974 resultados para 680400 Construction Processes


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The modern citieshave been born of the processes of industrialization, urbanization, which have been characterized by violence, resulting in social inequality, spatial segregation, the struggle for survival, the authoritarianism of the government and the establishment of exclusive orders genre, which has  prevented the enjoyment of the rights differential. In order to understand these complexities and  transform power relations that develop and reproduce it, this article analyzes the main theoretical  contributions and methodological approaches that feminist and gender studies have been conducted on the city, urban space and the right to city, which are valuable contributions to the definition of  the right to the city of women as a collective right to universal construction

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As a result of a set of public policies and of the emergence of various social movements as of 1952 and especially in the years 1994 to 2006, Bolivia has known one of the most important processes of territorial restructuring and re organization of all its state structures. This article tackles the specific characteristics of the major transformations of the country in a period of more than 50 years; a period that led to the rise of what is now called the "Plurinational State of Bolivia". This is done by analyzing the most important effects of certain public policies implemented between 1950 and 2010.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The academic literature specialized on processes of conflict resolution has focused on how third party intervention and mediation can contribute to end violent conflict, however it has also ignored the potential role of the state in countries affected by internal war. This article calls for a better understanding of the state, not only as a source of contemporary conflict but as a potential advocate of conflict resolution processes. It suggests that it is necessary and possible to involve the state in more effective processes of conflict resolution through the implementation of a State Peace Policy. The central argument is that some of the critical elements that should guide the state action when confronting the destructive logic of war and violence can be effectively undertaken through a public policy focused on building peace. After suggesting a general definition of State Peace Policy and highlighting some of its main attributes, the article recognizes that this sort of policy can also orientate the unfinished process of state consolidation in Colombia and other countries affected by internal conflict. The role of the state in the process of conflict resolution is crucial; however there are some issues normally ignored within the policy-making process, they must be seriously taken into account in order to eliminate the underlying structures that perpetuate conflict and delay the consolidation of sustainable peace.-----La literatura académica especializada en procesos de resolución de conflictos se ha centrado en el estudio de cómo la intervención de terceras partes y la labor de mediación pueden contribuir a poner fin a los conflictos violentos, sin embargo, también ha ignorado el rol potencial del estado en aquellos países afectados por la guerra interna. Este artículo llama la atención sobre la necesidad de estudiar al estado no sólo como la fuente de los conflictos contemporáneos, sino como un colaborador potencial en procesos de resolución de conflictos. Se sugiere que es necesario y también posible involucrar al estado en este tipo de procesos de una manera más efectiva a través de la implementación de una Política de Estado centrada en la Paz. El argumento central es que algunos de los elementos claves que deben guiar la acción del estado cuando éste se enfrenta a la lógica destructiva de la guerra y la violencia, pueden ser efectivamente tratados a través de una política pública que de prioridad a la construcción de la paz. Luego de sugerir una definición general y destacar algunos de los principales atributos de ésta clase de Política de Estado, el artículo reconoce que ésta podría también orientar el proceso inacabado de consolidación del estado en Colombia y en otros países afectados por conflictos internos. El rol del estado en el proceso para resolver los conflictos es crucial, sin embargo hay algunos aspectos normalmente ignorados durante el proceso de formulación de políticas que deben ser tomados en cuenta seriamente para eliminar las estructuras que perpetúan el conflicto y que retrasan la consolidación de la paz sostenible.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

La idea que per entendre alguna cosa hem d'entendre el procés pel qual s'ha produït va ser assumida des de l'origen de l'estudi "La construcció de la identitat nacional com a procés de desenvolupament des de la infància a l'adolescència a Catalunya". Per tal d'estudiar el procés de desenvolupament relacionat amb la construcció de la identitat nacional, no és suficient considerar-lo en el seu context social, sinó que és necessari considerar la seva construcció social. Tres objectius principals van orientar el nostre estudi . Primer, indagar si els processos de categorització, identificació, coneixement, imatge, avaluació i afecte són també elements implicats en la construcció de la identitat nacional des de la infància a l'adolescència. Segon investigar el procés de desenvolupament d'aquests elements des dels 6 anys fins als 15 anys per contribuir amb dades a I'explicació sobre com es desenvolupa del coneixement social. Tres són les explicacions principals; la primera que es basa en processos cognitius d'inclusió-decentració; la segona, si aquest desenvolupament es dóna en cercles concèntrics des de I'interior (contextos quotidians) fins a l'exterior (amb intercanvis més amples i una educació formal envers la vida social); i la tercera, si el desenvolupament del coneixement social d'allò més immediat i directe es reorganitzat i adquireix nous significats per la integració dels elements més generals i abstractes. Tercer, donat el fet que el 50% de les famílies tenen el català com a llengua materna, hem estudiat la influència de la llengua o llengües utilitzades en el context familiar en el procés de construcció de la identitat nacional. Es va dissenyar una entrevista individual seguint una estructura amb les parts següents: identificació subjectiva i identificació nacional; coneixement dels països; estereotips, avaluació i sentiments, i entorn social. La mostra del present estudi va estar formada per 495 nens i adolescents de 6, 9, 12 i 15 anys d'edat. Es va utilitzar per cada grup un número similar de nens i nenes. La mostra es va dividir en tres grups segons la o les llengües utilitzades pel nen o nena en el seu context familiar. Tres van ser les categones lingüístiques utilitzades: castellà, nens que només utilitzin el castellà a casa; català, nens que només usen el català en el context familiar; i bilingües, nens que utilitzin tots dos idiomes a casa. Aquestes categories lingüístiques s'han utilitzat com a indicador dels contextos familiars. Dues conclusions principals es poden extreure d'aquest estudi. Primer, I'ús de categories nacionals no és una conseqüència del procés cognitiu d'inclusió-decentració ni en cercles concentrics (concret/abstracte). La idea d'un procés del món en paral·lel, d'un coneixement que integra simultàniament creences i sentiments de l'ambient concret o proper i de l'abstracte o llunyà pot explicar millor els nostres resultats. Els nens aprenen i pensen sobre la vida quotidara, les característiques de l'ambient, la informació circulant en el seu entom social i la importància o els diferents nivells de coneixement depenent del context. Els nens integren la informació que està circulant en el seu ambient i construeixen un món que necessàriament no ha de coincidir amb el món deis adults, però que els ajuda a comunicar-se i a entendre les situacions en les quals estan immersos. Els nens més joves són capaços d'utilitzar categories nacionals de manera similar als adolescents. Segon, la identitat nacional a Catalunya es construeix al voltant del nucli de la llengua parlada a casa. A través de tot I'estudi es pot veure un resultat consistent i reiterat. Els infants d'un entom familiar en què s'usa només el castellà s'identifiquen com a pertanyents a tots dos grups nacionals, Espanyol i Català. Els infants d'un entom familiar que utilitzen només el català s'identifiquen com a pertanyents només al grup Català. Aquestes identificacions guien com aquests nens avaluen i senten envers el propi grup nacional i els altres. A més, sembla que el context sòcio-polític és un vehicle important en la transmissió de les estructures de semblances i que I'estructura d'afecte es transmet principalment a través de I'entom familiar.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Standard form contracts are typically developed through a negotiated consensus, unless they are proffered by one specific interest group. Previously published plans of work and other descriptions of the processes in construction projects tend to focus on operational issues, or they tend to be prepared from the point of view of one or other of the dominant interest groups. Legal practice in the UK permits those who draft contracts to define their terms as they choose. There are no definitive rulings from the courts that give an indication as to the detailed responsibilities of project participants. The science of terminology offers useful guidance for discovering and describing terms and their meanings in their practical context, but has never been used for defining terms for responsibilities of participants in the construction project management process. Organizational analysis enables the management task to be deconstructed into its elemental parts in order that effective organizational structures can be developed. Organizational mapping offers a useful technique for reducing text-based descriptions of project management roles and responsibilities to a comparable basis. Research was carried out by means of a desk study, detailed analysis of nine plans of work and focus groups representing all aspects of the construction industry. No published plan of work offers definitive guidance. There is an enormous amount of variety in the way that terms are used for identifying responsibilities of project participants. A catalogue of concepts and terms (a “Terminology”) has been compiled and indexed to enable those who draft contracts to choose the most appropriate titles for project participants. The purpose of this terminology is to enable the selection and justification of appropriate terms in order to help define roles. The terminology brings an unprecedented clarity to the description of roles and responsibilities in construction projects and, as such, will be helpful for anyone seeking to assemble a team and specify roles for project participants.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction materials and equipment are essential building blocks of every construction project and may account for 50-60 per cent of the total cost of construction. The rate of their utilization, on the other hand, is the element that most directly relates to a project progress. A growing concern in the industry that inadequate efficiency hinders its success could thus be accommodated by turning construction into a logistic process. Although mostly limited, recent attempts and studies show that Radio Frequency IDentification (RFID) applications have significant potentials in construction. However, the aim of this research is to show that the technology itself should not only be used for automation and tracking to overcome the supply chain complexity but also as a tool to generate, record and exchange process-related knowledge among the supply chain stakeholders. This would enable all involved parties to identify and understand consequences of any forthcoming difficulties and react accordingly before they cause major disruptions in the construction process. In order to achieve this aim the study focuses on a number of methods. First of all it develops a generic understanding of how RFID technology has been used in logistic processes in industrial supply chain management. Secondly, it investigates recent applications of RFID as an information and communication technology support facility in construction logistics for the management of construction supply chain. Based on these the study develops an improved concept of a construction logistics architecture that explicitly relies on integrating RFID with the Global Positioning System (GPS). The developed conceptual model architecture shows that categorisation provided through RFID and traceability as a result of RFID/GPS integration could be used as a tool to identify, record and share potential problems and thus vastly improve knowledge management processes within the entire supply chain. The findings thus clearly show a need for future research in this area.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper aims to introduce a knowledge-based managemental prototype entitled Eþ for environmental-conscious construction relied on an integration of current environmental management tools in construction area. The overall objective of developing the Eþ prototype is to facilitate selectively reusing the retrievable knowledge in construction engineering and management areas assembled from previous projects for the best practice in environmental-conscious construction. The methodologies adopted in previous and ongoing research related to the development of the Eþ belong to the operations research area and the information technology area, including literature review, questionnaire survey and interview, statistical analysis, system analysis and development, experimental research and simulation, and so on. The content presented in this paper includes an advanced Eþ prototype, a comprehensive review of environmental management tools integrated to the Eþ prototype, and an experimental case study of the implementation of the Eþ prototype. It is expected that the adoption and implementation of the Eþ prototype can effectively facilitate contractors to improve their environmental performance in the lifecycle of projectbased construction and to reduce adverse environmental impacts due to the deployment of various engineering and management processes at each construction stage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Research is described that sought to understand how senior managers within regional contracting firms conceptualize and enact competitiveness. Existing formal discourses of construction competitiveness include the discourse of 'best practice' and the various theories of competitiveness as routinely mobilized within the academic literature. Such discourses consistently underplay the influence of contextual factors in shaping how competitiveness is enacted. An alternative discourse of competitiveness is outlined based on the concepts of localized learning and embeddedness. Two case studies of regional construction firms provide new insights into the emergent discourses of construction competitiveness. The empirical findings resonate strongly with the concepts of localized learning and embeddedness. The case studies illustrate the importance of de-centralized structures which enable multiple business units to become embedded within localized markets. A significant degree of autonomy is essential to facilitate localized entrepreneurial behaviour. In essence, sustained competitiveness was found to depend upon the extent to which de-centralized business units enact ongoing processes of localized learning. Once local business units have become embedded within localized markets the essential challenge is how to encourage continued entrepreneurial behaviour while maintaining a degree of centralized control and coordination. Of key importance is the recognition that the capabilities that make companies competitive transcend organizational boundaries such that they become situated within complex networks of relational ties.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A review of current risk pricing practices in the financial, insurance and construction sectors is conducted through a comprehensive literature review. The purpose was to inform a study on risk and price in the tendering processes of contractors: specifically, how contractors take account of risk when they are calculating their bids for construction work. The reference to mainstream literature was in view of construction management research as a field of application rather than a fundamental academic discipline. Analytical models are used for risk pricing in the financial sector. Certain mathematical laws and principles of insurance are used to price risk in the insurance sector. construction contractors and practitioners are described to traditionally price allowances for project risk using mechanisms such as intuition and experience. Project risk analysis models have proliferated in recent years. However, they are rarely used because of problems practitioners face when confronted with them. A discussion of practices across the three sectors shows that the construction industry does not approach risk according to the sophisticated mechanisms of the two other sectors. This is not a poor situation in itself. However, knowledge transfer from finance and insurance can help construction practitioners. But also, formal risk models for contractors should be informed by the commercial exigencies and unique characteristics of the construction sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Increasingly, the UK’s Private Finance Initiative has created a demand for construction companies to transfer knowledge from one organization or project to another. Knowledge transfer processes in such contexts face many challenges, due to the many resulting discontinuities in the involvement of organisations, personnel and information flow. This paper empirically identifies the barriers and enablers that hinder or enhance the transfer of knowledge in PFI contexts, drawing upon a questionnaire survey of construction firms. The main findings show that knowledge transfer processes in PFIs are hindered by time constraints, lack of trust, and policies, procedures, rules and regulations attached to the projects. Nevertheless, the processes of knowledge transfer are enhanced by emphasising the value and importance of a supportive leadership, participation/commitment from the relevant parties, and good communication between the relevant parties. The findings have considerable relevance to understanding the mechanism of knowledge transfer between organizations, projects and individuals within the PFI contexts in overcoming the barriers and enhancing the enablers. Furthermore, practitioners and managers can use the findings to efficiently design knowledge transfer frameworks that can be used to overcome the barriers encountered while enhancing the enablers to improve knowledge transfer processes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The thoughtful construction of molecular switches has led to a gamut of supramolecular systems that can be used in molecular electronics. These include molecules based on thienylethenes, spiropyrans, fulgides, dithienylphenanthrolines, and diazafluorenes. This article reviews the recent developments made in the synthesis and characterization of all these systems, thereby allowing a comparative study to validate the viability of these switchable molecules on a nanoscale. Also, the drawbacks of each class are demonstrated and, at the same time, the remedies for further improvisation are prescribed. We have made an honest attempt to present at? exhaustive account of all the different photochromic switches developed by us hitherto.