The thesis develops an Organisational Culture (OC) based framework for potentially improving the current practice of the infrastructure project selection process (PSP) in Indonesia, particularly for regional road projects. This framework is developed to address the suggestion emanating from the research that there is a need for strengthening the relevant organisational culture dimensions and making changes to current organisational culture profiles to support the effectiveness of the decision-making process of the current PSP. The findings not only benefit existing knowledge but also provide practical contributions for those decision-makers within the Indonesian regional government that are involved in PSP, i.e. by raising the awareness of the influence and the role of organisational culture.
Resumo:
Earthwork planning has been considered in this article and a generic block partitioning and modelling approach has been devised to provide strategic plans of various levels of detail. Conceptually this approach is more accurate and comprehensive than others, for instance those that are section based. In response to environmental concerns the metric for decision making was fuel consumption and emissions. Haulage distance and gradient are also included as they are important components of these metrics. Advantageously the fuel consumption metric is generic and captures the physical difficulties of travelling over inclines of different gradients, that is consistent across all hauling vehicles. For validation, the proposed models and techniques have been applied to a real world road project. The numerical investigations have demonstrated that the models can be solved with relatively little CPU time. The proposed block models also result in solutions of superior quality, i.e. they have reduced fuel consumption and cost. Furthermore the plans differ considerably from those based solely upon a distance based metric thus demonstrating a need for industry to reflect upon their current practices.
Resumo:
Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.
Resumo:
Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.
Resumo:
Road construction, maintenance and operation are activities that impact the environment by way of energy use, resource consumption and emission. Components such as construction material, transportation, street lighting, rolling resistance, traffic congestion during works, albedo and end-of-life processing impact the environment at different phases of the life of a road. With a view to promote sustainable development, a few sustainability rating schemes, e.g. Infrastructure Sustainability and Invest (Australia), Envision and Greenroads (USA), and CEEQUAL (UK) have been developed, that can assess road projects. These schemes address environmental areas such as: energy and emission, land, water, materials, discharges into surroundings, waste and ecology as factors for sustainable development. This paper assesses different rating schemes based on a defined comprehensive life cycle assessment (LCA) system boundary for road projects to identify different environmental indicators that address sustainable road development and operation. The findings indicate that new indicators are required to address different environmental components during the operation phase of roads.
Resumo:
Portable water-filled barriers (PWFBs) are roadside appurtenances that are used to prevent errant vehicles from penetrating into temporary construction zones on roadways. A numerical model of the composite PWFB, consisting of a plastic shell, steel frame, water and foam was developed and validated against results from full scale experimental tests. This model can be extended to larger scale impact cases, specifically ones that include actual vehicle models. The cost-benefit of having a validated numerical model is significant and this allows the road barrier designer to conduct extensive tests via numerical simulations prior to standard impact tests Effects of foam cladding as additional energy absorption material in the PWFB was investigated. Different types of foam were treated and it was found that XPS foam was the most suitable foam type. Results from this study will aid PWFB designers in developing new generation of roadside structures which will provide enhanced road safety.
Resumo:
A procurement decision-making model is developed based on a novel integration of leading-edge microeconomic theory and empirically tested in major road and health projects. The model provides a more reliable approach to identifying projects suited to Public-Private-Partnerships (PPPs) and it is expected that the model will enable government to deliver improved value-for-money from their portfolio of PPP projects.
Resumo:
The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.
Resumo:
Based on Dunning's dominant international business theory and the unique characteristics of construction, a novel framework is developed and tested to explain multinational contracting into Australia. Beyond contributions to theory, Australian governments now have clear evidence upon which to develop more effective procurement reform towards increasing the attractiveness of public sector major infrastructure projects and competition in this sector.
Resumo:
Existing research and best practice were utilized to develop the Project Management, Stakeholder Engagement and Change Facilitation (PSC) approach to road safety infrastructure projects. Two case studies involving Queensland Transport and Main Roads demonstrated that use of the PSC has potential to create synergies for projects undertaken by multi-disciplinary road safety groups, and to complement Safe System projects and philosophy. The case studies were the North West Road Safety Alliance project, and the implementation of Road Safety Audit policy, and utilised a mix of qualitative and quantitative methods including interviews and surveys.
Resumo:
The type of contract model may have a significant influence on achieving project objectives, including environmental and climate change goals. This research investigates non-standard contract models impacting greenhouse gas emissions (GHG) in transport infrastructure construction in Australia. The research is based on the analysis of two case studies: an Early Contractor Involvement (ECI) contract and a Design and Construct (D&C) contract with GHG reduction requirements embedded in the contractor selection. Main findings support the use of ECIs for better integrating decisions made during the planning phase with the construction activities, and improve environmental outcomes while achieving financial and time savings. Key words: greenhouse gases reduction; road construction; contracting; ECI; D&C
Resumo:
While the philosophical motivation behind Civil Infrastructure Management Systems is to achieve optimal level of service at a minimum cost, the allocation of scarce resources among competing alternatives is still a matter of debate. It appears to be widely accepted that results from tradeoff analysis can be measured by the degree of accomplishment of the objectives. Road management systems not only deal with different asset types but also with conflicting objectives. This paper presents a case study of lifecycle optimization with tradeoff analysis for a road corridor in New Brunswick. Objectives of the study included condition of bridge and roads and road safety. A road safety index was created based on potential for improvement. Road condition was based on roughness, rutting and cracking. Initial results show lack of sustainability in bridge performance. Therefore, bridges where broken by components: deck, superstructure and substructure. Visual inspections, in addition to construction age of each bridge, were combined to generate a surrogate apparent age. Two life cycle analysis were conducted; one aimed to minimize overall cost while achieving sustainable results and another one purely for optimization. -used to identify required levels of budget. Such analyses were used to identify the minimum required budget and to demonstrate that with the same amount of money it was possible to achieve better levels of performance. Dominance and performance driven criteria were combined to identify and select an optimal result. It was found that achievement of optimally sustained results is conditioned by the availability of treatments for all asset classes at across their life spans. For the case study a disaggregated bridge condition index was introduced to the original algorithm to attempt to achieve sustainability in all bridges components, however lack of early stage treatments for substructures produce declining trends for such a component.
Resumo:
Formal incentives systems aim to encourage improved performance by offering a reward for the achievement of project-specific goals. Despite argued benefits of incentive systems on project delivery outcomes, there remains debate over how incentive systems can be designed to encourage the formation of strong project relationships within a complex social system such as an infrastructure project. This challenge is compounded by the increasing emphasis in construction management research on the important mediating influence of technical and organisational context on project performance. In light of this challenge, the research presented in this paper focuses on the design of incentive systems in four infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on a motivational theory frame, a cross case analysis is conducted to examine differences and similarities across social and cultural drivers impacting on the effectiveness of the incentive systems in light of infrastructure project context. Despite significant differences in case project characteristics, results indicate the projects’ experience similar social drivers impacting on incentive effectiveness. Significant value across the projects was placed on: varied performance goals and multiple opportunities to across the project team to pursue incentive rewards; fair risk allocation across contract parties; value-driven tender selection; improved design-build integration; and promotion of future work opportunities. However, differences across the contexts were identified. Results suggest future work opportunities were a more powerful social driver in upholding reputation and establishing strong project relationships in the Australian context. On the other hand, the relationship initiatives in the Dutch context seemed to be more broadly embraced resulting in a greater willingness to collaboratively manage project risk. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the social and cultural influences on incentive effectiveness across different geographical and contextual boundaries in future research.
Resumo:
This research provides additional knowledge on the benefits and costs to society, in particular of road transport procured through Public-Private Partnership (PPP) arrangements. Currently, the public sector comparator (PSC) and cost-benefit analysis (CBA) used to evaluate and measure the benefits and costs of PPP are limited in their capacity to predict and forecast long-term events. PPP is attractive to governments due to the non-upfront payment, perceived value for money, and risk allocation and transfer to the private investor. However, public sector remains the guarantor, and under-writer of the private investor's loan from financial institutions and other voluntary risks which are unlimited to future compensatory claims. The new knowledge from this research is the introduction of a framework capable of evaluating, and measuring the associated PPP benefits, as well as the costs, effects, and impacts to society which are protracted and sporadic by nature.