Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The market of building retrofits is increasingly more intensified as existing buildings are aging. The building retrofit projects involve existing buildings which impose constraints on stakeholders throughout the project process. They are also risky, complex, less predictable and difficult to be well planned with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors, but they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. This paper first discusses the requirements of waste management in building retrofit projects considering specific project characteristics and work natures, and highlights the importance of involving SMEs in waste planning and management through an appropriate way. By utilizing semi-structured interviews, this research develops a process model for SMEs to be applied in waste management. A collaboration scenario is also developed for collaborative waste planning and management by SMEs as subcontractors and large companies as main contractors. Findings from the paper will promote coordination of project delivery and waste management in building retrofit projects, and improve the involvement and performance of SMEs in dealing with waste problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The drive to reduce carbon emissions from domestic housing has led to a recent shift of focus from new-­‐build to retrofit. However there are two significant differences. Firstly more work is needed to retrofit existing housing to the same energy efficiency standards as new-­‐build. Secondly the remaining length of service life is potentially shorter. This implies that the capital expenditure – both financial and carbon -­‐ of retrofit may be disproportionate to the savings gained over the remaining life. However the Government’s definition of low and zero carbon continues to exclude the capital (embodied) carbon costs of construction, which has resulted in a lack of data for comparison. The paper addresses this gap by reporting the embodied carbon costs of retrofitting four individual pilot properties in Rampton Drift, part of an Eco-­‐Town Demonstrator Project in Cambridgeshire. Through collecting details of the materials used and their journeys from manufacturer to site, the paper conducts a ‘cradle-­‐to-­‐gate’ life cycle carbon assessment for each property. The embodied carbon figures are calculated using a software tool being developed by the Centre for Sustainable Development at the University of Cambridge. The key aims are to assess the real embodied carbon costs of retrofit of domestic properties, and to test the new tool; it is hoped that the methodology, the tool and the specific findings will be transferable to other projects. Initial changes in operational energy as a result of the retrofit works will be reported and compared with the embodied carbon costs when presenting this paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper is part of a larger PhD research project examining the apparent conflict in UK planning between energy efficiency and conservation for the retrofit of the thermal envelope of the existing building stock. Review of the literature shows that the UK will not meet its 2050 emission reduction target without substantial improvement to the energy performance of the thermal envelope of the existing building stock and that significantly, 40% of the existing stock has heritage status and may be exempted from Building Regulations. A review of UK policy and legislation shows that there are clear national priorities towards reducing emissions and addressing climate change, yet also shows a movement towards local decision making and control. This paper compares the current status of thirteen London Boroughs in respect to their position on thermal envelope retrofit for heritage and traditionally constructed buildings. Data collection is through ongoing surveys and interviews that compare statistical data, planning policies, sustainability and environmental priorities, and Officer decision-making. This paper finds that there is a lack of consistency in application of planning policy across Boroughs and suggests that this is a barrier to the up-take of energy efficient retrofit. Various recommendations are suggested at both national and local level which could help UK planning and planning officers deliver more energy efficient heritage retrofits.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Green roofs are one solution to stormwater runoff which is a major environmental problem. However, the majority of green roofs are primarily implemented on flat roofed commercial buildings and not residential homes with sloped roofs. Team SO GREEN designed a light-weight green roof system retrofit for residential homes. Between June and November 2014, green roof performance data was collected and compared between the designed sloped roofs and a non-sloped control. The sloped design performed well and one test slope was improved with a recirculating irrigation system. An economic analysis was made and a focus group determined preliminary consumer interest, aesthetic preferences, and barriers. This study enriches the body of knowledge regarding bringing green roof systems to the residential home market.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports the findings of research on the environmental performance of two case-study houses, a retrofit and new build. The retrofit was completed to a Passivhaus standard while the new build was completed to current Irish building regulations. Environmental performance of the retrofit and new build was measured using life-cycle assessments, examining the assembly, operational and end-of-life stage over life spans of 50 and 80 years. Using primary information, life-cycle assessment software and life-cycle assessment databases the environmental impacts of each stage were modelled. The operational stage of both case studies was found to be the source of the most significant environmental damage, followed by the assembly and the end-of-life stage respectively. The relative importance of the assembly and end-of-life stage decreased as the life span increased. It was found that the retrofit house studied outperformed the new build in the assembly and operational stage, whereas the new build performed better in the end-of-life stage; however, this is highly sensitive, depending on the standards to which both are completed. Operational energy savings pre- and post-retrofit were significant, indicating the future potential for adoption of high-quality retrofitting practices.