851 resultados para Distributed generation planning
Resumo:
Integration of small-scale electricity generators, known as Distributed Generation (DG), into the distribution networks has become increasingly popular at the present. This tendency together with the falling price of synchronous-type generator has potential to give the DG a better chance in participating in the voltage regulation process together with other devices already available in the system. The voltage control issue turns out to be a very challenging problem for the distribution engineers since existing control coordination schemes would need to be reconsidered to take into account the DG operation. In this paper, we propose a control coordination technique, which is able to utilize the ability of the DG as a voltage regulator, and at the same time minimizes interaction with other active devices, such as On-load Tap Changing Transformer (OLTC) and voltage regulator. The technique has been developed based on the concept of control zone, Line Drop Compensation (LDC), as well as the choice of controller's parameters. Simulations carried out on an Australian system show that the technique is suitable and flexible for any system with multiple regulating devices including DG.
Resumo:
Plug-in electric vehicles will soon be connected to residential distribution networks in high quantities and will add to already overburdened residential feeders. However, as battery technology improves, plug-in electric vehicles will also be able to support networks as small distributed generation units by transferring the energy stored in their battery into the grid. Even though the increase in the plug-in electric vehicle connection is gradual, their connection points and charging/discharging levels are random. Therefore, such single-phase bidirectional power flows can have an adverse effect on the voltage unbalance of a three-phase distribution network. In this article, a voltage unbalance sensitivity analysis based on charging/discharging levels and the connection point of plug-in electric vehicles in a residential low-voltage distribution network is presented. Due to the many uncertainties in plug-in electric vehicle ratings and connection points and the network load, a Monte Carlo-based stochastic analysis is developed to predict voltage unbalance in the network in the presence of plug-in electric vehicles. A failure index is introduced to demonstrate the probability of non-standard voltage unbalance in the network due to plug-in electric vehicles.
Resumo:
This paper addresses the voltage rise constraints that are initiated from increased renewable generation resources in low voltage distribution networks. In this paper, an approach which is able to mitigate these voltage rise constraints and allow for increased distributed generator penetration is presented. The proposed approach involves utilizing the distribution transformers static tap changer to reduce the distribution feeder voltage setpoint. The proposed approach is modeled on a generic low voltage distribution network using the PSS SINCAL© simulation software package and is also implemented in a real low voltage distribution network to verify its practicality. Results indicate that this approach can be implemented to mitigate the voltage rise constraint and increase small-scale embedded generator penetration in a high proportion of low voltage feeders while avoiding any substantial network costs.
Resumo:
This paper presents an efficient hybrid evolutionary optimization algorithm based on combining Ant Colony Optimization (ACO) and Simulated Annealing (SA), called ACO-SA, for distribution feeder reconfiguration (DFR) considering Distributed Generators (DGs). Due to private ownership of DGs, a cost based compensation method is used to encourage DGs in active and reactive power generation. The objective function is summation of electrical energy generated by DGs and substation bus (main bus) in the next day. The approach is tested on a real distribution feeder. The simulation results show that the proposed evolutionary optimization algorithm is robust and suitable for solving DFR problem.
Resumo:
This paper deals with an efficient hybrid evolutionary optimization algorithm in accordance with combining the ant colony optimization (ACO) and the simulated annealing (SA), so called ACO-SA. The distribution feeder reconfiguration (DFR) is known as one of the most important control schemes in the distribution networks, which can be affected by distributed generations (DGs) for the multi-objective DFR. In such a case, DGs is used to minimize the real power loss, the deviation of nodes voltage and the number of switching operations. The approach is carried out on a real distribution feeder, where the simulation results show that the proposed evolutionary optimization algorithm is robust and suitable for solving the DFR problem.
Resumo:
Rapidly increasing electricity demands and capacity shortage of transmission and distribution facilities are the main driving forces for the growth of Distributed Generation (DG) integration in power grids. One of the reasons for choosing a DG is its ability to support voltage in a distribution system. Selection of effective DG characteristics and DG parameters is a significant concern of distribution system planners to obtain maximum potential benefits from the DG unit. This paper addresses the issue of improving the network voltage profile in distribution systems by installing a DG of the most suitable size, at a suitable location. An analytical approach is developed based on algebraic equations for uniformly distributed loads to determine the optimal operation, size and location of the DG in order to achieve required levels of network voltage. The developed method is simple to use for conceptual design and analysis of distribution system expansion with a DG and suitable for a quick estimation of DG parameters (such as optimal operating angle, size and location of a DG system) in a radial network. A practical network is used to verify the proposed technique and test results are presented.
Resumo:
Capacitors are widely used for power-factor correction (PFC) in power systems. When a PFC capacitor is installed with a certain load in a microgrid, it may be in parallel with the filter capacitor of the inverter interfacing the utility grid and the local distributed-generation unit and, thus, change the effective filter capacitance. Another complication is the possibility of occurrence of resonance in the microgrid. This paper conducts an in-depth investigation of the effective shunt-filter-capacitance variation and resonance phenomena in a microgrid due to a connection of a PFC capacitor. To compensate the capacitance-parameter variation, an Hinfin controller is designed for the voltage-source- inverter voltage control. By properly choosing the weighting functions, the synthesized Hinfin controller would exhibit high gains at the vicinity of the line frequency, similar to traditional high- performance P+ resonant controller and, thus, would possess nearly zero steady-state error. However, with the robust Hinfin controller, it will be possible to explicitly specify the degree of robustness in face of parameter variations. Furthermore, a thorough investigation is carried out to study the performance of inner current-loop feedback variables under resonance conditions. It reveals that filter-inductor current feedback is more effective in damping the resonance. This resonance can be further attenuated by employing the dual-inverter microgrid conditioner and controlling the series inverter as a virtual resistor affecting only harmonic components without interference with the fundamental power flow. And finally, the study in this paper has been tested experimentally using an experimental microgrid prototype.
Resumo:
Integration of small-scale electricity generators, known as distributed generation (DG), into the distribution networks has become increasingly popular at the present. This tendency together with the falling price of the synchronous-type generator has potential to give DG a better chance at participating in the voltage regulation process together with other devices already available in the system. The voltage control issue turns out to be a very challenging problem for the distribution engineers since existing control coordination schemes would need to be reconsidered to take into account the DG operation. In this paper, we propose a control coordination technique, which is able to utilize the ability of DG as a voltage regulator and, at the same time, minimize interaction with other active devices, such as an on-load tap changing transformer and a voltage regulator. The technique has been developed based on the concept of control zone, line drop compensation, dead band, as well as the choice of controllers' parameters. Simulations carried out on an Australian system show that the technique is suitable and flexible for any system with multiple regulating devices including DG.
Resumo:
The increasing integration of Renewable Energy Resources (RER) and the role of Electric Energy Storage (EES) in distribution systems has created interest in using energy management strategies. EES has become a suitable resource to manage energy consumption and generation in smart grid. Optimize scheduling of EES can also maximize retailer’s profit by introducing energy time-shift opportunities. This paper proposes a new strategy for scheduling EES in order to reduce the impact of electricity market price and load uncertainty on retailers’ profit. The proposed strategy optimizes the cost of purchasing energy with the objective of minimizing surplus energy cost in hedging contract. A case study is provided to demonstrate the impact of the proposed strategy on retailers’ financial benefit.
Resumo:
The work is a report of research on using multiple inverters of Battery Energy Storage Systems with angle droop controllers to share real power in an isolated micro grid system consisting of inertia based Distributed Generation units and variable load. The proposed angle droop control method helps to balance the supply and demand in the micro grid autonomous mode through charging and discharging of the Battery Energy Storage Systems while ensuring that the state of charge of the storage devices is within safe operating conditions. The proposed method is also studied for its effectiveness for frequency control. The proposed control system is verified and its performance validated with simulation software MATLAB/SIMULINK.
Resumo:
Department of Forest Resource Management in the University of Helsinki has in years 2004?2007 carried out so-called SIMO -project to develop a new generation planning system for forest management. Project parties are organisations doing most of Finnish forest planning in government, industry and private owned forests. Aim of this study was to find out the needs and requirements for new forest planning system and to clarify how parties see targets and processes in today's forest planning. Representatives responsible for forest planning in each organisation were interviewed one by one. According to study the stand-based system for managing and treating forests continues in the future. Because of variable data acquisition methods with different accuracy and sources, and development of single tree interpretation, more and more forest data is collected without field work. The benefits of using more specific forest data also calls for use of information units smaller than tree stand. In Finland the traditional way to arrange forest planning computation is divided in two elements. After updating the forest data to present situation every stand unit's growth is simulated with different alternative treatment schedule. After simulation, optimisation selects for every stand one treatment schedule so that the management program satisfies the owner's goals in the best possible way. This arrangement will be maintained in the future system. The parties' requirements to add multi-criteria problem solving, group decision support methods as well as heuristic and spatial optimisation into system make the programming work more challenging. Generally the new system is expected to be adjustable and transparent. Strict documentation and free source code helps to bring these expectations into effect. Variable growing models and treatment schedules with different source information, accuracy, methods and the speed of processing are supposed to work easily in system. Also possibilities to calibrate models regionally and to set local parameters changing in time are required. In future the forest planning system will be integrated in comprehensive data management systems together with geographic, economic and work supervision information. This requires a modular method of implementing the system and the use of a simple data transmission interface between modules and together with other systems. No major differences in parties' view of the systems requirements were noticed in this study. Rather the interviews completed the full picture from slightly different angles. In organisation the forest management is considered quite inflexible and it only draws the strategic lines. It does not yet have a role in operative activity, although the need and benefits of team level forest planning are admitted. Demands and opportunities of variable forest data, new planning goals and development of information technology are known. Party organisations want to keep on track with development. One example is the engagement in extensive SIMO-project which connects the whole field of forest planning in Finland.
Resumo:
Grid connected PWM-VSIs are being increasingly used for applications such as Distributed Generation (DG), power quality, UPS etc. Appropriate control strategies for grid synchronisation and line current regulation are required to establish such a grid interconnection and power transfer. Control of three phase VSIs is widely reported in iterature. Conventionally, dq control in Synchronous Reference Frame(SRF) is employed for both PLL and line current control where PI-controllers are used to track the DC references. Single phase systems do not have defined direct (d) and quadrature (q) axis components that are required for SRF transformation. Thus, references are AC in nature and hence usage of PI controllers cannot yield zero steady state errors. Resonant controllers have the ability to track AC references accurately. In this work, a resonant controller based single phase PLL and current control technique are being employed for tracking grid frequency and the AC current reference respectively. A single phase full bridge converter is being operated as a STATCOM for performance evaluation of the control scheme.
Resumo:
This paper presents a new voltage stability index based on the tangent vector of the power flow jacobian. This index is capable of providing the relative vulnerability information of the system buses from the point of view of voltage collapse. In an effort to compare this index with a similar index, the popular voltage stability index L is studied and it is shown through system studies that the L index is not a very consistent indicator of the voltage collapse point of the system but is only a reasonable indicator of the vulnerability of the system buses to voltage collapse. We also show that the new index can be used in the voltage stability analysis of radial systems which is not possible with the L index. This is a significant result of this investigation since there is a lot of contemporary interest in distributed generation and microgrids which are by and large radial in nature. Simulation results considering several test systems are provided to validate the results and the computational needs of the proposed scheme is assessed in comparison with other schemes
Resumo:
A new generator topology for microhydel power plants, capable of unsupervised operation, is proposed. While conventional microhydel plants operate at constant speed with switched ballast loads, the proposed generator, based on the wound rotor induction machine, operates at variable speed and does away with the need for ballast loads. This increases reliability and substantially decreases system costs and setup times. The proposed generator has a simplified decoupled control structure with stator-referenced voltage control similar to a conventional synchronous generator, and rotor-side frequency control that is facilitated by rotating electronics mounted on the rotor. While this paper describes an isolated plant, the topology can also be tailored for distributed generation enabling conversion of the available hydraulic power into useful electrical power when the grid is present, and supplying local loads in the event of grid outage.
Resumo:
Nos últimos anos, o consumo de energia vem crescendo mundialmente nos grandes centros urbanos, e esforços na área de eficiência energética estão sendo implantados, a fim de reduzir o consumo no horário da ponta e interrupções da rede. O aproveitamento das fontes renováveis, como o fotovoltaico em uma edificação se torna um atrativo a mais para a matriz energética num momento em que o país prima pela universalização dos serviços de energia e a classificação de edifícios comerciais, de serviço e públicos, além dos residenciais quanto à eficiência energética através do Procel Edifica (RTQ-C e RTQ-R). Os sistemas fotovoltaicos podem configurar perfis de uso nas edificações de modo a gerar energia para consumo próprio ou ligado à rede e ainda ter influência na arquitetura do prédio com revestimento: os perfis podem está em telhados, fachadas ou janelas, amenizando em alguns casos a carga térmica no prédio com sombreamento arquitetônico. Hoje, com o avanço da tecnologia no setor de armazenagem é possível, o atendimento com segurança e eficiência a uma edificação ou direcionar esta armazenagem a uma demanda específica como o atendimento à demanda de ciclo profundo, tais como, iluminação externa e recarga de veículos elétricos. Partindo da premissa de sistemas interruptos de energia, UPS, uso de fonte secundária como FV, baterias e Flywheel é apresentado uma forma de melhor gerenciar a energia armazenada, podendo estender a vida útil da bateria e conseqüentemente de todo o sistema fotovoltaico na edificação. Esta forma de armazenar energia proporciona um serviço de uso contínuo sem percepção das interrupções da rede com garantia de 20 anos, tal qual o módulo fotovoltaico, com esta proposta as perdas de energia elétrica na edificação serão atenuadas, pois a eletricidade será utilizada de forma eficiente e inteligente. O ponto de partida do estudo de caso no prédio do IBAM são os sistemas fotovoltaicos com geração distribuída (mini-redes) conectados à rede que são instalados para fornecer energia ao consumidor, complementando a quantidade de energia demandada, caso haja algum aumento do consumo de energia na edificação, ou ainda utilizar o sistema fotovoltaico na hora da ponta e interrupções do sistema da rede no período fora da ponta. A estocagem inercial por meio do Flywheel tem um papel fundamental nesta mini-rede (Flywheel, bateria VRLA, UPS, inversor e STS), pois a sua utilização pode ser apontada como uma inovação tecnológica quanto à regulação de tensão no sistema de energia elétrica, além de preparar a edificação para o smart-grid. Esta configuração de acumulação de energia permitiu a analise do deslocamento desta energia armazenada para o consumo no horário de ponta, mudando o conceito de sistemas fotovoltaicos autônomos no meio urbano e rural no país. Este conceito de armazenagem se confirma então como um aporte na eficiência de energia na edificação, podendo carrear economia de energia substancial, além de proporcionar uma confiabilidade no serviço de energia, com um baixo retorno do investimento e com uma garantia de funcionamento com pequena ou nenhuma manutenção durante o período de vida de 20 anos.