824 resultados para Contract manufacturing
Resumo:
We study a general equilibrium model in which entrepreneurs finance investment with optimal financial contracts. Because of enforceability problems, contracts are constrained efficient. We show that limited enforceability amplifies the impact of technological innovations on aggregate output. More generally, we show that lower enforceability of contracts will be associated with greater aggregate volatility. A key assumption for this result is that defaulting entrepreneurs are not excluded from the market.
Resumo:
This paper characterizes the innovation strategy of manufacturing firms andexamines the relation between the innovation strategy and importantindustry-, firm- and innovation-specific characteristics using Belgiandata from the Eurostat Community Innovation Survey. In addition to importantsize effects explaining innovation, we find that high perceived risks andcosts and low appropriability of innovations do not discourage innovation,but rather determine how the innovation sourcing strategy is chosen. Withrespect to the determinants of the decision of the innovative firm toproduce technology itself (Make) or to source technology externally (Buy),we find that small firms are more likely restrict their innovation strategyto an exclusive make or buy strategy, while large firms are more likely tocombine both internal and external knowledge acquisition in their innovationstrategy. An interesting result that highlights the complementary nature ofthe Make and Buy decisions, is that, controlled for firm size, companies forwhich internal information is an important source for innovation are morelikely to combine internal and external sources of technology. We find thisto be evidence of the fact that in-house R&D generates the necessaryabsorptive capacity to profit from external knowledge acquisition. Also theeffectiveness of different mechanisms to appropriate the benefits ofinnovations and the internal organizational resistance against change areimportant determinants of the firm's technology sourcing strategy.
Resumo:
PRECON S.A is a manufacturing company dedicated to produce prefabricatedconcrete parts to several industries as rail transportation andagricultural industries.Recently, PRECON signed a contract with RENFE,the Spanish Nnational Rail Transportation Company to manufacturepre-stressed concrete sleepers for siding of the new railways of the highspeed train AVE. The scheduling problem associated with the manufacturingprocess of the sleepers is very complex since it involves severalconstraints and objectives. The constraints are related with productioncapacity, the quantity of available moulds, satisfying demand and otheroperational constraints. The two main objectives are related withmaximizing the usage of the manufacturing resources and minimizing themoulds movements. We developed a deterministic crowding genetic algorithmfor this multiobjective problem. The algorithm has proved to be a powerfuland flexible tool to solve the large-scale instance of this complex realscheduling problem.
Resumo:
No hace más de 3 años se podía leer en las revistas especializadas que España había pasado a ocupar el tercer puesto en el ranking mundial por potencia eólica instalada. La industria eólica española a su vez ha pasado a ocupar el tercer puesto en la fabricación e instalación de aerogeneradores, con una cuota de mercado del 13%, siendo así un sector con gran capacidad de exportación. Por otra parte, tras diez años de promulgación de la Ley 31/95, de 8 de noviembre, de Prevención de Riesgos Laborales, y después su desarrollo reglamentario, es un hecho incontestable que, pese a todo, y a los ingentes esfuerzos realizados por los distintos actores implicados en la prevención de riesgos laborales (Estado, Comunidades Autónomas, Agentes Sociales, Entidades especializadas, etcetera), existe un sector como el de la construcción que, constituyendo uno de los ejes del crecimiento económico de nuestro país, está sometido a unos riesgos especiales y continúa registrando una siniestralidad laboral muy notoria por sus cifras y gravedad. La legislación de prevención, los manuales sobre las distintas disciplinas preventivas, los libros especializados, los expertos... han abordado ya, con mayor o menor acierto, muchas de las cuestiones generales y específicas que afectan a la seguridad y salud: la evaluación de riesgos, las medidas higiénicas, los equipos de trabajo y equipos de protección individual, la planificación, la formación, los servicios de prevención , los sistemas de gestión de la prevención, las auditorías ... forman parte de los contenidos que se han ido creando en torno a este tema. No obstante, resulta de gran interés la elaboración de un estudio de Seguridad y Salud, en el que partiendo de un desarrollo técnico concreto, pero sobre todo integral, es decir, que comprenda todas las fases para el suministrp e instalación de aerogeneradores para un parque eólico, vayamos desgranando cada uno de los puntos desarrollados en su construcción. Entre las conclusiones más destacadas de este trabajo, se encuentra la definición de las condiciones relativas a la prevención de accidentes y enfermedades laborales durante la ejecución de los trabajos de suministro e instalación de un parque eólico y la gestión de su prevención, las características de las instalaciones preceptivas para higiene y bienestar de los trabajadores, así como directrices básicas mínimas, que deben reflejarse y desarrollarse en el Plan de Seguridad y Salud que las empresas contratistas deberán presentar para su aprobación por el director de obra, antes del comienzo de los trabajos, de forma que sea posible la disminución de accidentes laborales así como evitar las posibles sanciones administrativas y/o penales.
Resumo:
The objective of this analysis was to evaluate mortality among a cohort of 24,865 capacitor-manufacturing workers exposed to polychlorinated biphenyls (PCBs) at plants in Indiana, Massachusetts, and New York and followed for mortality through 2008. Cumulative PCB exposure was estimated using plant-specific job-exposure matrices. External comparisons to US and state-specific populations used standardized mortality ratios, adjusted for gender, race, age and calendar year. Among long-term workers employed 3 months or longer, within-cohort comparisons used standardized rate ratios and multivariable Poisson regression modeling. Through 2008, more than one million person-years at risk and 8749 deaths were accrued. Among long-term employees, all-cause and all-cancer mortality were not elevated; of the a priori outcomes assessed only melanoma mortality was elevated. Mortality was elevated for some outcomes of a priori interest among subgroups of long-term workers: all cancer, intestinal cancer and amyotrophic lateral sclerosis (women); melanoma (men); melanoma and brain and nervous system cancer (Indiana plant); and melanoma and multiple myeloma (New York plant). Standardized rates of stomach and uterine cancer and multiple myeloma mortality increased with estimated cumulative PCB exposure. Poisson regression modeling showed significant associations with estimated cumulative PCB exposure for prostate and stomach cancer mortality. For other outcomes of a priori interest--rectal, liver, ovarian, breast, and thyroid cancer, non-Hodgkin lymphoma, Alzheimer disease, and Parkinson disease--neither elevated mortality nor positive associations with PCB exposure were observed. Associations between estimated cumulative PCB exposure and stomach, uterine, and prostate cancer and myeloma mortality confirmed our previous positive findings.
Resumo:
This Agreement made and entered into this 1st day of July 2009, at Des Moines, Iowa, pursuant to the provisions of Chapter 20 of the Code of Iowa, by and between the State of Iowa (hereinafter referred to as the Employer) and the American Federation of State, County, and Municipal Employees, Iowa Public Employees Council 61, AFL-CIO (hereinafter referred to as the Union), and its appropriate affiliated locals, as representatives of employees employed by the State of Iowa
Resumo:
Twelve regularly scheduled lettings and two emergency/special lettings were held by the Iowa Department of Transportation for construction and maintenance work during the period covered by this report. At these lettings, projects totaling $625,486,614 were approved.
Resumo:
We present a theoretical framework for determining the short- and long-run effects of infrastructure. While the short-run effects have been the focus of most previous studies, here we derive long-run elasticities by taking into account the adjustment of quasi-fixed inputs to their optimum levels. By considering the impact of infrastructure on private investment decisions, we observe how, apart from the direct effect on costs in the short-run, infrastructure exerts an indirect source of influence in the long-run through their effect on private capital. The model is applied to manufacturing industries in the Spanish regions
Resumo:
Proposed Contract Letting Dates
Resumo:
We present a theoretical framework for determining the short- and long-run effects of infrastructure. While the short-run effects have been the focus of most previous studies, here we derive long-run elasticities by taking into account the adjustment of quasi-fixed inputs to their optimum levels. By considering the impact of infrastructure on private investment decisions, we observe how, apart from the direct effect on costs in the short-run, infrastructure exerts an indirect source of influence in the long-run through their effect on private capital. The model is applied to manufacturing industries in the Spanish regions
Resumo:
La complexitat dels mecanismes que determinen l'entrada i la sortida de signatures augmenta quan diferències geogràfiques de l'estructura de producció, la capital humana i l'atur són considerades. Variacions interregionals en la tarifa de les noves de signatures dintre de cada activitat industrial persisteixen durant els períodes llargs de temps, una circumstància que indica que hi ha determinants no-conjunturals en la capacitat de regions per a crear nous projectes industrials. Aquest estudi està preocupat amb l'establiment d'influència variables geogràfiques sobre la fundació de nous establiments de la fabricació. Les indústries (NEIX la R 25) en les regions espanyoles (el BOIG 2) han estat preses com les unitats d'anàlisis per al període 1980-1992
Resumo:
Pursuant to SF 2088, Section 64 - the Iowa Department of Transportation submits the Report for Contract Services and Training for Jan. 1, 2011 - June 30, 2011.
Resumo:
La complexitat dels mecanismes que determinen l'entrada i la sortida de signatures augmenta quan diferències geogràfiques de l'estructura de producció, la capital humana i l'atur són considerades. Variacions interregionals en la tarifa de les noves de signatures dintre de cada activitat industrial persisteixen durant els períodes llargs de temps, una circumstància que indica que hi ha determinants no-conjunturals en la capacitat de regions per a crear nous projectes industrials. Aquest estudi està preocupat amb l'establiment d'influència variables geogràfiques sobre la fundació de nous establiments de la fabricació. Les indústries (NEIX la R 25) en les regions espanyoles (el BOIG 2) han estat preses com les unitats d'anàlisis per al període 1980-1992
Resumo:
Production flow analysis (PFA) is a well-established methodology used for transforming traditional functional layout into product-oriented layout. The method uses part routings to find natural clusters of workstations forming production cells able to complete parts and components swiftly with simplified material flow. Once implemented, the scheduling system is based on period batch control aiming to establish fixed planning, production and delivery cycles for the whole production unit. PFA is traditionally applied to job-shops with functional layouts, and after reorganization within groups lead times reduce, quality improves and motivation among personnel improves. Several papers have documented this, yet no research has studied its application to service operations management. This paper aims to show that PFA can well be applied not only to job-shop and assembly operations, but also to back-office and service processes with real cases. The cases clearly show that PFA reduces non-value adding operations, introduces flow by evening out bottlenecks and diminishes process variability, all of which contribute to efficient operations management.