923 resultados para personnel and shift scheduling


Relevância:

100.00% 100.00%

Publicador:

Resumo:

An extensive literature exists on the problems of daily (shift) and weekly (tour) labor scheduling. In representing requirements for employees in these problems, researchers have used formulations based either on the model of Dantzig (1954) or on the model of Keith (1979). We show that both formulations have weakness in environments where management knows, or can attempt to identify, how different levels of customer service affect profits. These weaknesses results in lower-than-necessary profits. This paper presents a New Formulation of the daily and weekly Labor Scheduling Problems (NFLSP) designed to overcome the limitations of earlier models. NFLSP incorporates information on how changing the number of employees working in each planning period affects profits. NFLP uses this information during the development of the schedule to identify the number of employees who, ideally, should be working in each period. In an extensive simulation of 1,152 service environments, NFLSP outperformed the formulations of Dantzig (1954) and Keith (1979) at a level of significance of 0.001. Assuming year-round operations and an hourly wage, including benefits, of $6.00, NFLSP's schedules were $96,046 (2.2%) and $24,648 (0.6%) more profitable, on average, than schedules developed using the formulations of Danzig (1954) and Keith (1979), respectively. Although the average percentage gain over Keith's model was fairly small, it could be much larger in some real cases with different parameters. In 73 and 100 percent of the cases we simulated NFLSP yielded a higher profit than the models of Keith (1979) and Danzig (1954), respectively.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVE: Contribution to the discussion of the role of participation/consent of employees in working hours regulation. METHODS: Exploratory analysis of conflicts between preferences of employees and ergonomic recommendations in shift scheduling by analysing a large number of participative shift scheduling projects. RESULTS: The analysis showed that very often the pursuit of higher income played the major role in the decision making process of employees and employees preferred working hours in conflict with health and safety principles. CONCLUSIONS: First, the consent of employees or the works council alone does not ensure ergonomically sound schedules. Besides consent, risk assessment procedures seem to be a promising but difficult approach. Secondly, more research is necessary to check the applicability of recommendations under various settings, to support the risk assessment processes and to improve regulatory approaches to working hours.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Introduction: Work organization patterns and working conditions experienced by nursing personnel in the hospital settings may be associated to increased morbidity among these health workers. Aim: To estimate the prevalence and factors associated with self-reported diseases among nursing personnel at the emergency hospital in Rio Branco/ State of Acre, Brazil. Methods: A cross-sectional study was conducted involving 272 participants who answered a questionnaire including sociodemographic characteristics, working conditions, lifestyles, work ability, and a fatigue perception scale. The self-reported diseases in the 12 months prior to data collection were considered the dependent variable. Results: A total of 85.7% of the participants reported one or more diseases in the past 12 months. Most prevalent diseases were: musculoskeletal diseases (37.1%), digestive diseases (28.7%), mental disorders (28.3%), work injuries (27.9%), and respiratory diseases (26.8%). The following significant variables remained in the final model: high work demands (OR 2.69), reported fatigue (OR 3.59), night work (OR 6.55) and being a technician or nursing assistant (OR 4.23). Conclusions: Variables related to working conditions and work organization were associated with the occurrence of reported diseases among nursing professionals. Health promotion measures at work require a comprehensive approach including the working conditions and the work organization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper compares two linear programming (LP) models for shift scheduling in services where homogeneously-skilled employees are available at limited times. Although both models are based on set covering approaches, one explicitly matches employees to shifts, while the other imposes this matching implicitly. Each model is used in three forms—one with complete, another with very limited meal break placement flexibility, and a third without meal breaks—to provide initial schedules to a completion/improvement heuristic. The term completion/improvement heuristic is used to describe a construction/ improvement heuristic operating on a starting schedule. On 80 test problems varying widely in scheduling flexibility, employee staffing requirements, and employee availability characteristics, all six LP-based procedures generated lower cost schedules than a comparison from-scratch construction/improvement heuristic. This heuristic, which perpetually maintains an explicit matching of employees to shifts, consists of three phases which add, drop, and modify shifts. In terms of schedule cost, schedule generation time, and model size, the procedures based on the implicit model performed better, as a group, than those based on the explicit model. The LP model with complete break placement flexibility and implicitly matching employees to shifts generated schedules costing 6.7% less than those developed by the from-scratch heuristic.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents an integer programming model for developing optimal shift schedules while allowing extensive flexibility in terms of alternate shift starting times, shift lengths, and break placement. The model combines the work of Moondra (1976) and Bechtold and Jacobs (1990) by implicitly matching meal breaks to implicitly represented shifts. Moreover, the new model extends the work of these authors to enable the scheduling of overtime and the scheduling of rest breaks. We compare the new model to Bechtold and Jacobs' model over a diverse set of 588 test problems. The new model generates optimal solutions more rapidly, solves problems with more shift alternatives, and does not generate schedules violating the operative restrictions on break timing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper addresses the single machine scheduling problem with a common due date aiming to minimize earliness and tardiness penalties. Due to its complexity, most of the previous studies in the literature deal with this problem using heuristics and metaheuristics approaches. With the intention of contributing to the study of this problem, a branch-and-bound algorithm is proposed. Lower bounds and pruning rules that exploit properties of the problem are introduced. The proposed approach is examined through a computational comparative study with 280 problems involving different due date scenarios. In addition, the values of optimal solutions for small problems from a known benchmark are provided.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We consider the problem of scheduling a multi-mode real-time system upon identical multiprocessor platforms. Since it is a multi-mode system, the system can change from one mode to another such that the current task set is replaced with a new task set. Ensuring that deadlines are met requires not only that a schedulability test is performed on tasks in each mode but also that (i) a protocol for transitioning from one mode to another is specified and (ii) a schedulability test for each transition is performed. We propose two protocols which ensure that all the expected requirements are met during every transition between every pair of operating modes of the system. Moreover, we prove the correctness of our proposed algorithms by extending the theory about the makespan determination problem.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Demand response programs and models have been developed and implemented for an improved performance of electricity markets, taking full advantage of smart grids. Studying and addressing the consumers’ flexibility and network operation scenarios makes possible to design improved demand response models and programs. The methodology proposed in the present paper aims to address the definition of demand response programs that consider the demand shifting between periods, regarding the occurrence of multi-period demand response events. The optimization model focuses on minimizing the network and resources operation costs for a Virtual Power Player. Quantum Particle Swarm Optimization has been used in order to obtain the solutions for the optimization model that is applied to a large set of operation scenarios. The implemented case study illustrates the use of the proposed methodology to support the decisions of the Virtual Power Player in what concerns the duration of each demand response event.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quadrature oscillators are key elements in modern radio frequency (RF) transceivers and very useful nowadays in wireless communications, since they can provide: low quadrature error, low phase-noise, and wide tuning range (useful to cover several bands). RC oscillators can be fully integrated without the need of external components (external high Q-inductors), optimizing area, cost, and power consumption. The conventional structure of ring oscillator offers poor frequency stability and phasenoise, low quality factor (Q), and besides being vulnerable to process, voltage and temperature (PVT) variations, its performance degrades as the frequency of operation increases. This thesis is devoted to quadrature oscillators and presents a detailed comparative study of ring oscillator and shift register (SR) approaches. It is shown that in SRs both phase-noise and phase error are reduced, while ring oscillators have the advantage of occupying less area and less consumption due to the reduced number of components in the circuit. Thus, although ring oscillators are more suitable for biomedical applications, SRs are more appropriate for wireless applications, especially when specification requirements are more stringent and demanding. The first architecture studied consists in a simple CMOS ring oscillator employing an odd number of static single-ended inverters as delay cells. Subsequently, the quadrature 4-stage ring oscillator concept is shown and post-layout simulations are presented. The 3 and 4-phase single-frequency local oscillator (LO) generators employing SRs are presented, the latter with 50% and 25% duty-cycles. The circuits operate at 600 MHz and 900 MHz, and were designed in a 130 nm standard CMOS technology with a voltage supply of 1.2 V.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In ants, energy for flying is derived from carbohydrates (glycogen and free sugars). The amount of these substrates was compared in sexuals participating or not participating in mating flights. Results show that in participating females (Lasius niger, L. flavus, Myrmica scabrinodis, Formica rufa, F. polyctena, F. lugubris), the amount of carbohydrates, especially glycogen, was higher than in non-participating females (Cataglyphis cursor, Iridomyrmex humilis). Similarly, male C. cursor and I. humilis which fly, exhibit a much higher carbohydrate content than do the non-flying females of these species. Furthermore, the quantity of carbohydrates stored was generally higher in males than in females for each species. These results are discussed with regard to the loss of the nuptial flight by some species of ants.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this thesis is to research Manufacturing Planning and Control (MPC) system and Master Scheduling (MS) in a manufacturing firm. The study is conducted at Ensto Finland Corporation, which operates on a field of electrical systems and supplies. The paper consists of theoretical and empirical parts. The empirical part is based on weekly operating at Ensto and includes inter-firm material analysis, learning and meetings. Master Scheduling is an important module of an MPC system, since it is beneficial on transforming strategic production plans based on demand forecasting into operational schedules. Furthermore, capacity planning tools can remarkably contribute to production planning: by Rough-Cut Capacity Planning (RCCP) tool, a MS plan can be critically analyzed in terms of available key resources in real manufacturing environment. Currently, there are remarkable inefficiencies when it comes to Ensto’s practices: the system is not able to take into consideration seasonal demand and react on market changes on time; This can cause significant lost sales. However, these inefficiencies could be eliminated through the appropriate utilization of MS and RCCP tools. To utilize MS and RCCP tools in Ensto’s production environment, further testing in real production environment is required. Moreover, data accuracy, appropriate commitment to adapting and learning the new tools, and continuous developing of functions closely related to MS, such as sales forecasting, need to be ensured.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main aim of the present article is to test hypotheses derived from the model for contact- induced language change as formulated in Thomason and Kaufman (1988 et seq.). As the model correctly predicts the asymmetries between the mutual influences of the Germanic and the Romance varieties in Brussels and Strasbourg it is a very powerful tool for describing the contact patterns in these cities. The analysis shows that the contact patterns are very similar, both from a quantitative and from a qualitative point of view, despite important differences in the sociolinguistic situation of both cities. The striking similarities in the outcome of language contact seem to find a plausible explanation in the fact that the language contact situations in both cities are similar from a typological point of view: in each city a variety of French is in contact with a Germanic variety (Alsatian and Brussels Dutch). Thus, the claim of the present article is that the structure of the languages plays a more prominent role in the outcome of language contact than the sociolinguistic history of the speakers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (I the furnace scheduling of metal alloy production, and (2) moulding machine planning which specifies the type and size of production lots. A mixed integer programming (MIP) formulation of the problem is proposed, but is impractical to solve in reasonable computing time for non-small instances. As a result, a faster relax-and-fix (RF) approach is developed that can also be used on a rolling horizon basis where only immediate-term schedules are implemented. As well as a MIP method to solve the basic RF approach, three variants of a local search method are also developed and tested using instances based on the literature. Finally, foundry-based tests with a real-order book resulted in a very substantial reduction of delivery delays and finished inventory, better use of capacity, and much faster schedule definition compared to the foundry`s own practice. (c) 2006 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (1) the furnace scheduling of metal alloy production, and (2) moulding machine planning which specifies the type and size of production lots. A mixed integer programming (MIP) formulation of the problem is proposed, but is impractical to solve in reasonable computing time for non-small instances. As a result, a faster relax-and-fix (RF) approach is developed that can also be used on a rolling horizon basis where only immediate-term schedules are implemented. As well as a MIP method to solve the basic RF approach, three variants of a local search method are also developed and tested using instances based on the literature. Finally, foundry-based tests with a real-order book resulted in a very substantial reduction of delivery delays and finished inventory, better use of capacity, and much faster schedule definition compared to the foundry's own practice. © 2006 Elsevier Ltd. All rights reserved.