839 resultados para in-house maintenance projects
Resumo:
Purpose - Despite many Maintenance Repair and Overhaul (MRO) organisations alluding their positive business performances to the adoption Lean initiatives, there is a paucity of direct literature that validates this assertion. Thus, the purpose of this paper is to study empirically via the use of an industry-wide survey to establish and extent of Lean adoption and to verify its suitability in mitigating prevalent MRO challenges. Design/methodology/approach - The empirical study contained in this paper is facilitated by an industry-wide survey to collect data from several firms across the MRO spectrum. The analysed responses from industry leaders, professionals and executives synthesised with existing literature was used in ascertaining the extent of Lean adoption within the operational framework of the industry. Findings - The empirical study helped in validating the suitability of Lean in MRO context. However, it was also observed that the focus of its application was skewed towards its production-orientated functions more than its service-orientated functions. Nonetheless, this paper presents results of the positive influence of Lean in MRO context. Research limitations/implications - This empirical study presented in this paper was carried out within a framework of key characteristics of operation. Although this approach is sufficient in assessing the industry's Lean status, further assessment can also be achieved within the context of relevant performance metrics which was not included in this paper. Practical implications - By exploring the industry's Lean status within the context of operational characteristics of operation, this study provides MRO practitioners with more awareness into some of the critical factors required for successful holistic Lean realisation. Social implications - The state-of-the-art of Lean within the aviation MRO context established through this research also contributes to the wider product-centric service environment by providing a platform that facilitates strategy development which ensures Lean success within this environment. Originality/value - Apart from validating the suitability of Lean in MRO contexts, by establishing the extent of Lean adoption within the context of the operational framework, this paper provides a clearer insight as to how successful Lean implementation can be achieved via a holistic implementation strategy balanced between the product-centric and service-centric aspects of the industry.
Resumo:
Thèse numérisée par la Direction des bibliothèques de l'Université de Montréal.
Resumo:
Thèse numérisée par la Direction des bibliothèques de l'Université de Montréal.
Resumo:
Waterways have many more ties with society than as a medium for the transportation of goods alone. Waterway systems offer society many kinds of socio-economic value. Waterway authorities responsible for management and (re)development need to optimize the public benefits for the investments made. However, due to the many trade-offs in the system these agencies have multiple options for achieving this goal. Because they can invest resources in a great many different ways, they need a way to calculate the efficiency of the decisions they make. Transaction cost theory, and the analysis that goes with it, has emerged as an important means of justifying efficiency decisions in the economic arena. To improve our understanding of the value-creating and coordination problems for waterway authorities, such a framework is applied to this sector. This paper describes the findings for two cases, which reflect two common multi trade-off situations for waterway (re)development. Our first case study focuses on the Miami River, an urban revitalized waterway. The second case describes the Inner Harbour Navigation Canal in New Orleans, a canal and lock in an industrialized zone, in need of an upgrade to keep pace with market developments. The transaction cost framework appears to be useful in exposing a wide variety of value-creating opportunities and the resistances that come with it. These insights can offer infrastructure managers guidance on how to seize these opportunities.
Resumo:
This article reports the initial findings from the evaluation of four creative arts projects involving groups of older people living in a rural community. The purpose of the projects was to reduce social isolation among participants through providing direct access to arts and social activities. The view was that these activities would improve life skills and independence, increase levels of activity and improve the health, wellbeing and quality of life of participants. Evaluation of these projects demonstrated increased levels of self-worth and self-esteem among participants, and many of the older people involved agreed that they had made new friends while having the opportunity to try out a new activity.
Resumo:
Starting in December 1982 the University of Nottingham decided to phototypeset almost all of its examination papers `in house' using the troff, tbl and eqn programs running under UNIX. This tutorial lecture highlights the features of the three programs with particular reference to their strengths and weaknesses in a production environment. The following issues are particularly addressed: Standards -- all three software packages require the embedding of commands and the invocation of pre-written macros, rather than `what you see is what you get'. This can help to enforce standards, in the absence of traditional compositor skills. Hardware and Software -- the requirements are analysed for an inexpensive preview facility and a low-level interface to the phototypesetter. Mathematical and Technical papers -- the fine-tuning of eqn to impose a standard house style. Staff skills and training -- systems of this kind do not require the operators to have had previous experience of phototypesetting. Of much greater importance is willingness and flexibility in learning how to use computer systems.
Resumo:
Privity of contract has lately been criticized in several European jurisdictions, particu-larly due to the onerous consequences it gives rise to in arrangements typical for the modern exchange such as chains of contracts. Privity of contract is a classical premise of contract law, which prohibits a third party to acquire or enforce rights under a contract to which he is not a party. Such a premise is usually seen to be manifested in the doctrine of privity of contract developed under common law, however, the jurisdictions of continental Europe do recognize a corresponding starting point in contract law. One of the traditional industry sectors affected by this premise is the construction industry. A typical large construction project includes a contractual chain comprised of an employer, a main contractor and a subcontractor. The employer is usually dependent on the subcontractor's performance, however, no contractual nexus exists between the two. Accordingly, the employer might want to circumvent the privity of contract in order to reach the subcontractor and to mitigate any risks imposed by such a chain of contracts. From this starting point, the study endeavors to examine the concept of privity of con-tract in European jurisdictions and particularly the methods used to circumvent the rule in the construction industry practice. For this purpose, the study employs both a com-parative and a legal dogmatic method. The principal aim is to discover general principles not just from a theoretical perspective, but from a practical angle as well. Consequently, a considerable amount of legal praxis as well as international industry forms have been used as references. The most important include inter alia the model forms produced by FIDIC as well as Olli Norros' doctoral thesis "Vastuu sopimusketjussa". According to the conclusions of this study, the four principal ways to circumvent privity of contract in European construction projects include liability in a chain of contracts, collateral contracts, assignment of rights as well as security instruments. The contempo-rary European jurisdictions recognize these concepts and the references suggest that they are an integral part of the current market practice. Despite the fact that such means of circumventing privity of contract raise a number of legal questions and affect the risk position of particularly a subcontractor considerably, it seems that the impairment of the premise of privity of contract is an increasing trend in the construction industry.
Resumo:
This study aimed to standardise an in-house real-time polymerase chain reaction (rtPCR) to allow quantification of hepatitis B virus (HBV) DNA in serum or plasma samples, and to compare this method with two commercial assays, the Cobas Amplicor HBV monitor and the Cobas AmpliPrep/Cobas TaqMan HBV test. Samples from 397 patients from the state of São Paulo were analysed by all three methods. Fifty-two samples were from patients who were human immunodeficiency virus and hepatitis C virus positive, but HBV negative. Genotypes were characterised, and the viral load was measure in each sample. The in-house rtPCR showed an excellent success rate compared with commercial tests; inter-assay and intra-assay coefficients correlated with commercial tests (r = 0.96 and r = 0.913, p < 0.001) and the in-house test showed no genotype-dependent differences in detection and quantification rates. The in-house assay tested in this study could be used for screening and quantifying HBV DNA in order to monitor patients during therapy.
Resumo:
Poster presented at the 17th Annual International Meeting of the Institute of Human Virology. Baltimore, 27-30 September 2015
Resumo:
Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.
Resumo:
Gaining economic benefits from substantially lower labor costs has been reported as a major reason for offshoring labor-intensive information systems services to low-wage countries. However, if wage differences are so high, why is there such a high level of variation in the economic success between offshored IS projects? This study argues that offshore outsourcing involves a number of extra costs for the ^his paper was recommended for acceptance by Associate Guest Editor Erran Carmel. client organization that account for the economic failure of offshore projects. The objective is to disaggregate these extra costs into their constituent parts and to explain why they differ between offshored software projects. The focus is on software development and maintenance projects that are offshored to Indian vendors. A theoretical framework is developed a priori based on transaction cost economics (TCE) and the knowledge-based view of the firm, comple mented by factors that acknowledge the specific offshore context The framework is empirically explored using a multiple case study design including six offshored software projects in a large German financial service institution. The results of our analysis indicate that the client incurs post contractual extra costs for four types of activities: (1) re quirements specification and design, (2) knowledge transfer, (3) control, and (4) coordination. In projects that require a high level of client-specific knowledge about idiosyncratic business processes and software systems, these extra costs were found to be substantially higher than in projects where more general knowledge was needed. Notably, these costs most often arose independently from the threat of oppor tunistic behavior, challenging the predominant TCE logic of market failure. Rather, the client extra costs were parti cularly high in client-specific projects because the effort for managing the consequences of the knowledge asymmetries between client and vendor was particularly high in these projects. Prior experiences of the vendor with related client projects were found to reduce the level of extra costs but could not fully offset the increase in extra costs in highly client-specific projects. Moreover, cultural and geographic distance between client and vendor as well as personnel turnover were found to increase client extra costs. Slight evidence was found, however, that the cost-increasing impact of these factors was also leveraged in projects with a high level of required client-specific knowledge (moderator effect).
Resumo:
The U.S. railroad companies spend billions of dollars every year on railroad track maintenance in order to ensure safety and operational efficiency of their railroad networks. Besides maintenance costs, other costs such as train accident costs, train and shipment delay costs and rolling stock maintenance costs are also closely related to track maintenance activities. Optimizing the track maintenance process on the extensive railroad networks is a very complex problem with major cost implications. Currently, the decision making process for track maintenance planning is largely manual and primarily relies on the knowledge and judgment of experts. There is considerable potential to improve the process by using operations research techniques to develop solutions to the optimization problems on track maintenance. In this dissertation study, we propose a range of mathematical models and solution algorithms for three network-level scheduling problems on track maintenance: track inspection scheduling problem (TISP), production team scheduling problem (PTSP) and job-to-project clustering problem (JTPCP). TISP involves a set of inspection teams which travel over the railroad network to identify track defects. It is a large-scale routing and scheduling problem where thousands of tasks are to be scheduled subject to many difficult side constraints such as periodicity constraints and discrete working time constraints. A vehicle routing problem formulation was proposed for TISP, and a customized heuristic algorithm was developed to solve the model. The algorithm iteratively applies a constructive heuristic and a local search algorithm in an incremental scheduling horizon framework. The proposed model and algorithm have been adopted by a Class I railroad in its decision making process. Real-world case studies show the proposed approach outperforms the manual approach in short-term scheduling and can be used to conduct long-term what-if analyses to yield managerial insights. PTSP schedules capital track maintenance projects, which are the largest track maintenance activities and account for the majority of railroad capital spending. A time-space network model was proposed to formulate PTSP. More than ten types of side constraints were considered in the model, including very complex constraints such as mutual exclusion constraints and consecution constraints. A multiple neighborhood search algorithm, including a decomposition and restriction search and a block-interchange search, was developed to solve the model. Various performance enhancement techniques, such as data reduction, augmented cost function and subproblem prioritization, were developed to improve the algorithm. The proposed approach has been adopted by a Class I railroad for two years. Our numerical results show the model solutions are able to satisfy all hard constraints and most soft constraints. Compared with the existing manual procedure, the proposed approach is able to bring significant cost savings and operational efficiency improvement. JTPCP is an intermediate problem between TISP and PTSP. It focuses on clustering thousands of capital track maintenance jobs (based on the defects identified in track inspection) into projects so that the projects can be scheduled in PTSP. A vehicle routing problem based model and a multiple-step heuristic algorithm were developed to solve this problem. Various side constraints such as mutual exclusion constraints and rounding constraints were considered. The proposed approach has been applied in practice and has shown good performance in both solution quality and efficiency.
Resumo:
In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.