation in projects undertaken by developers and Council; * inadequate information with regards to safety issues such as maximum standing water depth, fencing and safety barriers and public access; * lack of detailed design criteria in relation to Crime Prevention through Environmental Design, safety, amenity, environment, surrounding uses and impacts on surroundings; * inadequate information regarding maintenance requirements specific to the assessment and compliance phases; * recommendations for plantings are based primarily on landscape requirements rather than pollutant uptake capability. Recommendations With regards to the Land Development Guidelines, the following specific recommendations are provided: 1. the relevant sections and their extent of applicability to Council should be clearly identified; 2. integration of the different subsections within Section 13 and re-formatting the document for easy reference; 3. the maintenance guidelines provided in Section 13 should be translated to a maintenance manual for guidance of Council staff; 4. should consider extending the Guidelines to specifically encompass retrofitting of WSUD systems to existing urban precincts; 5. Section 3 needs to be revised to be made consistent with Section 13, to ensure priority for WSUD practices in urban precincts and to move away from conventional stormwater drainage design such as kerb and channelling; 6. it would also be good to specify as to which Section takes predominance in relation to stormwater drainage. It is expected that Section 13 would take predominance over the other sections in the LDG; 7. terminology needs to be made consistent to avoid confusion among developers and Council staff. Water Sensitive Urban Design is the term commonly used in Australia for stormwater quality treatment, rather than Stormwater Quality Improvement Devices. This once again underlines the need for ensuring consistency between Section 3 and Section 13; 8. it would also be good if there is a glossary of commonly used terms in relation to WSUD for use by all stakeholders and which should also be reflected in the LDG; 9. consolidation of all WSUD information into one section should be considered together with appropriate indicators in other LDG Sections regarding the availability of WSUD information. Ensuring consistency in the information provided is implied; 10. Section 13 should be updated at regular intervals to ensure the incorporation of the latest in research outcomes and incorporating criteria and guidance based on the state-of-the-art knowledge. The updating could be undertaken, say, in five year cycles. This would help to overcome the current lack of knowledge transfer; 11. the Council should consider commissioning specialised studies to extend the current knowledge base in relation to WSUD maintenance and life cycle costing. Additionally, Recommendation 10 is also applicable in this instance. The following additional recommendations are made based on the state-of-the-art literature review, stakeholder interviews and field auditing of WSUD systems: 1. Performance monitoring of existing systems to assess improvements to water quality, identify modifications and enhancements to improve performance; 2. Appropriate and monitored maintenance during different phases of development of built assets over time is needed to investigate the most appropriate time/phase of development to commission the final WSUD asset. 3. Undertake focussed investigations in the areas of WSUD maintenance and asset management in order to establish more realistic life cycle costs of systems and maintenance schedules; 4. the engagement of all relevant Council stakeholders from the initial stage of concept planning through to asset handover, and ongoing monitoring. This close engagement of internal stakeholders will assist in building a greater understanding of responsibilities and contribute to overcoming constraints imposed by fragmented responsibilities; 5. the undertaking of a public education program to inform the community of the benefits and ecosystem functions of WSUD systems; 6. technical training to impart state-of-the-art knowledge to staff involved in the approval of designs and maintenance and management of WSUD projects; 7. during the construction phase, it is important to ensure that appropriate measures to safeguard WSUD devices are implemented; 8. risks associated with potential public access to open water zones should be minimised with the application of appropriate safety measures; 9. system siting should ensure that potential conflicts are avoided with respect to public and ecosystem needs; 10. integration of social and ecosystem issues to ensure long-term viability of systems; provide incentives to developers who are proactive and responsible in the area of stormwater management.
Resumo:
Modernized GPS and GLONASS, together with new GNSS systems, BeiDou and Galileo, offer code and phase ranging signals in three or more carriers. Traditionally, dual-frequency code and/or phase GPS measurements are linearly combined to eliminate effects of ionosphere delays in various positioning and analysis. This typical treatment method has imitations in processing signals at three or more frequencies from more than one system and can be hardly adapted itself to cope with the booming of various receivers with a broad variety of singles. In this contribution, a generalized-positioning model that the navigation system independent and the carrier number unrelated is promoted, which is suitable for both single- and multi-sites data processing. For the synchronization of different signals, uncalibrated signal delays (USD) are more generally defined to compensate the signal specific offsets in code and phase signals respectively. In addition, the ionospheric delays are included in the parameterization with an elaborate consideration. Based on the analysis of the algebraic structures, this generalized-positioning model is further refined with a set of proper constrains to regularize the datum deficiency of the observation equation system. With this new model, uncalibrated signal delays (USD) and ionospheric delays are derived for both GPS and BeiDou with a large dada set. Numerical results demonstrate that, with a limited number of stations, the uncalibrated code delays (UCD) are determinate to a precision of about 0.1 ns for GPS and 0.4 ns for BeiDou signals, while the uncalibrated phase delays (UPD) for L1 and L2 are generated with 37 stations evenly distributed in China for GPS with a consistency of about 0.3 cycle. Extra experiments concerning the performance of this novel model in point positioning with mixed-frequencies of mixed-constellations is analyzed, in which the USD parameters are fixed with our generated values. The results are evaluated in terms of both positioning accuracy and convergence time.
Resumo:
A microgrid can span over a large area, especially in rural townships. In such cases, the distributed generators (DGs) must be controlled in a decentralized fashion, based on the locally available measurements. The main concerns are control of system voltage magnitude and frequency, which can either lead to system instability or voltage collapse. In this chapter, the operational challenges of load frequency control in a microgrid are discussed and few methods are proposed to meet these challenges. In particular, issues of power sharing, power quality and system stability are addressed, when the system operates under decentralized control. The main focus of this chapter is to provide solutions to improve the system performance in different situations. The scenarios considered are (a) when the system stability margin is low, (b) when the line impedance has a high R to X ratio, (c) when the system contains unbalanced and/or distorted loads. Also a scheme is proposed in which a microgrid can be frequency isolated from a utility grid while being capable of bidirectional power transfer. In all these cases, the use of angle droop in converter interfaced DGs is adopted. It has been shown that this results in a more responsive control action compared to the traditional frequency based droop control.
Resumo:
• Government reports consistently recognise the importance of Primary Health Care to an efficient health system. Barriers identified in Australia’s Primary Health Care include workforce pressures, increase rate of chronic disease, and equitable access to Primary Health Care services. • General Practitioners (GPs) are the key to the successful delivery of Primary Health Care especially in rural and remote regions such as the Wheatbelt region in Western Australia (WA). • The Wheatbelt region of WA is vast: some 72,500 residents spread across 150,000km2 in 43 Local Government Authorities catchments. Majority of the Wheatbelt residents live in small towns. There is a higher reported rates of chronic disease, more at risk of chronic diseases and less utilisation of Primary Health Care services in this region. • General practice patients in the Wheatbelt are among those most in need of Primary Health Care services. • Wheatbelt GP Network (the “Network”) was established in 1998. It is a key health service delivery stakeholder in the Wheatbelt. • The Network has responded to the health needs of the community by creating a mobile Allied Health Team that works closely with GPs and is adaptive to ensure priority needs are met. • The Medicare Local model introduced by the Australian Government in 2011 aimed to improve the delivery of Primary Health Care services by improved health planning and coordinating service delivery. • Little if any recognition has been given to the outstanding work that many Divisions of General Practice have done in improving the delivery of Primary Health Care services such as the Network. • The Network has continued to support GPs and general practices and created a complementary system that integrated general practice with the work of an Allied Health Team. Its program mix is extensive. • The Network has consistently delivered on-required contract outputs and has a fifteen (15) years history of operating successfully in a large geographical area comprising in the main smaller communities that cannot support the traditional health services model. • The complexity of supporting International Medical Graduates in the region requires special attention. • The introduction of the Medicare Local in the South West of WA and their intention to take over the delivery of health services, thus effectively shutting the Network will have catastrophic consequences and cannot be supported economically. • The Network proposes to create a new model, built on its past work that increases the delivery of Primary Health Care services through its current Allied Health Team. • The proposal uses the Wheatbelt GP Super Clinic currently under construction in Northam, part of the Network and funded by the Australian Government is a key to the proposed new model. • Wheatbelt GP Super Clinic is different from existing models of GP Super Clinics around Australia which focus predominately on co-location of services. Wheatbelt GP Super Clinic utilises a hub and spoke model of service outreach to small rural towns to ensure equitable Primary Health Care coverage and continuum of care in a financially responsible and viable manner. In particular, the Wheatbelt GP Super Clinic recognises the importance of Allied Health Professionals and will involve them in a collaborative model with rural general practice. • The proposed model advocated by the Network aims to substitute the South West WA Medicare Local direct service delivery proposed for the Wheatbelt. The Network’s proposed model is to expand on the current hub and spoke model of Primary Health Care delivery to otherwise small unviable Wheatbelt towns. A flexible and adaptive skill mix of Allied Health Professionals, Nurse Practitioners and GPs ensure equitable access to service. Expanded scope of practices are utilised to reduce duplication of service and concentration of services in major towns. This involves a partnership approach. • If the proposed model not funded, the Network and the Wheatbelt region will stand to lose 16 Allied Health Professionals and defeats the purpose of Australian Government current funding for the construction of the Wheatbelt GP Super Clinic. • The Network has considered how its model can best be funded. It proposes a re-allocation of funds made available to the South West WA Medicare Local. • This submission argues that the proposal for the South West WA Medicare Local to take over the service delivery of Primary Health Care services in the Wheatbelt makes no economic sense when an existing agency (the Network) has the infrastructure in place, is experienced in working in this geographical area that has special needs and is capable to expand its programs to meet demand.
Resumo:
This paper investigates quality of service and resource productivity implications of transit route passenger loading and travel distance. Weekday Automatic Fare Collection data for a premium radial bus route in Brisbane, Australia, is used to investigate correlation between load factor and distance factor. Relationships between boardings and transit work indicate that distance factor generally increases with load factor. Time series analysis is then presented by examining each direction on an hour by hour basis. Inbound correlation is medium to strong across the entire span of service and strong for daytime services up to 19:30, while outbound correlation is strong across the entire span. Passengers tend to be making longer distance, peak direction commuter trips under the least comfortable conditions under stretched peak schedules than off-peak. Therefore productivity gains may be possible by adjusting fleet utilization during off-peak times. Weekday profiles by direction are established for a composite load-distance factor. A threshold corresponding to standing passengers on the Maximum Load Segment reveals that on-board loading and travel distance combined are more severe during the morning inbound peak than evening outbound peak, although the sharpness of the former suggests that encouraging shoulder peak travel during the morning would be more effective than evening peak. Further research suggested includes: consideration of travel duration factor, relating noise within hour to Peak Hour Factor, profiling load-distance factor across a range of case studies, and relating load-distance factor threshold to line length.
Resumo:
Stations on Bus Rapid Transit (BRT) lines ordinarily control line capacity because they act as bottlenecks. At stations with passing lanes, congestion may occur when buses maneuvering into and out of the platform stopping lane interfere with bus flow, or when a queue of buses forms upstream of the station blocking inflow. We contend that, as bus inflow to the station area approaches capacity, queuing will become excessive in a manner similar to operation of a minor movement on an unsignalized intersection. This analogy is used to treat BRT station operation and to analyze the relationship between station queuing and capacity. In the first of three stages, we conducted microscopic simulation modeling to study and analyze operating characteristics of the station under near steady state conditions through output variables of capacity, degree of saturation and queuing. A mathematical model was then developed to estimate the relationship between average queue and degree of saturation and calibrated for a specified range of controlled scenarios of mean and coefficient of variation of dwell time. Finally, simulation results were calibrated and validated.
Resumo:
Franchising has become a way to minimise the risks of small business management. There has been little research into the factors that promote franchise relationship success. This study attempts to empirically examine the important elements (relationship quality, customer loyalty and cooperation), which might promote a successful long-term franchising relationship between franchisors and franchisees within the context of convenience stores in Taiwan. A model of these relationships was developed and tested. A total of 500 surveys were mailed to a random sample of convenience stores’ franchisee owners among the four main franchisors in Taiwan. The results show that relationship quality positively influences the cooperation between franchisors and franchisees and is positively correlated with franchisee loyalty. Additionally, the cooperative behaviour between franchisees and franchisors is significantly associated with franchisees’ loyalty.
Resumo:
We report a high-quality draft genome sequence of the domesticated apple (Malus × domestica). We show that a relatively recent (>50 million years ago) genome-wide duplication (GWD) has resulted in the transition from nine ancestral chromosomes to 17 chromosomes in the Pyreae. Traces of older GWDs partly support the monophyly of the ancestral paleohexaploidy of eudicots. Phylogenetic reconstruction of Pyreae and the genus Malus, relative to major Rosaceae taxa, identified the progenitor of the cultivated apple as M. sieversii. Expansion of gene families reported to be involved in fruit development may explain formation of the pome, a Pyreae-specific false fruit that develops by proliferation of the basal part of the sepals, the receptacle. In apple, a subclade of MADS-box genes, normally involved in flower and fruit development, is expanded to include 15 members, as are other gene families involved in Rosaceae-specific metabolism, such as transport and assimilation of sorbitol.
Resumo:
Two BRCA2-like sequences are present in the Arabidopsis genome. Both genes are expressed in flower buds and encode nearly identical proteins, which contain four BRC motifs. In a yeast two-hybrid assay, the Arabidopsis Brca2 proteins interact with Rad51 and Dmc1. RNAi constructs aimed at silencing the BRCA2 genes at meiosis triggered a reproducible sterility phenotype, which was associated with dramatic meiosis alterations. We obtained the same phenotype upon introduction of RNAi constructs aimed at silencing the RAD51 gene at meiosis in dmc1 mutant plants. The meiotic figures we observed strongly suggest that homologous recombination is highly disturbed in these meiotic cells, leaving aberrant recombination events to repair the meiotic double-strand breaks. The 'brca2' meiotic phenotype was eliminated in spo11 mutant plants. Our experiments point to an essential role of Brca2 at meiosis in Arabidopsis. We also propose a role for Rad51 in the dmc1 context.
Resumo:
We present a theoretical model describing a plasma-assisted growth of carbon nanofibers (CNFs), which involves two competing channels of carbon incorporation into stacked graphene sheets: via surface diffusion and through the bulk of the catalyst particle (on the top of the nanofiber), accounting for a range of ion- and radical-assisted processes on the catalyst surface. Using this model, it is found that at low surface temperatures, Ts, the CNF growth is indeed controlled by surface diffusion, thus quantifying the semiempirical conclusions of earlier experiments. On the other hand, both the surface and bulk diffusion channels provide a comparable supply of carbon atoms to the stacked graphene sheets at elevated synthesis temperatures. It is also shown that at low Ts, insufficient for effective catalytic precursor decomposition, the plasma ions play a key role in the production of carbon atoms on the catalyst surface. The model is used to compute the growth rates for the two extreme cases of thermal and plasma-enhanced chemical vapor deposition of CNFs. More importantly, these results quantify and explain a number of observations and semiempirical conclusions of earlier experiments.
Resumo:
The biosimilars market is potentially the single fastest growing pharmaceutical sector with an estimated worth of US$67bn in global sales by 2020. This market generally refers to larger molecule, biological, protein-based pharmaceuticals which have lost its patent. This has stimulated the emergence of non-conventional pharmaceutical investors such as Fujifilm and Samsung as well as host countries such as Brazil, Mexico, China, India, South Korea, Turkey and Russia, which view biosimilars as a key macroeconomic driver of growth. Internationally, the European Medicines Agency has led the regulation of the quality, safety and efficacy of biosimilars; however, many countries have developed their own biosimilar regulatory frameworks. Despite the similarity of these with European guidelines, differences do exist across jurisdictions and have implications for cross-jurisdictional registration and regulation. The consideration of biosimilar regulation, however, demands attention beyond quality, safety and efficacy. The potential implications of extended patent protection, international trade and globalisation require a congruent policy approach to their regulation. Notwithstanding the fact that Australia is a relatively small pharmaceutical market and that there are only 14 biosimilar products currently approved for use, Australia’s geographical proximity to pharm-emerging countries and its trade relation with the major pharmaceutical markets have positioned Australia in a unique position to influence international development and regulation of biosimilars. Australia’s National Medicines Policy (2000) potentially provides the foundation for a partnership approach to biosimilar regulation, minimise duplication of regulatory efforts while at the same time fostering a viable pharmaceutical industry.