899 resultados para BIM, Masterseries, Navisworks, Revit, Project Management, Portal Frame, Collaboration
Resumo:
World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.
Resumo:
This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.
Resumo:
It is presented a research on the application of a collaborative learning and authoring during all delivery phases of e-learning programmes or e-courses offered by educational institutions. The possibilities for modelling of an e-project as a specific management process based on planned, dynamically changing or accidentally arising sequences of learning activities, is discussed. New approaches for project-based and collaborative learning and authoring are presented. Special types of test questions are introduced which allow test generation and authoring based on learners’ answers accumulated in the frame of given e-course. Experiments are carried out in an e-learning environment, named BEST.
Resumo:
Projects, as an organizing principle, can provide exciting contexts for innovative work. Thus far, project management discourse has tended to privilege the vital need to deliver projects ‘on time, on budget, and to specification’. In common with the call for papers for this workshop we suggest that perhaps the “instrumental rationality” underpinning this language of characterising project activity may create more problems than it solves. In this paper we suggest that such questions (and language) frame project contexts in a partial way. We argue that such concerns stem from a particular worldview or ontology, which we identify as a ‘being’ ontology. Here we contrast being and becoming project ontologies, to explore the questions, methods and interventions that each foregrounds. In an attempt to move this dialogue further than simply another contrast of modern and postmodernist accounts of project organising, we go on to consider some possible ethical concomitants of valuing being and becoming ontologies in project contexts.
Resumo:
A knowledge management tool developed by the GIS Center for to support project reporting tools, project publications, and a project data portal for materials related to the WAWASH Program.
Resumo:
Il lavoro svolto in questa tesi vuole proporsi come un’analisi critica ed economica di ciò che il Building Information Modeling (BIM) rappresenta. La tesi si articola in una prima introduzione sul panorama attuale, identificando il problema che costituisce la sfida ingegneristica: l’ottimizzazione dei processi tecnici e realizzativi dell’industria delle costruzioni, migliorandone l’interoperabilità. Di seguito, dopo un’attenta valutazione della letteratura disponibile, si desumeranno quanti più dati validi per dare compiutezza alle analisi che verranno svolte dopo, in merito agli aspetti tecnici, pratici, e ai risvolti economici annessi. Si è scelto come oggetto di studio un esperimento di collaborazione con l’Università di Ferrara. Per dimostrare le potenzialità del BIM, si è voluto riproporre in ambito accademico un’anteprima della realtà professionale, affinché la simulazione possa essere quanto più fedele alle problematiche discusse. Il lavoro svolto ha previsto la creazione del modello architettonico e strutturale del Co-Housing San Rocco, un complesso di edifici di nuova realizzazione proposto nella tesi di Bulletti. Il compito di ogni tesista è ben definito: Bulletti Simone, studente di Architettura dell’Università di Ferrara, ha trattato gli aspetti architettonici del progetto. L’autore della presente tesi ha invece sviluppato il modello strutturale, svolgendo in seguito un’analisi dei vantaggi economici e gestionali che questa metodologia ha offerto.
Resumo:
This article presents a fieldbus simulation platform and its remote access interface that enables a wide range of experiments, where users can configure operation sequences and procedures typical of Foundation Fieldbus systems. The simulation system was developed using LabVIEW, with requisites of deterministic execution, and a course management work frame web server called Moodle. The results were obtained through three different evaluations: schedule table execution, simulator functionality and finally, simulator productivity and achievement. The evaluation attests that this new tool is feasible, and can be applied for fieldbus automation systems training purposes, considering the robustness and stability in tests and the positive feedback from users. (C) 2008 ISA. Published by Elsevier Ltd. All rights reserved.
Resumo:
A major challenge in successfully implementing transit-oriented development (TOD) is having a robust process that ensures effective appraisal, initiation and delivery of multi-stakeholder TOD projects. A step-by step project development process can assist in the methodic design, evaluation, and initiation of TOD projects. Successful TOD requires attention to transit, mixed-use development and public space. Brisbane, Australia provides a case-study where recent planning policies and infrastructure documents have laid a foundation for TOD, but where barriers lie in precinct level planning and project implementation. In this context and perhaps in others, the research effort needs to shift toward identification of appropriate project processes and strategies. This paper presents the outcomes of research conducted to date. Drawing on the mainstream approach to project development and financial evaluation for property projects, key steps for potential use in successful delivery of TOD projects have been identified, including: establish the framework; location selection; precinct context review; preliminary precinct design; the initial financial viability study; the decision stage; establishment of project structure; land acquisition; development application; and project delivery. The appropriateness of this mainstream development and appraisal process will be tested through stakeholder research, and the proposed process will then be refined for adoption in TOD projects. It is suggested that the criteria for successful TOD should be broadened beyond financial concerns in order to deliver public sector support for project initiation.
Resumo:
We describe administrative reform involving management innovation undertaken at the Superior Tribunal of Justice, Brazil`s highest appellate court for infra-constitutional cases. The innovation is the introduction of a new management model based on strategic planning and a process management approach to work processes. Introduction of the new model has been supported by the use of information technology and project management techniques. Qualitative methods were used for data collection and analysis. Findings reveal that the innovation is contributing to the development of a systemic overview of key processes, reducing the fragmenting effects of the division of work activities within the Tribunal. At least three new organizational routines or capabilities have been developed as a result of the innovation studied: Electronic Court Management, Project Management, and Process Management. The paper contributes to knowledge about court management, a field that has received little research attention in the public administration literature.
Resumo:
A construction project is a group of discernible tasks or activities that are conduct-ed in a coordinated effort to accomplish one or more objectives. Construction projects re-quire varying levels of cost, time and other resources. To plan and schedule a construction project, activities must be defined sufficiently. The level of detail determines the number of activities contained within the project plan and schedule. So, finding feasible schedules which efficiently use scarce resources is a challenging task within project management. In this context, the well-known Resource Constrained Project Scheduling Problem (RCPSP) has been studied during the last decades. In the RCPSP the activities of a project have to be scheduled such that the makespan of the project is minimized. So, the technological precedence constraints have to be observed as well as limitations of the renewable resources required to accomplish the activities. Once started, an activity may not be interrupted. This problem has been extended to a more realistic model, the multi-mode resource con-strained project scheduling problem (MRCPSP), where each activity can be performed in one out of several modes. Each mode of an activity represents an alternative way of combining different levels of resource requirements with a related duration. Each renewable resource has a limited availability for the entire project such as manpower and machines. This paper presents a hybrid genetic algorithm for the multi-mode resource-constrained pro-ject scheduling problem, in which multiple execution modes are available for each of the ac-tivities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme. It is evaluated the quality of the schedules and presents detailed comparative computational re-sults for the MRCPSP, which reveal that this approach is a competitive algorithm.
Resumo:
This paper presents a genetic algorithm for the resource constrained multi-project scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on a set of randomly generated problems. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm
Resumo:
This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.