854 resultados para multi-project environment


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Master’s Thesis examines knowledge creation and transfer processes in an iterative project environment. The aim is to understand how knowledge is created and transferred during an actual iterative implementation project which takes place in International Business Machines (IBM). The second aim is to create and develop new working methods that support more effective knowledge creation and transfer for future iterative implementation projects. The research methodology in this thesis is qualitative. Using focus group interviews as a research method provides qualitative information and introduces the experiences of the individuals participating in the project. This study found that the following factors affect knowledge creation and transfer in an iterative, multinational, and multi-organizational implementation project: shared vision and common goal, trust, open communication, social capital, and network density. All of these received both theoretical and empirical support. As for future projects, strengthening these factors was found to be the key for more effective knowledge creation and transfer.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a genetic algorithm for the resource constrained multi-project scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on a set of randomly generated problems. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The case company in this study is a large industrial engineering company whose business is largely based on delivering a wide-range of engineering projects. The aim of this study is to create and develop a fairly simple Excel-based tool for the sales department. The tool’s main function is to estimate and visualize the profitability of various small projects. The study also aims to find out other possible and more long-term solutions for tackling the problem in the future. The study is highly constructive and descriptive as it focuses on the development task and in the creation of a new operating model. The developed tool focuses on estimating the profitability of the small orders of the selected project portfolio currently on the bidding-phase (prospects) and will help the case company in the monthly reporting of sales figures. The tool will analyse the profitability of a certain project by calculating its fixed and variable costs, then further the gross margin and operating profit. The bidding phase of small project is a phase that has not been covered fully by the existing tools within the case company. The project portfolio tool can be taken into use immediately within the case company and it will provide fairly accurate estimate of the profitability figures of the recently sold small projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The following paper builds on ongoing discussions over the spatial and territorial turns in planning, as it relates to the dynamics of evidence-based planning and knowledge production in the policy process. It brings this knowledge perspective to the organizational and institutional dynamics of transformational challenges implicit in the recent enlargement of the EU. Thus it explores the development of new spatial ideas and planning approaches, and their potential to shape or ‘frame’ spatial policy through the formulation of new institutional arrangements and the de-institutionalization of others. That is, how knowledge is created, contested, mobilized and controlled across governance architectures or territorial knowledge channels. In so doing, the paper elaborates and discusses a theoretical framework through which the interplay of knowledge and policymaking can be conceptualized and analyzed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The global marketplace is rapidly intensifying. Longer product sales lives, greater profit margins or simply survival, is dependent on management¿s ability to create and lead change. Project Management has become an important competency, combined with other business practices to adapt to the trend of changing conditions. Critical Chain is a relatively new project methodology, elaborated by Eliyahu Goldratt in order to complete projects faster, make more efficient use of resources and securing the project deliverables. The methodology is based on the assumption that traditional project techniques such as CPM and PERT, do not recognize critical human behavior. The methodology claims that many project failures are a direct result of how safety is built into the task delivery times, and then wasted by human behavior such as Student Syndrome, Parkinson Law and Multitasking. However, there has been little or no previous research regarding this topic in the Argentine marketplace. This study intended to investigate to what extent the human behavior concepts of critical chain project management are present, by performing in-depth interviews with Argentine project stakeholders. It appears that the four human behavior concepts are present in Argentina and that the majority of Argentine companies are yet to apply project management techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cloud computing has seen an impressive growth in recent years, with virtualization technologies being massively adopted to create IaaS (Infrastructure as a Service) public and private solutions. Today, the interest is shifting towards the PaaS (Platform as a Service) model, which allows developers to abstract from the execution platform and focus only on the functionality. There are several public PaaS offerings available, but currently no private PaaS solution is ready for production environments. To fill this gap a new solution must be developed. In this paper we present a key element for enabling this model: a cloud repository based on the OSGi component model. The repository stores, manages, provisions and resolves the dependencies of PaaS software components and services. This repository can federate with other repositories located in the same or different clouds, both private and public. This way, dependencies can be fulfilled collaboratively, and new business models can be implemented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Photocopy of typescript.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

É do conhecimento geral de que, hoje em dia, a tecnologia evolui rapidamente. São criadas novas arquitecturas para resolver determinadas limitações ou problemas. Por vezes, essa evolução é pacífica e não requer necessidade de adaptação e, por outras, essa evolução pode Implicar mudanças. As linguagens de programação são, desde sempre, o principal elo de comunicação entre o programador e o computador. Novas linguagens continuam a aparecer e outras estão sempre em desenvolvimento para se adaptarem a novos conceitos e paradigmas. Isto requer um esforço extra para o programador, que tem de estar sempre atento a estas mudanças. A Programação Visual pode ser uma solução para este problema. Exprimir funções como módulos que recebem determinado Input e retomam determinado output poderá ajudar os programadores espalhados pelo mundo, através da possibilidade de lhes dar uma margem para se abstraírem de pormenores de baixo nível relacionados com uma arquitectura específica. Esta tese não só mostra como combinar as capacidades do CeII/B.E. (que tem uma arquitectura multi­processador heterogénea) com o OpenDX (que tem um ambiente de programação visual), como também demonstra que tal pode ser feito sem grande perda de performance. ABSTRACT; lt is known that nowadays technology develops really fast. New architectures are created ln order to provide new solutions for different technology limitations and problems. Sometimes, this evolution is pacific and there is no need to adapt to new technologies, but things also may require a change every once ln a while. Programming languages have always been the communication bridge between the programmer and the computer. New ones keep coming and other ones keep improving ln order to adapt to new concepts and paradigms. This requires an extra-effort for the programmer, who always needs to be aware of these changes. Visual Programming may be a solution to this problem. Expressing functions as module boxes which receive determined Input and return determined output may help programmers across the world by giving them the possibility to abstract from specific low-level hardware issues. This thesis not only shows how the CeII/B.E. (which has a heterogeneous multi-core architecture) capabilities can be combined with OpenDX (which has a visual programming environment), but also demonstrates that lt can be done without losing much performance.