916 resultados para Construction, Engineering, Ict, Management
Resumo:
Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.
Resumo:
The need to better understand and deal with workplace stress has major implications for the construction industry, especially on a project level, because of its potential to directly impact on site productivity and safety, and ultimately, the achievement of project objectives. While there has been some understanding of the effect of workplace stress within the construction industry, the majority of these studies have explored individual determinants of workplace stress among construction professionals such as architects, engineers, quantity surveyors etc. To date, very little research has focused on workplace stress as encountered by construction site operatives. This is an important research deficiency as construction site operatives typically make up a significant percentage of on-site workforce and contribute most directly to project success. To address this imbalance in research, this paper proposes a theoretical framework to better understand site operatives’ experience of stress from a cultural perspective on three levels: individual, project and organizational which has been largely neglected in previous studies.
Resumo:
Ecological sustainable development (ESD), defined as that which meets the needs of the present without compromising the ability of future generations to meet their own needs, has much to offer in enhancing the quality of life of people and maintaining the environment for future generations by reducing the pollution of water, air and land, minimizing the destruction of irreplaceable ecosystems and cutting down the amount of toxic materials released. However, there is still much to do to achieve full implementation world-wide. This paper reports on three factors-design, attitudes and financial constraints - that are likely barriers to the implementation of ESD within the built environment in Australian industry. A postal questionnaire survey is described aimed at soliciting views on detailed aspects of the factors. This shows that ESD in the Australian built environment has also not been successfully implemented. The main reason is found to be due to the perceived costs involved - the cost of using environmental materials being a predominant factor. The design of ESD, being more sophisticated, also is perceived as involving stakeholders in more expense. There also appears to be a lack of knowledge and a lack of specialised and interdisciplinary design teams available in the Australian context.
Resumo:
This paper presents the results of a pilot study examining the factors that impact most on the effective implementation of, and improvement to, Quality Mangement Sytems (QMSs) amongst Indonesian construction companies. Nine critical factors were identified from an extensive literature review, and a survey was conducted of 23 respondents from three specific groups (Quality Managers, Project Managers, and Site Engineers) undertaking work in the Indonesian infrastructure construction sector. The data has been analyzed initially using simple descriptive techniques. This study reveals that different groups within the sector have different opinions of the factors regardless of the degree of importance of each factor. However, the evaluation of construction project success and the incentive schemes for high performance staff, are the two factors that were considered very important by most of the respondents in all three groups. In terms of their assessment of tools for measuring contractor’s performance, additional QMS guidelines, techniques related to QMS practice provided by the Government, and benchmarking, a clear majority in each group regarded their usefulness as ‘of some importance’.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
Buildings and infrastructure represent principal assets of any national economy as well as prime sources of environmental degradation. Making them more sustainable represents a key challenge for the construction, planning and design industries and governments at all levels; and the rapid urbanisation of the 21st century has turned this into a global challenge. This book embodies the results of a major research programme by members of the Australia Co-operative Research Centre for Construction Innovation and its global partners, presented for an international audience of construction researchers, senior professionals and advanced students. It covers four themes, applied to regeneration as well as to new build, and within the overall theme of Innovation: Sustainable Materials and Manufactures, focusing on building material products, their manufacture and assembly – and the reduction of their ecological ‘fingerprints’, the extension of their service lives, and their re-use and recyclability. It also explores the prospects for applying the principles of the assembly line. Virtual Design, Construction and Management, viewed as increasing sustainable development through automation, enhanced collaboration (such as virtual design teams), real time BL performance assessment during design, simulation of the construction process, life-cycle management of project information (zero information loss) risk minimisation, and increased potential for innovation and value adding. Integrating Design, Construction and Facility Management over the Project Life Cycle, by converging ICT, design science engineering and sustainability science. Integration across spatial scales, enabling building–infrastructure synergies (such as water and energy efficiency). Convergences between IT and design and operational processes are also viewed as a key platform increased sustainability.
Resumo:
Partnering has drawn attention from both academics and practitioners in the construction industry in the context of construction and facilities management. The past decades have seen a number of articles reporting the application of partnering in construction. The Chinese construction industry is one of the largest industries in the world; however, to the authors’ best knowledge, no project in mainland China has adopted this procurement approach in a formal and systematic manner as yet. This study employed a qualitative approach to investigate the factors that support or impede the implementation of partnering in mainland China. The findings indicate that the partnering practice is feasible in the construction industry of China due to the large demand brought about by China’s strong economic growth and government support. However, the implementation of partnering in the Chinese construction industry is being impeded by the restrictions of the current Chinese regulatory framework and tender evaluation framework, the incompatible features of Chinese culture and the general lack of trust. Six strategies that help to facilitate the implementation of partnering in China have been developed. This study offers a useful reference to implement collaborative contracting models such as partnering in developing countries.
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.
Resumo:
Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.
Resumo:
This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.
Resumo:
Purpose – Recent knowledge management (KM) literature suggests that KM activities are not independent of each other, rather they interact with each other to form a process which receives input from both external and internal business environments, and then produces new knowledge for future utilisation. The purpose of this paper is to empirically investigate the relationships between KM activities within the construction business context in order to identify and map the pattern of their interactions. Design/methodology/approach – A questionnaire survey was administered to a sample of contracting organisations operating in Hong Kong to elicit opinions of construction professionals on the intensity of KM activities currently being executed by their organisations in order to facilitate knowledge capture, sharing and utilisation. More than 150 respondents from 99 organisations responded to the survey. Additionally, a total of 15 semi-structured interviews were undertaken to provide a unique perspective on many of the challenges facing local construction organisations when dealing with KM activities. Findings – Knowledge acquisition and utilisation play paramount roles in the development of the organisational knowledge asset. The higher the intensity of these two activities, the larger the organisational knowledge pool which, in turn, demands greater knowledge dissemination capacity. This dissemination capacity enables more active and intense responses to market changes and clients' needs, thus facilitating and stimulating acquisition and utilisation of new tacit knowledge, thus improving organisational business performance. Originality/value – Interactions between KM activities were empirically investigated, from a strategic perspective, in the construction business context.
Resumo:
Purpose – The purpose of this paper is to provide a new type of entry mode decision-making model for construction enterprises involved in international business. Design/methodology/approach – A hybrid method combining analytic hierarchy process (AHP) with preference ranking organization method for enrichment evaluations (PROMETHEE) is used to aid entry mode decisions. The AHP is used to decompose the entry mode problem into several dimensions and determine the weight of each criterion. In addition, PROMETHEE method is used to rank candidate entry modes and carry out sensitivity analyses. Findings – The proposed decision-making method is demonstrated to be a suitable approach to resolve the entry mode selection decision problem. Practical implications – The research provides practitioners with a more systematic decision framework and a more precise decision method. Originality/value – The paper sheds light on the further development of entry strategies for international construction markets. It not only introduces a new decision-making model for entry mode decision making, but also provides a conceptual framework with five determinants for a construction company entry mode selection based on the unique properties of the construction industry.
Resumo:
Morris' (1986) analysis of the factors affecting project success and failure is considered in relation to the psychology of judgement under uncertainty. A model is proposed whereby project managers may identify the specific circumstances in which human decision-making is prone to systematic error, and hence may apply a number of de-biasing techniques.
Resumo:
Project Management (PM) as an academic field is relatively new in Australian universities. Moreover, the field is distributed across four main areas: business (management), built environment and construction, engineering and more recently ICT (information systems). At an institutional level, with notable exceptions, there is little engagement between researchers working in those individual areas. Consequently, an initiative was launched in 2009 to create a network of PM researchers to build a disciplinary base for PM in Australia. The initiative took the form of a bi-annual forum. The first forum established the constituency and spread of PM research in Australia (Sense et al., 2011). This special issue of IJPM arose out of the second forum, held in 2012, that explored the notion of an Australian perspective on PM. At the forum, researchers were invited to collaborate to explore issues, methodological approaches, and theoretical positions underpinning their research and to answer the question: is there a distinctly Australian research agenda which responds to the current challenges of large and complex projects in our region? From a research point of view, it was abundantly clear at the forum that many of the issues facing Australian researchers are shared around the world. However, what emerged from the forum as the Australian perspective was a set of themes and research issues that dominate the Australia research agenda.