794 resultados para Construction site management
Resumo:
Irving Kane and Allen B. Pond, architects. Plans for the Union were on a scale unknown at the time for "club houses" in American colleges and universities: 250 feet long and 200 feet wide. Construction began in 1916 and owing to war time difficulties was not ready to be used by students until 1919. Two new wings to the south were completed in 1936 and 1938. The first wing runs parallel to the main structure while the other fronts on Madison Street. View of the construction site from the east.
Resumo:
Irving Kane and Allen B. Pond, architects. Plans for the Union were on a scale unknown at the time for "club houses" in American colleges and universities: 250 feet long and 200 feet wide. Construction began in 1916 and owing to war time difficulties was not ready to be used by students until 1919. Two new wings to the south were completed in 1936 and 1938. The first wing runs parallel to the main structure while the other fronts on Madison Street. View of the construction site from the southwest.
Resumo:
Irving Kane and Allen B. Pond, architects. Plans for the Union were on a scale unknown at the time for "club houses" in American colleges and universities: 250 feet long and 200 feet wide. Construction began in 1916 and owing to war time difficulties was not ready to be used by students until 1919. Two new wings to the south were completed in 1936 and 1938. The first wing runs parallel to the main structure while the other fronts on Madison Street. View of the construction site from the south.
Resumo:
Irving Kane and Allen B. Pond, architects. Plans for the Union were on a scale unknown at the time for "club houses" in American colleges and universities: 250 feet long and 200 feet wide. Construction began in 1916 and owing to war time difficulties was not ready to be used by students until 1919. Two new wings to the south were completed in 1936 and 1938. The first wing runs parallel to the main structure while the other fronts on Madison Street. View of the construction site from the south.
Resumo:
World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.
Resumo:
Mobile technologies have yet to be widely adopted by the Architectural, Engineering, and Construction (AEC) industry despite being one of the major growth areas in computing in recent years. This lack of uptake in the AEC industry is likely due, in large part, to the combination of small screen size and inappropriate interaction demands of current mobile technologies. This paper discusses the scope for multimodal interaction design with a specific focus on speech-based interaction to enhance the suitability of mobile technology use within the AEC industry by broadening the field data input capabilities of such technologies. To investigate the appropriateness of using multimodal technology for field data collection in the AEC industry, we have developed a prototype Multimodal Field Data Entry (MFDE) application. This application, which allows concrete testing technicians to record quality control data in the field, has been designed to support two different modalities of data input speech-based data entry and stylus-based data entry. To compare the effectiveness or usability of, and user preference for, the different input options, we have designed a comprehensive lab-based evaluation of the application. To appropriately reflect the anticipated context of use within the study design, careful consideration had to be given to the key elements of a construction site that would potentially influence a test technician's ability to use the input techniques. These considerations and the resultant evaluation design are discussed in detail in this paper.
Resumo:
Taiwan's technological five-year junior college (TFYJC) was founded in 1948 to train technicians to meet the demand coming from national construction. Site level professionals never were trained in curriculum development as this was under strict national control. The purpose of this study is to present an accurate narrative of Taiwan's TFYJC mechanical engineering curriculum development history in order to display the focus, rationale, and influencing forces of the evolving curriculum. This study employed historical research methodology and used document analysis as the primary approach.^ This analysis revealed that the target FYJC curriculum was manufacturing-oriented. The range of government control shifted from little, to full, then to partial control of the curriculum, from autonomy to uniformity then to partial autonomy. The intention of the target curriculum development was always to advance domestic economic development. Voices from the academia and government also influenced curriculum development decisions. Currently, the government has instituted a shift in focus and content causing individual institutions to develop curriculum responses addressing the challenge of advancing Taiwan's position in a global economy.^ Considering the shift in policy and practice, individual institutions intending to design curriculum are advised to implement empirical needs assessments of students, graduates, and employers and to engage in critical studies of emerging resources in order to provide effective in service training. To accomplish this end, TFYJC faculty and administration need training in curriculum theory and practice and evaluation. ^
Resumo:
During over seven decades of institutionalizing the national heritage protection legal instrument it can be noticed the many ways of the instrument application, according to the approaches that were assigned to the spaces with heritage values and the dynamic of the elaborated thoughts within this theme. For the application of the instrument effectively, there is a long process that is carried out. This process begins with the study elaboration that aims to subsidize and justify the motivation of property protection, as well as the proposal of buffer zones and national protection areas delimitations, completing the process with the denial of the request or with the publication of the definitive national protection area at the Official Gazette. Starting with the relation between the existing heritage values identification into the historical centres and the definition of its protection areas that the area management will be done, based as well into the management intervention norms established for the protection area perimeter. From this context, the present essay has as porpoise to discuss the approach used for the identification and selection of a historical centre liable for national protection and the repercussion of this identification into the national protection area the was established, using a case study of the national protection of the historical centre of the city of Natal. Starting from the assumption that there are inconsistences and distortions about the text speech of the written document and the spatial delimitation of this document, motivated by an area that privileges the edifications rather than the urban space. Beginning with the urban history methodology, we are based on the precepts of Rossi (2011), Lamas (2010) and Cullen (2009) for that space reading, along with what Sant’Anna (2004) defines as “city-document” to make a new reading of this “heritage value space” verifying if the proposed protection area reflects what is defined as motivation for the national protection area process during the recognizing process. Therefore, it is concluded that it is essential that the buffer zones and the national protection areas are aligned with the text presented at the national protection area instruction, so the norms and criteria definition management process are established. We highlight that a site management and the identified values protection become very difficult without a specific law that beacon the decisions that should be taken.
Resumo:
This article aims to investigate the possibilities of building puppets in art therapy workshop, for this it realizes a tour of the primitive use of the puppet as a magical twin and potential towards the study of authors who have used the puppets as a therapeutic tool from the first half of the twentieth century. It’s raised an own theoretical organization, which includes the consideration of the significance of the body in the construction and management of the puppet and the puppet transitional perspective, halfway of external reality and psychic reality as an object that makes fantasy and reality arises built.
Resumo:
Mestrado, Ensino de História e de Geografia no 3.º Ciclo do Ensino Básico e no Ensino Secundário, 27 de Junho de 2016, Universidade dos Açores (Relatório de Estágio).
Resumo:
Measuring the extent to which a piece of structural timber has distorted at a macroscopic scale is fundamental to assessing its viability as a structural component. From the sawmill to the construction site, as structural timber dries, distortion can render it unsuitable for its intended purposes. This rejection of unusable timber is a considerable source of waste to the timber industry and the wider construction sector. As such, ensuring accurate measurement of distortion is a key step in addressing ineffciencies within timber processing. Currently, the FRITS frame method is the established approach used to gain an understanding of timber surface profile. The method, while reliable, is dependent upon relatively few measurements taken across a limited area of the overall surface, with a great deal of interpolation required. Further, the process is unavoidably slow and cumbersome, the immobile scanning equipment limiting where and when measurements can be taken and constricting the process as a whole. This thesis seeks to introduce LiDAR scanning as a new, alternative approach to distortion feature measurement. In its infancy as a measurement technique within timber research, the practicalities of using LiDAR scanning as a measurement method are herein demonstrated, exploiting many of the advantages the technology has over current approaches. LiDAR scanning creates a much more comprehensive image of a timber surface, generating input data multiple magnitudes larger than that of the FRITS frame. Set-up and scanning time for LiDAR is also much quicker and more flexible than existing methods. With LiDAR scanning the measurement process is freed from many of the constraints of the FRITS frame and can be done in almost any environment. For this thesis, surface scans were carried out on seven Sitka spruce samples of dimensions 48.5x102x3000mm using both the FRITS frame and LiDAR scanner. The samples used presented marked levels of distortion and were relatively free from knots. A computational measurement model was created to extract feature measurements from the raw LiDAR data, enabling an assessment of each piece of timber to be carried out in accordance with existing standards. Assessment of distortion features focused primarily on the measurement of twist due to its strong prevalence in spruce and the considerable concern it generates within the construction industry. Additional measurements of surface inclination and bow were also made with each method to further establish LiDAR's credentials as a viable alternative. Overall, feature measurements as generated by the new LiDAR method compared well with those of the established FRITS method. From these investigations recommendations were made to address inadequacies within existing measurement standards, namely their reliance on generalised and interpretative descriptions of distortion. The potential for further uses of LiDAR scanning within timber researches was also discussed.
Resumo:
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Arquitetura e Urbanismo, Programa de Pós-Graduação em Arquitetura e Urbanismo, 2015.
Resumo:
In Italia, quasi il 90% delle abitazioni esistenti sono state edificate prima degli anni Settanta del Novecento, se consideriamo la tipologia costruttiva, le normative per la sicurezza strutturale in ambito sismico e il comportamento energetico, ne deriva che la maggior parte non risponde agli standard vigenti. A questo si aggiunge la consapevolezza che il patrimonio residenziale costruito in quel periodo, e che occupa le prime periferie delle città, non si presta per sua natura costitutiva ad essere oggetto di interventi di riqualificazione che siano giustificabili in termini di costi-benefici dal punto di vista economico e per ottimizzazione ingegneristica. È opportuno ripensare piani e programmi di rinnovamento non circoscritti alle categorie di risanamento, efficientamento, manutenzione, adeguamento, ma che siano in grado di assumere in positivo il tema della sostituzione secondo il paradigma del ri-costruire per ri-generare per sviluppare strategie a medio-lungo termine per soddisfare un quadro esigenziale-prestazionale coerente con la legislazione europea, in termini di sicurezza, efficienza e impatto ambientale, e promuovere la pianificazione e lo sviluppo sostenibile delle città. L’edilizia circolare è qui intesa come un’attività finalizzata alla costruzione e gestione degli edifici all’interno di un ecosistema economico basato sulla circolarità dei processi. L’obiettivo della ricerca è duplice: (i) metodologico, rivolto alla formalizzazione di un modello innovativo d’intervento associato ai principi della circolarità e basato sulla conoscenza approfondita del patrimonio esistente; e (ii) progettuale, prevede la progettazione di un prototipo di unità abitativa e l’applicazione del modello ad un caso di studio, che viene assunto come applicazione sperimentale ad un contesto reale e momento conclusivo del processo. La definizione di una matrice valutativa consente di formulare indicazioni operative nella fase precedente l’intervento per rendere espliciti, attraverso un indice sintetico di supporto decisionale, i criteri su cui fondare le scelte tra le due macro-categorie di intervento (demolizione con ricostruzione o rinnovo).
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores
Resumo:
Construction and demolition waste management is becoming increasingly important on construction sites as landfill space in Ireland is rapidly depleting and waste management costs are rising. Due to these factors waste management plans are seen as a good response to minimising waste on site and this thesis aims to investigate how to implement such a plan on a practical case study as well as investigating the legislation regarding construction and demolition waste along with market availability for the reuse of the waste. Main contractor surveys were also carried out in order to gain a better understanding of current attitudes within the industry and these surveys are analysed in chapter five. A survey was also carried out among sub-contractors but this survey has not been used for this thesis as the study is on-going. The primary aim of this thesis is to examine the waste hierarchy opportunities that are available for construction and demolition waste in Ireland and to examine the effects of management strategies on construction and demolition waste reduction at the project level. A partnership was developed with Carey Developments Ltd in Co. Galway and an analysis of their waste management practices was undertaken. The primary case study will be the ‘Taylors Hill’ project in Co. Galway where work commenced in March, 2012. The secondary aim of the thesis is to develop specific waste minimisation strategies for the company and to develop a training tool kit for use on site.