970 resultados para 120201 Building Construction Management and Project Planning


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The growing awareness of sustainability issues around the world has put extensive pressure on the construction industry to improve its sustainable practice. Sustainability principles need to be applied to not just during design and construction phase but the entire life cycle of a construction project. Compared to sustainability endeavours on earlier development phases, the pace to implement sustainability agenda during the operation and maintenance phase has not been as fast during past practices of facilities management (FM). Literature study suggests that sustainable practices in FM activities can bring substantial benefits such as reducing energy consumptions and waste, while increasing productivity, financial return and standing in the community. It also suggests several barriers which inhibit the implementation of sustainability in FM practices, including the lack of knowledge, discrepancy between capability and skills, and unwillingness of the FM personnel and organizations to adapt to new routines in order to implement sustainability in their business. The capabilities of FM personnel and organizations were regarded as the key enablers in managing sustainability knowledge. In a sustainable development context, capabilities are vital to the fostering of competency in an organization to innovate in a more sustainable way and support the agenda in an organization. Additionally, research which focused on people’s capabilities and skills is still lagging behind the efforts to develop guidelines, technical manuals and knowledge portals. Therefore, it is beneficial to explore the issues of capabilities in dealing with the implementation of sustainable practices in FM. This paper introduces a research project which is aimed at establishing a knowledge capabilities framework for promoting sustainability measures in FM practices. It will explore and highlight challenges to integrate sustainability as well as the personnel and organizational capabilities that are vital in dealing with knowledge issues in implementing sustainability agenda in FM practices. The expected outcome of this research has the potential to further sustainability endeavours in FM practices, while providing a useful source of knowledge to the FM personnel and organizations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) appears to be the next evolutionary link in project delivery within the AEC (Architecture, Engineering and Construction) Industry. There have been several surveys of implementation at the local level but to date little is known of the international context. This paper is a preliminary report of a large scale electronic survey of the implementation of BIM and the impact on AEC project delivery and project stakeholders in Australia and internationally. National and regional patterns of BIM usage will be identified. These patterns will include disciplinary users, project lifecycle stages, technology integration–including software compatibility—and organisational issues such as human resources and interoperability. Also considered is the current status of the inclusion of BIM within tertiary level curricula and potential for the creation of a new discipline.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A considerable amount of research has confirmed the relationship between organizational culture and knowledge sharing behaviours. However, less research has been conducted on the impact of project sub-cultures in relation to the sharing of knowledge between projects, particularly in project based organizations (PBOs). The unique structures and contexts characterized by PBOs indicate the need to investigate further the impact of cultures present within PBOs and their effect on knowledge sharing. We report on a rich case study of four large Australian-based PBOs whereby the cultural values of these large organizations were seen to impact significantly on whether project teams were more or less likely to improve inter-project knowledge sharing. Furthermore, this research demonstrates the utility of using Cameron and Quinn's (2005) Competing Values Framework to evaluate culture in the context of PBOs

Relevância:

100.00% 100.00%

Publicador:

Resumo:

All civil and private aircraft are required to comply with the airworthiness standards set by their national airworthiness authority and throughout their operational life must be in a condition of safe operation. Aviation accident data shows that over twenty percent of all fatal accidents in aviation are due to airworthiness issues, specifically aircraft mechanical failures. Ultimately it is the responsibility of each registered operator to ensure that their aircraft remain in a condition of safe operation, and this is done through both effective management of airworthiness activities and the effective program governance of safety outcomes. Typically, the projects within these airworthiness management programs are focused on acquiring, modifying and maintaining the aircraft as a capability supporting the business. Program governance provides the structure through which the goals and objectives of airworthiness programs are set along with the means of attaining them. Whilst the principal causes of failures in many programs can be traced to inadequate program governance, many of the failures in large scale projects can have their root causes in the organisational culture and more specifically in the organisational processes related to decision-making. This paper examines the primary theme of project and program based enterprises, and introduces a model for measuring organisational culture in airworthiness management programs using measures drawn from 211 respondents in Australian airline programs. The paper describes the theoretical perspectives applied to modifying an original model to specifically focus it on measuring the organisational culture of programs for managing airworthiness; identifying the most important factors needed to explain the relationship between the measures collected, and providing a description of the nature of these factors. The paper concludes by identifying a model that best describes the organisational culture data collected from seven airworthiness management programs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many construction industry decision-makers believe there is a lack of off-site manufacture (OSM) adoption for non-residential construction in Australia. Identification of construction business process was considered imperative in order to assist decision-makers to increase OSM utilisation. The premise that domain knowledge can be re-used to provide an intervention point in the construction process led a team of researchers to construct simple base-line process models for the complete construction process, segmented into six phases. Sixteen domain knowledge industry experts were asked to review the construction phase base-line models to answer the question “Where in the process illustrated by this base-line model phase is an OSM task?”. Through an iterative and generative process a number of off-site manufacture intervention points were identified and integrated into the process models. The re-use of industry expert domain knowledge provided suggestions for new ways to do basic tasks thus facilitating changes to current practice. It is expected that implementation of the new processes will lead to systemic industry change and thus a growth in productivity due to increased adoption of OSM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – Within the construction industry there is a growing awareness of the need for linking knowledge management (KM) to business strategy, organisational objectives and existing performance measures. This study was undertaken within the context of construction organisations, and attempts to provide the empirical evidence about the relationships between KM activities and organisational business performance. Design/methodology/approach – A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to investigate the opinions of construction professionals regarding the intensity of KM activities and business performance within their organisations. In parallel to the survey, semi-structured interviews were undertaken to provide qualitative insights that helped to clarify and deepen understanding of the KM process within the context of the research target. Findings – The investigation shows that knowledge utilisation is the strongest contributor to general business performance. In addition, the impact of KM activities on the lagging performance indicators of the Balanced Scorecard (BSC), such as “financial performance”, is in an indirect manner, and through the leading indicators such as performance from “internal process” as well as “learning and growth” perspectives. Originality/value – The study empirically establishes the linkage between intensity of KM activities and business performance, and demonstrates that KM strategies need to be explicitly formulated and measured according to organisational business objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building information modeling (BIM) is an emerging technology and process that provides rich and intelligent design information models of a facility, enabling enhanced communication, coordination, analysis, and quality control throughout all phases of a building project. Although there are many documented benefits of BIM for construction, identifying essential construction-specific information out of a BIM in an efficient and meaningful way is still a challenging task. This paper presents a framework that combines feature-based modeling and query processing to leverage BIM for construction. The feature-based modeling representation implemented enriches a BIM by representing construction-specific design features relevant to different construction management (CM) functions. The query processing implemented allows for increased flexibility to specify queries and rapidly generate the desired view from a given BIM according to the varied requirements of a specific practitioner or domain. Central to the framework is the formalization of construction domain knowledge in the form of a feature ontology and query specifications. The implementation of our framework enables the automatic extraction and querying of a wide-range of design conditions that are relevant to construction practitioners. The validation studies conducted demonstrate that our approach is significantly more effective than existing solutions. The research described in this paper has the potential to improve the efficiency and effectiveness of decision-making processes in different CM functions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – Recent knowledge management (KM) literature suggests that KM activities are not independent of each other, rather they interact with each other to form a process which receives input from both external and internal business environments, and then produces new knowledge for future utilisation. The purpose of this paper is to empirically investigate the relationships between KM activities within the construction business context in order to identify and map the pattern of their interactions. Design/methodology/approach – A questionnaire survey was administered to a sample of contracting organisations operating in Hong Kong to elicit opinions of construction professionals on the intensity of KM activities currently being executed by their organisations in order to facilitate knowledge capture, sharing and utilisation. More than 150 respondents from 99 organisations responded to the survey. Additionally, a total of 15 semi-structured interviews were undertaken to provide a unique perspective on many of the challenges facing local construction organisations when dealing with KM activities. Findings – Knowledge acquisition and utilisation play paramount roles in the development of the organisational knowledge asset. The higher the intensity of these two activities, the larger the organisational knowledge pool which, in turn, demands greater knowledge dissemination capacity. This dissemination capacity enables more active and intense responses to market changes and clients' needs, thus facilitating and stimulating acquisition and utilisation of new tacit knowledge, thus improving organisational business performance. Originality/value – Interactions between KM activities were empirically investigated, from a strategic perspective, in the construction business context.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, there has been a growing interest from the design and construction community to adopt Building Information Models (BIM). BIM provides semantically-rich information models that explicitly represent both 3D geometric information (e.g., component dimensions), along with non-geometric properties (e.g., material properties). While the richness of design information offered by BIM is evident, there are still tremendous challenges in getting construction-specific information out of BIM, limiting the usability of these models for construction. In this paper, we describe our approach for extracting construction-specific design conditions from a BIM model based on user-defined queries. This approach leverages an ontology of features we are developing to formalize the design conditions that affect construction. Our current implementation analyzes the component geometry and topological relationships between components in a BIM model represented using the Industry Foundation Classes (IFC) to identify construction features. We describe the reasoning process implemented to extract these construction features, and provide a critique of the IFC’s to support the querying process. We use examples from two case studies to illustrate the construction features, the querying process, and the challenges involved in deriving construction features from an IFC model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure and its causes and effects are often overlooked when schedule decisions are being made. This paper analyses the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pressure arise mainly by working out of sequence, generating work defects, cutting corners, and losing the motivation to work. The adverse effects of schedule pressure can be minimized by scheduling construction activities realistically and planning them proactively, motivating workers, and by establishing an effective project coordination and communication mechanism.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Previous research on construction innovation has commonly recognized the importance of the organizational climate and key individuals, often called “champions,” for the success of innovation. However, it rarely focuses on the role of participants at the project level and addresses the dynamics of construction innovation. This paper therefore presents a dynamic innovation model that has been developed using the concept of system dynamics. The model incorporates the influence of several individual and situational factors and highlights two critical elements that drive construction innovations: (1) normative pressure created by project managers through their championing behavior, and (2) instrumental motivation of team members facilitated by a supportive organizational climate. The model is qualified empirically, using the results of a survey of project managers and their project team members working for general contractors in Singapore, by assessing casual relationships for key model variables. Finally, the paper discusses the implications of the model structure for fostering construction innovations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Knowledge Management (KM) is a process that focuses on knowledge-related activities to facilitate knowledge creation, capture, transformation and use, with the ultimate aim of leveraging organisations’ intellectual capital to achieve organisational objectives. The KM process receives input from its context (e.g. internal business environment), and produces output (i.e. knowledge). It is argued that the validity of such knowledge should be justified by business performance. The study, this paper reports on, provides enhanced empirical understanding of such an input-process-output relationship through investigating the interactions among different KM activities in the context of how construction organisations in Hong Kong manage knowledge. To this end, a theoretical framework along with a number of hypotheses are proposed and empirically tested through correlation, regression and path analyses. A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to facilitate testing the proposed relationships. More than 140 respondents from 99 organisations responded to the survey. The study findings demonstrate that both organisational and technical environments have the potential to predict the intensity of KM activities. Furthermore, different categories of KM activities interact with each other, and collectively they could be used to predict business performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the movement for economic reform started in China 20 years ago, the nation's GDP had grown on average from seven to nine per cent a year, making China's construction industry one of the largest in the world. This paper presents an overview of China's foreign economic cooperation development (FECD) in the context of exporting three major construction services namely; contracting, labour and design. The paper outlines the export market profile of Chinese contractors and discusses their current position in the international market. It then addresses challenges; they are facing in view of meeting the ambitious strategic targets set out by the Government for the FECD, which cover the export of construction services. Finally, the paper sheds some light on key exporting strategies currently adopted by Chinese contractors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A theoretical framework for a construction management decision evaluation system for project selection by means of a literature review. The theory is developed by the examination of the major factors concerning the project selection decision from a deterministic viewpoint, where the decision-maker is assumed to possess 'perfect knowledge' of all the aspects involved. Four fundamental project characteristics are identified together with three meaningful outcome variables. The relationship within and between these variables are considered together with some possible solution techniques. The theory is next extended to time-related dynamic aspects of the problem leading to the implications of imperfect knowledge and a non­deterministic model. A solution technique is proposed in which Gottinger's sequential machines are utilised to model the decision process,

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dynamic capability theory asserts that the learning capabilities of construction organisations influence the degree to which value-for-money (VfM) is achieved on collaborative projects. However, there has been little study conducted to verify this relationship. The evidence is particularly limited within the empirical context of infrastructure delivery in Australia. Primarily drawing on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991), dynamic capabilities (e.g. Helfat et al. 2007), absorptive capacity (e.g. Lane et al. 2006) and knowledge management (e.g. Nonaka 1994), this paper conceptualises learning capability as a knowledge-based dynamic capability. Learning capability builds on the micro-foundations of high-order learning routines, which are deliberately developed by construction organisations for managing collaborative projects. Based on this conceptualisation of learning capability, an exploratory case study was conducted. The study investigated the operational and higher-order learning routines adopted by a project alliance team to successfully achieve VfM. The case study demonstrated that the learning routines of the alliance project were developed and modified by the continual joint learning activities of participant organisations. Project-level learning routines were found to significantly influence the development of organisational-level learning routines. In turn, the learning outcomes generated from the alliance project appeared to significantly influence the development of project management routines and contractual arrangements applied by the participant organisations in subsequent collaborative projects. The case study findings imply that the higher-order learning routines that underpin the learning capability of construction organisations have the potential to influence the VfM achieved on both current and future collaborative projects.