981 resultados para stakeholder relationship


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The intimacy and eroticism of the actor’s relationship with the audience is captured in the ecstatic revelation of the actor “being in the moment.” Drawing on the theories of Freud and Sartre and twenty years of performance praxis, this paper explores the exchange of erotic discourse between stage and spectator that not only heightens the experience of the liveness of theatre, but creates a symbiosis that is silently negotiated, agreed upon and sensuously performed during the suspended timeframe of the theatrical event. The actor draws the audience into the erotic transaction through various dramatic devices: the seduction of the soliloquy, the somatic and verbal discourses, the sensuality of light and costuming. The audience responds with its own paralingual and verbal foreplay: the playfulness of laughter, the slapping of hands and, most significantly, the gaze. While the gaze is often perceived as a form of voyeurism, this paper argues that the gaze of consensual agreement between audience and actor can work to unmask inhibitions enabling the actor to create the truth of the moment in complete abandon.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A hip fracture causes permanent changes to life style for older people. Further, two important mortality indicators found post operatively for this group include, the time until surgery after fracture, and pre-operative health status prior to surgery, yet no research is available investigating relationships between time to surgery and health status. The researchers aimed to establish the health status risks for patients aged over 65 years with a non-pathological hip fracture to guide nursing care interventions. A prospective cohort design was used to investigate relationships between time to surgery and measures on pre-operative health status indicators including, skin integrity risk, vigor, mental state, bowel function and continence. Twenty-nine patients with a mean age in years of 81.93 (SD,9.49), were recruited. The mean number of hours from time 1 assessment to surgery was 52.72 (SD,58.35) and the range was 1 hour to 219 hours. At Time 2, the mean scores of vigor and skin integrity risk were significantly higher, indicating poorer health status. A change in health status occurred but possibly due to the small sample size it was difficult to relate this result to time. However the results informed preoperative care prior to surgery, for this group.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The advent of data breach notification laws in the United States (US) has unearthed a significant problem involving the mismanagement of personal information by a range of public and private sector organisations. At present, there is currently no statutory obligation under Australian law requiring public or private sector organisations to report a data breach of personal information to law enforcement agencies or affected persons. However, following a comprehensive review of Australian privacy law, the Australian Law Reform Commission (ALRC) has recommended the introduction of a mandatory data breach notification scheme. The issue of data breach notification has ignited fierce debate amongst stakeholders, especially larger private sector entities. The purpose of this article is to document the perspectives of key industry and government representatives to identify their standpoints regarding an appropriate regulatory approach to data breach notification in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Marinas currently exist primarily to service recreational boats, and these vessels are a potential cause of both problems and opportunities in environmental management. Thus, on the one hand, destructive fuel and other pollutants may be expelled, boat wakes can cause littoral soil erosion, physical damage results from collisions with marine life, and litter and noise pollution occur in otherwise pristine habitat. Boats also provide access to otherwise inaccessible natural environments for educational and other management reasons. In this study, boat traffic at three large marinas located along the Queensland coastline has been field surveyed for introductory information. No attempt was made at this juncture to survey the behaviour of the boat crews and passengers (concerning actual destinations, activities on board, etc. or to survey the recreational boat industry. Such studies rely on boat registration records and personal questionnaires. Some other surveys relating to fishing draw on boat ramp surveys and direct submissions by recreational fishers; these provide some data on daily usage of boat ramps, but without particular attention to boats. We believe field observations of overall boat activities in the water are necessary for environmental management purposes. The aim of the survey was to provide information to help prioritize the potential impacts that boats’ activities have on the surrounding natural environment. Any impact by boats will be a product of their numbers, size, frequency of movement, carrying capacity and routes/destinations. The severity of impacts will dictate the appropriate management action.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This investigation describes the prevalence of upper-body symptoms in a population-based sample of women with breast cancer (BC) and examines their relationships with upper-body function (UBF) and lymphoedema, as two clinically important sequelae. Australian women (n=287) with unilateral BC were assessed at three-monthly intervals, from six to 18 months post-surgery (PS). Participants reported the presence and intensity of upper-body symptoms on the treated side. Objective and self-reported UBF and lymphoedema (bioimpedance spectroscopy) were also assessed. Approximately 50% of women reported at least one moderate-to-extreme symptom at 6- and at 18-months PS. There was a significant relationship between symptoms and function (p<0.01), whereby perceived and objective function declined with increasing number of symptoms present. Those with lymphoedema were more likely to report multiple symptoms and presence of symptoms at baseline increased risk of lymphoedema (ORs>1.3, p=0.02). Although, presence of symptoms explained only 5.5% of the variation in the odds of lymphoedema. Upper-body symptoms are common and persistent following breast cancer and are associated with clinical ramifications, including reduced UBF and increased risk of developing lymphoedema. However, using the presence of symptoms as a diagnostic indicator of lymphoedema is limited.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The nature of the relationship that is negotiated, developed and maintained between a clinical supervisor and supervisee is central to effectively engage in clinical work, to promote professional and personal development, and to ensure consistent ethical practice. In this chapter attention is given to the challenges, importance and benefits of the supervisory relationship. The ability to form and sustain relationships in supervision and in clinical practice is more crucial than specific knowledge and therapeutic skills (Dye, 2004). Attention to parallel process, the working alliance, multiple roles, expectations and acculturative issues are addressed. This is an introduction to some of the most salient issues concerning the supervisory relationship and is a review of concepts and processes discussed in greater depth throughout this textbook. The reader is encouraged to utilise the references and suggested readings to deepen their understanding of the supervisory relationship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this reply we show that the Nüesch (2009) comment paper to our initial contribution (Torgler and Schmidt 2007) has several shortcomings. He suggests that professional soccer wages seem to buy talent rather than motivation. We therefore provide a larger set of talent proxies and estimations to check whether this assertion is correct. Our results indicate that his conclusion is problematic. We still observe a strong motivational effect, and in some cases the effect is even larger than the talent effect. A further key problem in Nüesch’s contribution is the fact that he neglects to consider the relevance of the relative salary situation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of appropriate financial incentives within construction projects can contribute to strong alignment of project stakeholder motivation with project goals. However, effective incentive system design can be a challenging task and takes skillful planning by client managers in the early stages of a project. In response to a lack of information currently available to construction clients in this area, this paper explores the features of a successful incentive system and identifies key learnings for client managers to consider when designing incentives. Our findings, based on data from a large Australian case study, suggest that key stakeholders place greater emphasis on the project management processes that support incentives than on the incentive itself. Further, contractors need adequate time and information to accurately estimate construction costs prior to their tender price submission to ensure cost-focused incentive goals remain achievable. Thus, client managers should be designing incentives as part of a supportive procurement strategy to maximize project stakeholder motivation and prevent goal misalignment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Prospective clinical case series of 100 patients receiving thoracoscopic anterior scoliosis correction surgery. The objective was to evaluate the relationship between clinical outcomes of thoracoscopic anterior scoliosis surgery and deformity correction using the Scoliosis Research Society (SRS) outcomes instrument questionnaire. The surgical treatment of scoliosis is quantitatively assessed in the clinic using radiographic measures of deformity correction, as well as the rib hump, but it is important to understand the extent to which these quantitative measures correlate with self-reported improvements in patients’ quality of life following surgery. A series of 100 consecutive adolescent idiopathic scoliosis patients received a single anterior rod via a thoracoscopic approach at the Mater Children’s Hospital, Brisbane, Australia. Patients completed SRS outcomes questionnaires pre-operatively and at 24 months post-operatively. There were 94 females and 6 males with a mean age of 16.1 years. The mean Cobb angle improved from 52º pre-operatively to 25º post-operatively (52%) and the mean rib hump improved from 16º to 8º (51%). The mean total SRS score for the cohort was 99.4/120. None of the deformity related parameters in the multiple regression were significant. However, patients with the lowest post-operative major Cobb angles reported significantly higher SRS scores than those with the highest post-operative Cobb angles, but there was no difference on the basis of rib hump correction. There were no significant differences between patients with either rod fractures or screw-related complications compared to those without complications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Successful construction project managers often stress the importance of team working, relationship management, project environment and senior management commitment as being key determinants of project success. However, it is generally accepted that the construction industry has stronger preference for displaying distrust rather than emancipating the full benefits of cooperation. In the research domain, the impact of culture and organisation on project performance is becoming an increasingly important topic for the establishment of a sound relational approach to projects. Relational procurement strategies emphasise the importance of sustainable relationships. However, the efficacy of relational contracting is, so far, unproven. This study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. Initial findings captured from a survey undertaken with construction contracting organisations in Australia, where the perceptions of professional personnel and supply chain relationships are reported in this paper. A four-level project performance effectiveness model developed in this research is also presented.