949 resultados para Construction Planning


Relevância:

30.00% 30.00%

Publicador:

Resumo:

[Quality Management in Construction Projects by Abdul Razzak Rumane, CRC Press, Boca Raton, FL, 2011, 434 pp, ISBN 9781439838716] Issues of quality management, quality control and performance against specification have long been the focus of various business sectors. Recently there has been an additional drive to achieve the continuous improvement and customer satisfaction promised by the 20th-century ‘gurus’ some six or seven decades ago. The engineering and construction industries have generally taken somewhat longer than their counterparts in the manufacturing, service and production sectors to achieve these espoused levels of quality. The construction and engineering sectors stand to realize major rewards from better managing quality in projects. More effort is being put into instructing future participants in the industry as well as assisting existing professionals. This book comes at an opportune time.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Safety culture is a concept that has long been accepted in high risk industries such as aviation, nuclear industries and mining, however, considerable research is now being undertaken within the construction sector, with varying levels of success. The current paper discusses three recent interlocked projects that have had some success in the Australian construction industry. The first project examined the development and implementation of a safety competency framework targeted at safety critical positions across first tier construction organisations. Combining qualitative and quantitative methods, the project: developed a matrix of safety critical positions (n=11) and safety managements tasks (SMTs; n=39); mapped the process steps for their acquisition and ongoing development; detailed the knowledge, skills and behaviours required for all SMTs; and outlined organisational cultural outcomes that could be anticipated in a successful implementation of the framework. The second project extended research on safety competency and leadership to develop behavioural guidelines for leaders to drive safety culture change down to second tier companies. This was designed to assist smaller construction companies to customise their own competency framework and develop implementation guidelines that match their aspirations and resources. The third interlocked project explored the use of safety effectiveness indicators (SEIs) as an industry-relevant assessment tool for reducing risk on construction sites. With direct linkages to safety competencies and safety management tasks, the SEIs are the next step towards an integrated safety cultural approach to safety and extend the concept of positive performance indicators (PPIs) by providing a valid, reliable, and user friendly measurement platform. Taken together, the results of the interlocked projects suggest that safety culture research has many potential benefits for the construction industry, particularly when research is conducted in partnership with industry stakeholders. Suggestions are made for future research, including further application and testing of the safety competency framework and aligning SEIs across construction projects of varying size, location and design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Client-side project manager face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation undera successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest the motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisation throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction and demolition (C&D) waste occupies the largest share of overall waste generation in many countries. However, waste management practices and outcomes may differ between countries. For instance, in Australia, C&D waste recovery is continuously improving during the last years but the amount of C&D waste increases every year, as there has been little improvement in waste avoidance and minimization. In contrast, in Germany, waste generation remains constant over many years despite the continuous economic growth. The waste recycling rate in Germany is one of the highest in the world. However, most waste recycled is from demolition work rather than from waste generated during new construction. In addition, specific laws need to be developed to further reduce landfill of non-recycled waste. Despite of the differences, C&D waste generation and recovery in both countries depend on the effectiveness of the statutory framework, which regulates their waste management practices. This is an issue in other parts of the world as well. Therefore countries can learn from each other to improve their current statutory framework for C&D waste management. By taking Germany and Australia as an example, possible measures to improve current practices of C&D waste management through better statutory tools are identified in this paper. After providing an overview of the statutory framework of both countries and their status in waste generation and recovery, a SWOT analysis is conducted to identify strengths, weaknesses, opportunities and threats of the statutory tools. Recommendations to improve the current statutory frameworks, in order to achieve less waste generation and more waste recovery in the construction industry are provided for the German and Australian government and they can also be transferred to other countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many construction industry decision-makers believe there is a lack of off-site manufacture (OSM) adoption for non-residential construction in Australia. Identification of construction business process was considered imperative in order to assist decision-makers to increase OSM utilisation. The premise that domain knowledge can be re-used to provide an intervention point in the construction process led a team of researchers to construct simple base-line process models for the complete construction process, segmented into six phases. Sixteen domain knowledge industry experts were asked to review the construction phase base-line models to answer the question “Where in the process illustrated by this base-line model phase is an OSM task?”. Through an iterative and generative process a number of off-site manufacture intervention points were identified and integrated into the process models. The re-use of industry expert domain knowledge provided suggestions for new ways to do basic tasks thus facilitating changes to current practice. It is expected that implementation of the new processes will lead to systemic industry change and thus a growth in productivity due to increased adoption of OSM.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: Tacit knowledge is perceived as the most strategically important resource of the construction organisation, and the only renewable and sustainable base for its activities and competitiveness. Knowledge management (KM) activities that deal with tacit knowledge are essential in helping an organisation to achieve its long-term organisational objectives. The purpose of this paper is to provide empirical evidence for the stronger strategic role of tacit KM in comparison to explicit KM. Design/methodology/approach: A questionnaire survey was administered in 2005 to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal business environment, intensity of KM activities as executed by targeted organisations, and contribution of these activities to business performance (BP). A total of 149 usable responses were received from 99 organisations representing about 38 per cent of the sampling frame. The statistical analyses helped to map the reported KM activities into two groups that, respectively, deal with tacit and explicit knowledge. The sensitivity to variations of organisational policies and strength of association with BP in relation to the two groups of KM activities were also compared empirically. A total of 15 interviews with the managerial and professional staff of leading contractors was undertaken to provide insightful narratives of KM implementations. Findings: The effective implementation of organisational policies, such as encouraging innovations and strengthening strategic guidance for KM, would facilitate human interactions of tacit KM. Higher intensity of activities in managing tacit knowledge would ultimately help the organisations to achieve economic gain in the long run. Originality/value: The stronger strategic role of tacit KM is empirically investigated and established within the context of construction organisations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A building information model (BIM) provides a rich representation of a building's design. However, there are many challenges in getting construction-specific information from a BIM, limiting the usability of BIM for construction and other downstream processes. This paper describes a novel approach that utilizes ontology-based feature modeling, automatic feature extraction based on ifcXML, and query processing to extract information relevant to construction practitioners from a given BIM. The feature ontology generically represents construction-specific information that is useful for a broad range of construction management functions. The software prototype uses the ontology to transform the designer-focused BIM into a construction-specific feature-based model (FBM). The formal query methods operate on the FBM to further help construction users to quickly extract the necessary information from a BIM. Our tests demonstrate that this approach provides a richer representation of construction-specific information compared to existing BIM tools.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The design and construction community has shown increasing interest in adopting building information models (BIMs). The richness of information provided by BIMs has the potential to streamline the design and construction processes by enabling enhanced communication, coordination, automation and analysis. However, there are many challenges in extracting construction-specific information out of BIMs. In most cases, construction practitioners have to manually identify the required information, which is inefficient and prone to error, particularly for complex, large-scale projects. This paper describes the process and methods we have formalized to partially automate the extraction and querying of construction-specific information from a BIM. We describe methods for analyzing a BIM to query for spatial information that is relevant for construction practitioners, and that is typically represented implicitly in a BIM. Our approach integrates ifcXML data and other spatial data to develop a richer model for construction users. We employ custom 2D topological XQuery predicates to answer a variety of spatial queries. The validation results demonstrate that this approach provides a richer representation of construction-specific information compared to existing BIM tools.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building information modeling (BIM) is an emerging technology and process that provides rich and intelligent design information models of a facility, enabling enhanced communication, coordination, analysis, and quality control throughout all phases of a building project. Although there are many documented benefits of BIM for construction, identifying essential construction-specific information out of a BIM in an efficient and meaningful way is still a challenging task. This paper presents a framework that combines feature-based modeling and query processing to leverage BIM for construction. The feature-based modeling representation implemented enriches a BIM by representing construction-specific design features relevant to different construction management (CM) functions. The query processing implemented allows for increased flexibility to specify queries and rapidly generate the desired view from a given BIM according to the varied requirements of a specific practitioner or domain. Central to the framework is the formalization of construction domain knowledge in the form of a feature ontology and query specifications. The implementation of our framework enables the automatic extraction and querying of a wide-range of design conditions that are relevant to construction practitioners. The validation studies conducted demonstrate that our approach is significantly more effective than existing solutions. The research described in this paper has the potential to improve the efficiency and effectiveness of decision-making processes in different CM functions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: Recent knowledge management (KM) literature suggests that KM activities are influenced by the elements of the internal business environment (BE) of organisations. This paper attempts to provide some unique insights into the contextual input of the KM process through empirically identifying the major factors (i.e. “forces”) within the internal BE of construction organisations operating in Hong Kong, and investigating their impact on the intensity of KM activities. Design/methodology/approach: A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal BE and intensity of KM activities as executed by targeted organisations. A total of 149 usable responses were received from 99 organisations representing about 38 percent of the research population. In parallel, to the survey, a total of 15 semi-structured interviews were undertaken to provide more insights into the phenomenon under investigation. Findings: Supported by the empirical and qualitative evidence, this study established that firstly, both organisational and technical environments have the capacity to either positively or negatively impact the intensity of KM activities, and both environments serve as stimuli in increasing each other's dynamism; secondly, certain types of KM activities are stronger “energy receivers” and easily to be “powered up” by manipulating factors representing these two environments. Then, through interactions between KM activities, the intensity of the whole strategic KM cycle will be increased thus helping to strengthen organisational competitive advantage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction practitioners often experience unexpected results of their scheduling-related decisions. This is mainly due to lack of understanding of the dynamic nature of construction system. However, very little attention has been given to its significant importance and few empirical studies have been undertaken on this issue. This paper, therefore, analyzes the effect of aggressive scheduling, overtime, resource adding, and schedule slippage on construction performance, focusing on workers’ reactions to those scheduling decisions. Survey data from 102 construction practitioners in 38 construction sites are used for the analysis. The results indicate that efforts to increase work rate by working overtime, resource adding, and aggressive scheduling can be offset due to losses in productivity and quality. Based on the research findings, practical guidelines are then discussed to help site managers to effectively deal with the dynamics of scheduling and improve construction performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Identifying the design features that impact construction is essential to developing cost effective and constructible designs. The similarity of building components is a critical design feature that affects method selection, productivity, and ultimately construction cost and schedule performance. However, there is limited understanding of what constitutes similarity in the design of building components and limited computer-based support to identify this feature in a building product model. This paper contributes a feature-based framework for representing and reasoning about component similarity that builds on ontological modelling, model-based reasoning and cluster analysis techniques. It describes the ontology we developed to characterize component similarity in terms of the component attributes, the direction, and the degree of variation. It also describes the generic reasoning process we formalized to identify component similarity in a standard product model based on practitioners' varied preferences. The generic reasoning process evaluates the geometric, topological, and symbolic similarities between components, creates groupings of similar components, and quantifies the degree of similarity. We implemented this reasoning process in a prototype cost estimating application, which creates and maintains cost estimates based on a building product model. Validation studies of the prototype system provide evidence that the framework is general and enables a more accurate and efficient cost estimating process.