889 resultados para Production lot-scheduling models


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Due to the ongoing trend towards increased product variety, fast-moving consumer goods such as food and beverages, pharmaceuticals, and chemicals are typically manufactured through so-called make-and-pack processes. These processes consist of a make stage, a pack stage, and intermediate storage facilities that decouple these two stages. In operations scheduling, complex technological constraints must be considered, e.g., non-identical parallel processing units, sequence-dependent changeovers, batch splitting, no-wait restrictions, material transfer times, minimum storage times, and finite storage capacity. The short-term scheduling problem is to compute a production schedule such that a given demand for products is fulfilled, all technological constraints are met, and the production makespan is minimised. A production schedule typically comprises 500–1500 operations. Due to the problem size and complexity of the technological constraints, the performance of known mixed-integer linear programming (MILP) formulations and heuristic approaches is often insufficient. We present a hybrid method consisting of three phases. First, the set of operations is divided into several subsets. Second, these subsets are iteratively scheduled using a generic and flexible MILP formulation. Third, a novel critical path-based improvement procedure is applied to the resulting schedule. We develop several strategies for the integration of the MILP model into this heuristic framework. Using these strategies, high-quality feasible solutions to large-scale instances can be obtained within reasonable CPU times using standard optimisation software. We have applied the proposed hybrid method to a set of industrial problem instances and found that the method outperforms state-of-the-art methods.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A search for direct chargino production in anomaly-mediated supersymmetry breaking scenarios is performed in p p collisions at root s = 7 TeV using 4.7 fb(-1) of data collected with the ATLAS experiment at the LHC. In these models, the lightest chargino is predicted to have a lifetime long enough to be detected in the tracking detectors of collider experiments. This analysis explores such models by searching for chargino decays that result in tracks with few associated hits in the outer region of the tracking system. The transverse-momentum spectrum of candidate tracks is found to be consistent with the expectation from the Standard Model background processes and constraints on chargino properties are obtained.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper, we are concerned about the short-term scheduling of industrial make-and-pack production processes. The planning problem consists in minimizing the production makespan while meeting given end-product demands. Sequence-dependent changeover times, multi-purpose storage units with finite capacities, quarantine times, batch splitting, partial equipment connectivity, material transfer times, and a large number of operations contribute to the complexity of the problem. Known MILP formulations cover all technological constraints of such production processes, but only small problem instances can be solved in reasonable CPU times. In this paper, we develop a heuristic in order to tackle large instances. Under this heuristic, groups of batches are scheduled iteratively using a novel MILP formulation; the assignment of the batches to the groups and the scheduling sequence of the groups are determined using a priority rule. We demonstrate the applicability by means of a real-world production process.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The goal of the present thesis was to investigate the production of code-switched utterances in bilinguals’ speech production. This study investigates the availability of grammatical-category information during bilingual language processing. The specific aim is to examine the processes involved in the production of Persian-English bilingual compound verbs (BCVs). A bilingual compound verb is formed when the nominal constituent of a compound verb is replaced by an item from the other language. In the present cases of BCVs the nominal constituents are replaced by a verb from the other language. The main question addressed is how a lexical element corresponding to a verb node can be placed in a slot that corresponds to a noun lemma. This study also investigates how the production of BCVs might be captured within a model of BCVs and how such a model may be integrated within incremental network models of speech production. In the present study, both naturalistic and experimental data were used to investigate the processes involved in the production of BCVs. In the first part of the present study, I collected 2298 minutes of a popular Iranian TV program and found 962 code-switched utterances. In 83 (8%) of the switched cases, insertions occurred within the Persian compound verb structure, hence, resulting in BCVs. As to the second part of my work, a picture-word interference experiment was conducted. This study addressed whether in the case of the production of Persian-English BCVs, English verbs compete with the corresponding Persian compound verbs as a whole, or whether English verbs compete with the nominal constituents of Persian compound verbs only. Persian-English bilinguals named pictures depicting actions in 4 conditions in Persian (L1). In condition 1, participants named pictures of action using the whole Persian compound verb in the context of its English equivalent distractor verb. In condition 2, only the nominal constituent was produced in the presence of the light verb of the target Persian compound verb and in the context of a semantically closely related English distractor verb. In condition 3, the whole Persian compound verb was produced in the context of a semantically unrelated English distractor verb. In condition 4, only the nominal constituent was produced in the presence of the light verb of the target Persian compound verb and in the context of a semantically unrelated English distractor verb. The main effect of linguistic unit was significant by participants and items. Naming latencies were longer in the nominal linguistic unit compared to the compound verb (CV) linguistic unit. That is, participants were slower to produce the nominal constituent of compound verbs in the context of a semantically closely related English distractor verb compared to producing the whole compound verbs in the context of a semantically closely related English distractor verb. The three-way interaction between version of the experiment (CV and nominal versions), linguistic unit (nominal and CV linguistic units), and relation (semantically related and unrelated distractor words) was significant by participants. In both versions, naming latencies were longer in the semantically related nominal linguistic unit compared to the response latencies in the semantically related CV linguistic unit. In both versions, naming latencies were longer in the semantically related nominal linguistic unit compared to response latencies in the semantically unrelated nominal linguistic unit. Both the analysis of the naturalistic data and the results of the experiment revealed that in the case of the production of the nominal constituent of BCVs, a verb from the other language may compete with a noun from the base language, suggesting that grammatical category does not necessarily provide a constraint on lexical access during the production of the nominal constituent of BCVs. There was a minimal context in condition 2 (the nominal linguistic unit) in which the nominal constituent was produced in the presence of its corresponding light verb. The results suggest that generating words within a context may not guarantee that the effect of grammatical class becomes available. A model is proposed in order to characterize the processes involved in the production of BCVs. Implications for models of bilingual language production are discussed.