984 resultados para operation characteristics
Resumo:
Recently, unlike conventional method in supplying shielding gas, a newly method which alternately supplies different kinds of shielding gases in weld zone is developed and partly commercialized. However, literature related to the present status of the technology in the actual weld field is very scant. To give better understand on this technology, this study was performed. Compared with conventional gas supply method, the variations of weld porosity and weld shape in aluminum welding with alternate supply method of pure argon and pure helium were compared with conventional gas supply method with pure argon and argon + 67%helium mixture, respectively. As a result, compared with the welding by supplying pure argon and argon + 67%helium mixture by conventional method, the welding by supplying alternately pure argon and pure helium, produced lower degree of weld porosity and deeper and broader weld penetration profile.
Resumo:
The finite element and boundary element methods are employed in this study to investigate the sound radiation characteristics of a box-type structure. It has been shown [T.R. Lin, J. Pan, Vibration characteristics of a box-type structure, Journal of Vibration and Acoustics, Transactions of ASME 131 (2009) 031004-1–031004-9] that modes of natural vibration of a box-type structure can be classified into six groups according to the symmetry properties of the three panel pairs forming the box. In this paper, we demonstrate that such properties also reveal information about sound radiation effectiveness of each group of modes. The changes of radiation efficiencies and directivity patterns with the wavenumber ratio (the ratio between the acoustic and the plate bending wavenumbers) are examined for typical modes from each group. Similar characteristics of modal radiation efficiencies between a box structure and a corresponding simply supported panel are observed. The change of sound radiation patterns as a function of the wavenumber ratio is also illustrated. It is found that the sound radiation directivity of each box mode can be correlated to that of elementary sound sources (monopole, dipole, etc.) at frequencies well below the critical frequency of the plates of the box. The sound radiation pattern on the box surface also closely related to the vibration amplitude distribution of the box structure at frequencies above the critical frequency. In the medium frequency range, the radiated sound field is dominated by the edge vibration pattern of the box. The radiation efficiency of all box modes reaches a peak at frequencies above the critical frequency, and gradually approaches unity at higher frequencies.
Resumo:
Principal Topic: It is well known that most new ventures suffer from a significant lack of resources, which increases the risk of failure (Shepherd, Douglas and Shanley, 2000) and makes it difficult to attract stakeholders and financing for the venture (Bhide & Stevenson, 1999). The Resource-Based View (RBV) (Barney, 1991; Wernerfelt, 1984) is a dominant theoretical base increasingly drawn on within Strategic Management. While theoretical contributions applying RBV in the domain of entrepreneurship can arguably be traced back to Penrose (1959), there has been renewed attention recently (e.g. Alvarez & Busenitz, 2001; Alvarez & Barney, 2004). This said, empirical work is in its infancy. In part, this may be due to a lack of well developed measuring instruments for testing ideas derived from RBV. The purpose of this study is to develop a measurement scales that can serve to assist such empirical investigations. In so doing we will try to overcome three deficiencies in current empirical measures used for the application of RBV to the entrepreneurship arena. First, measures for resource characteristics and configurations associated with typical competitive advantages found in entrepreneurial firms need to be developed. These include such things as alertness and industry knowledge (Kirzner, 1973), flexibility (Ebben & Johnson, 2005), strong networks (Lee et al., 2001) and within knowledge intensive contexts, unique technical expertise (Wiklund and Shepard, 2003). Second, the RBV has the important limitations of being relatively static and modelled on large, established firms. In that context, traditional RBV focuses on competitive advantages. However, newly established firms often face disadvantages, especially those associated with the liabilities of newness (Aldrich & Auster, 1986). It is therefore important in entrepreneurial contexts to expand to an investigation of responses to competitive disadvantage through an RBV lens. Conversely, recent research has suggested that resource constraints actually have a positive effect on firm growth and performance under some circumstances (e.g., George, 2005; Katila & Shane, 2005; Mishina et al., 2004; Mosakowski, 2002; cf. also Baker & Nelson, 2005). Third, current empirical applications of RBV measured levels or amounts of particular resources available to a firm. They infer that these resources deliver firms competitive advantage by establishing a relationship between these resource levels and performance (e.g. via regression on profitability). However, there is the opportunity to directly measure the characteristics of resource configurations that deliver competitive advantage, such as Barney´s well known VRIO (Valuable, Rare, Inimitable and Organized) framework (Barney, 1997). Key Propositions and Methods: The aim of our study is to develop and test scales for measuring resource advantages (and disadvantages) and inimitability for entrepreneurial firms. The study proceeds in three stages. The first stage developed our initial scales based on earlier literature. Where possible, we adapt scales based on previous work. The first block of the scales related to the level of resource advantages and disadvantages. Respondents were asked the degree to which each resource category represented an advantage or disadvantage relative to other businesses in their industry on a 5 point response scale: Major Disadvantage, Slight Disadvantage, No Advantage or Disadvantage, Slight Advantage and Major Advantage. Items were developed as follows. Network capabilities (3 items) were adapted from (Madsen, Alsos, Borch, Ljunggren & Brastad, 2006). Knowledge resources marketing expertise / customer service (3 items) and technical expertise (3 items) were adapted from Wiklund and Shepard (2003). flexibility (2 items), costs (4 items) were adapted from JIBS B97. New scales were developed for industry knowledge / alertness (3 items) and product / service advantages. The second block asked the respondent to nominate the most important resource advantage (and disadvantage) of the firm. For the advantage, they were then asked four questions to determine how easy it would be for other firms to imitate and/or substitute this resource on a 5 point likert scale. For the disadvantage, they were asked corresponding questions related to overcoming this disadvantage. The second stage involved two pre-tests of the instrument to refine the scales. The first was an on-line convenience sample of 38 respondents. The second pre-test was a telephone interview with a random sample of 31 Nascent firms and 47 Young firms (< 3 years in operation) generated using a PSED method of randomly calling households (Gartner et al. 2004). Several items were dropped or reworded based on the pre-tests. The third stage (currently in progress) is part of Wave 1 of CAUSEE (Nascent Firms) and FEDP (Young Firms), a PSED type study being conducted in Australia. The scales will be tested and analysed with a random sample of approximately 700 Nascent and Young firms respectively. In addition, a judgement sample of approximately 100 high potential businesses in each category will be included. Findings and Implications: The paper will report the results of the main study (stage 3 – currently data collection is in progress) will allow comparison of the level of resource advantage / disadvantage across various sub-groups of the population. Of particular interest will be a comparison of the high potential firms with the random sample. Based on the smaller pre-tests (N=38 and N=78) the factor structure of the items confirmed the distinctiveness of the constructs. The reliabilities are within an acceptable range: Cronbach alpha ranged from 0.701 to 0.927. The study will provide an opportunity for researchers to better operationalize RBV theory in studies within the domain of entrepreneurship. This is a fundamental requirement for the ability to test hypotheses derived from RBV in systematic, large scale research studies.
Resumo:
This paper uses dynamic computer simulation techniques to apply a procedure using vibration-based methods for damage assessment in multiple-girder composite bridge. In addition to changes in natural frequencies, this multi-criteria procedure incorporates two methods, namely the modal flexibility and the modal strain energy method. Using the numerically simulated modal data obtained through finite element analysis software, algorithms based on modal flexibility and modal strain energy change before and after damage are obtained and used as the indices for the assessment of structural health state. The feasibility and capability of the approach is demonstrated through numerical studies of proposed structure with six damage scenarios. It is concluded that the modal strain energy method is competent for application on multiple-girder composite bridge, as evidenced through the example treated in this paper.
Resumo:
The ideas for this CRC research project are based directly on Sidwell, Kennedy and Chan (2002). That research examined a number of case studies to identify the characteristics of successful projects. The findings were used to construct a matrix of best practice project delivery strategies. The purpose of this literature review is to test the decision matrix against established theory and best practice in the subject of construction project management.
Resumo:
The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.
Resumo:
A plethora of methods for procuring building projects are available to meet the needs of clients. Deciding what method to use for a given project is a difficult and challenging task as a client’s objectives and priorities need to marry with the selected method so as to improve the likelihood of the project being procured successfully. The decision as to what procurement system to use should be made as early as possible and underpinned by the client’s business case for the project. The risks and how they can potentially affect the client’s business should also be considered. In this report, the need for client’s to develop a procurement strategy, which outlines the key means by which the objectives of the project are to be achieved is emphasised. Once a client has established a business case for a project, appointed a principal advisor, determined their requirements and brief, then consideration as to which procurement method to be adopted should be made. An understanding of the characteristics of various procurement options is required before a recommendation can be made to a client. Procurement systems can be categorised as traditional, design and construct, management and collaborative. The characteristics of these systems along with the procurement methods commonly used are described. The main advantages and disadvantages, and circumstances under which a system could be considered applicable for a given project are also identified.
Resumo:
This document provides an overview of the differences and similarities in the objectives and implementation frameworks of the training and employment policies applying to public construction projects in Western Australia and Queensland. The material in the document clearly demonstrates the extent to which approaches to the pursuit of training objectives in particular have been informed by the experiences of other jurisdictions. The two State governments now have very similar approaches to the promotion of training with the WA government basing a good part of its policy approach on the “Queensland model”. As the two States share many similar economic and other characteristics, and have very similar social and economic goals, this similarity is to be expected. The capacity to benefit from the experiences of other jurisdictions is to be welcomed. The similarity in policy approach also suggests a potential for ongoing collaborations between the State governments on research aimed at further improving training and employment outcomes via public construction projects.
Resumo:
Existing widely known environmental assessment models, primarily those for Life Cycle Assessment of manufactured products and buildings, were reviewed to grasp their characteristics, since the past several years have seen a significant increase in interest and research activity in the development of building environmental assessment methods. Each method or tool was assessed under the headings of description, data requirement, end-use, assessment criteria (scale of assessment and scoring/ weighting system)and present status
Resumo:
Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.
Resumo:
Searching academic databases for records on ‘business failure’, ‘business distress’ or ‘bankruptcy’ yields a large body of studies on qualitative, empirical, theoretical and simulation aspects. It is a central part of this research to distil from this large quantity of potentially relevant reports and methodologies those which can both flag and predict business failure in the construction industry. An additional search term, such as, ‘construction’, ‘construction industry’ or ‘contractor’ yields a much smaller number of hits, many of which emphasize the construction industry’s distinctive characteristics. We scientists need first to understand the subject of investigation and the environment in which it lives. To do so, an analysis of existing successful and failed approaches to particular research questions is helpful before embarking on new territory. This guides the structure of the following report for we first review papers that specifically report on aspects of business failure in the construction industry followed by, (a) an overview of promising candidates borrowed from other disciplines and industries, and (b) a possible novel approach. An Australian (Queensland) perspective on the topic will also drive this investigation as most of the published research has been applied to the US and UK construction industries.
Resumo:
Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.
Resumo:
Reliable budget/cost estimates for road maintenance and rehabilitation are subjected to uncertainties and variability in road asset condition and characteristics of road users. The CRC CI research project 2003-029-C ‘Maintenance Cost Prediction for Road’ developed a method for assessing variation and reliability in budget/cost estimates for road maintenance and rehabilitation. The method is based on probability-based reliable theory and statistical method. The next stage of the current project is to apply the developed method to predict maintenance/rehabilitation budgets/costs of large networks for strategic investment. The first task is to assess the variability of road data. This report presents initial results of the analysis in assessing the variability of road data. A case study of the analysis for dry non reactive soil is presented to demonstrate the concept in analysing the variability of road data for large road networks. In assessing the variability of road data, large road networks were categorised into categories with common characteristics according to soil and climatic conditions, pavement conditions, pavement types, surface types and annual average daily traffic. The probability distributions, statistical means, and standard deviation values of asset conditions and annual average daily traffic for each type were quantified. The probability distributions and the statistical information obtained in this analysis will be used to asset the variation and reliability in budget/cost estimates in later stage. Generally, we usually used mean values of asset data of each category as input values for investment analysis. The variability of asset data in each category is not taken into account. This analysis method demonstrated that it can be used for practical application taking into account the variability of road data in analysing large road networks for maintenance/rehabilitation investment analysis.
Resumo:
This paper describes the operation of a microgrid that contains a custom power park (CPP). The park may contain an unbalanced and/or nonlinear load and the microgrid may contain many dis-tributed generators (DGs). One of the DGs in the microgrid is used as a compensator to achieve load compensation. A new method is proposed for current reference generation for load compensation, which takes into account the real and reactive power to be supplied by the DG connected to the compensator. The real and reactive power from the DGs and the utility source is tightly regulated assuming that dedicated communication channels are available. Therefore this scheme is most suitable in cases where the loads in CPP and DGs are physically located close to each other. The proposal is validated through extensive simulation studies using EMTDC/PSCAD software package (version 4.2).
Resumo:
In this paper, a new power sharing control method for a microgrid with several distributed generation units is proposed. The presence of both inertial and noninertial sources with different power ratings, maximum power point tracking, and various types of loads pose a great challenge for the power sharing and system stability. The conventional droop control method is modified to achieve the desired power sharing ensuring system stability in a highly resistive network. A transformation matrix is formed to derive equivalent real and reactive power output of the converter and equivalent feedback gain matrix for the modified droop equation. The proposed control strategy, aimed for the prototype microgrid planned at Queensland University of Technology, is validated through extensive simulation results using PSCAD/EMTDC software.