791 resultados para management of risks


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Changing or creating an organisation means creating a new process. Each process involves many risks that need to be identified and managed. The main risks considered here are procedural and legal risks. The former are related to the risks of errors that may occur during processes, while the latter are related to the compliance of processes with regulations. Managing the risks implies proposing changes to the processes that allow the desired result: an optimised process. In order to manage a company and optimise it in the best possible way, not only should the organisational aspect, risk management and legal compliance be taken into account, but it is important that they are all analysed simultaneously with the aim of finding the right balance that satisfies them all. This is the aim of this thesis, to provide methods and tools to balance these three characteristics, and to enable this type of optimisation, ICT support is used. This work isn’t a thesis in computer science or law, but rather an interdisciplinary thesis. Most of the work done so far is vertical and in a specific domain. The particularity and aim of this thesis is not to carry out an in-depth analysis of a particular aspect, but rather to combine several important aspects, normally analysed separately, which however have an impact and influence each other. In order to carry out this kind of interdisciplinary analysis, the knowledge base of both areas was involved and the combination and collaboration of different experts in the various fields was necessary. Although the methodology described is generic and can be applied to all sectors, the case study considered is a new type of healthcare service that allows patients in acute disease to be hospitalised to their home. This provide the possibility to perform experiments using real hospital database.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Behavioral and cognitive interventions for people with psychosis have a long and distinguished history, although the evidence for their application to young people remains limited. We anticipate that the next decades will show substantial research into psychological intervention for this population. Important targets will include the management of environmental stressors, reduction of substance misuse, and promotion of early treatment. Psychological management of positive symptoms, depression, and suicidal behavior will continue to be critical objectives. Important secondary prevention goals will be the retention of cognitive functioning, vocational options, social skills, and social network support, including appropriate family support. We expect primary prevention to include both universal programs and interventions for adolescents at particularly high risk. Technical innovations will include increasing use of Internet-based intervention and behavior cueing devices. Pressures for intervention brevity will continue, as will problems with the systematic delivery of effective procedures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Vertebral fracture (VF) is the most common osteoporotic fracture and is associated with high morbidity and mortality. Conservative treatment combining antalgic agents and rest is usually recommended for symptomatic VFs. The aim of this paper is to review the randomized controlled trials comparing the efficacy and safety of percutaneous vertebroplasty (VP) and percutaneous balloon kyphoplasty (KP) versus conservative treatment. VP and KP procedures are associated with an acceptable general safety. Although the case series investigating VP/KP have all shown an outstanding analgesic benefit, randomized controlled studies are rare and have yielded contradictory results. In several of these studies, a short-term analgesic benefit was observed, except in the prospective randomized sham-controlled studies. A long-term analgesic and functional benefit has rarely been noted. Several recent studies have shown that both VP and KP are associated with an increased risk of new VFs. These fractures are mostly VFs adjacent to the procedure, and they occur within a shorter time period than VFs in other locations. The main risk factors include the number of preexisting VFs, the number of VPs/KPs performed, age, decreased bone mineral density, and intradiscal cement leakage. It is therefore important to involve the patients to whom VP/KP is being proposed in the decision-making process. It is also essential to rapidly initiate a specific osteoporosis therapy when a VF occurs (ideally a bone anabolic treatment) so as to reduce the risk of fracture. Randomized controlled studies are necessary in order to better define the profile of patients who likely benefit the most from VP/KP.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Työn tavoitteena on tunnistaa toiminnallisia riskitekijöitä rahoituspalveluita tarjoavan yrityksen IT-organisaatiossa sekä löytää arkipäiväisiä keinoja hallita näitä riskejä. Työssä riskejä on myös tarkasteltu mahdollisen ulkoistuksen yhteydessä. Fuusiot ovat yleisiä rahoitusalan yrityksissä. Yhteenliittymien tuloksena yritysten IT-arkkitehtuuri voi olla monimutkainen ja kulttuurierot yrityksessä suuria. Synergia- ja mittakaavaetuja saadakseen yritys keskittää toimintojaan ja IT-ratkaisujaan. Riskien tunnistaminen on riskienhallintaprosessin tärkein vaihe. Tässä tutkimuksessa riskit ja riskitekijät tunnistettiin itsearvioinnin avulla kysymyssarjoja hyväksikäyttäen. Monet riskitekijät liittyivät sisäisen valvonnan ja seurannan puutteisiin. Myöhemmin näille riskeille pohdittiin työryhmässä käytännönläheisiä hallintakeinoja. Yritys voi siirtää tai jakaa IT -riskejä ulkoistamalla. Ulkoistaminen voi kuitenkin tuoda mukaan myös uusia riskitekijöitä. Ennen ulkoistamispäätöstä yrityksen sisäisten prosessien ja organisaation on oltava järjestyksessä, jotta sopimuksen kannattavuutta voidaan verrata luotettavasti saman palvelun tuottamiseen sisäisesti.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of the thesis is to examine the current state of risk management and to determine an appropriate risk management policy for commercial property derived risks in the Russian branch of a Finnish retail trade company. The employed research methodologies are comparative in-depth interviews and empirical value at risk analysis, including portfolio risk decomposition to determine the inter-currency characteristics. For a multinational retail trade company, the commercial property derived risks open up as a diverse combination of financial and non-financial risks with four distinctive interest groups. The research results indicate that geographical diversification across currency regimes provides diversification benefits. The Russian ruble is the most significant single risk component when considering the net investments outside the euro-zone. Decreasing the Russian ruble and Swedish krona exposures are the most effective methods to reduce translation derived risk. Exchange rate volatility varies over time according to idiosyncratic currency regime characteristics, and cost-effective risk management requires comprehensive analysis of the business environment. Profound and proactive risk management methods are found to be pivotal for companies with cross-border operations in order to succeed among international competitors.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A tanulmányban a szerzők arra a kérdésre keresik a választ, hogy az aszimmetrikus információk hatására a vállalkozók és a befektetők között kialakuló megbízó-ügynök viszonynak melyek a speciális vetületei a kockázatitőke-finanszírozás vonatkozásában. A szerzők arra a következtetésre jutottak, hogy a hiányos információk, a megbízó-ügynök viszony, illetve az ügyletek speciális jellege miatt fokozottan jelentkező ügynökprobléma kezelésére a kockázatitőke-finanszírozás szereplői speciális kockázatkezelési technikákat alkalmaznak. Ilyenek a magas elvárt hozamok, a szigorú kiválasztási kritériumok, a speciális befektetési vagy szindikátusi szerződések, a befektetést követő monitoring tevékenység, a több lépcsőben történő finanszírozás és a portfólióvállalatok hálózatba szervezése. A speciális kockázati megközelítés következtében a befektetéseket opciós szemlélet is áthatja. _____ This paper focuses on the special aspects of imperfect information in case of venture capital financing including principal-agent relationship between entrepreneurs and investors as well as adverse selection that evolves as a result of information asymmetries. The authors’ finding is that venture capital is able to manage the problems caused by imperfect information via applying divers risk management techniques such as high profit expectations, scrutiny of portfolio-companies, the use of special contracting stipulations and syndicate agreements, the monitoring of investments, multi-staged financing of companies and the integration of portfolio-companies into networks. In addition to the risk management techniques the authors also give the interpretation of the unique attitude of venture capital toward uncertainty and its special real option-like risk valuation approach that makes venture capitalists capable of handling high uncertainty under imperfect information.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Safety Management Systems in aviation generate training programs that develop skills needed to perform safety functions. The objective of this study is to show that, in groups, individuals need to have interpersonal skills and, in particular, ability to communicate with others, to listen, and to influence. It is for this reason that Social Skills Training is important in Aviation. Professionals trained in social skills are more likely to identify threats and risks caused by interpersonal situations, be assertive, and take appropriate action. As a contribution, this paper suggests a set of policies, procedures and practices for educating and training future professionals who will work in aviation safety.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertation submitted to Faculdade de Ciências e Tecnologia of Universidade Nova de Lisboa for the achievement of Integrated Master´s degree in Industrial Management Engineering

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVE: To provide an update to the original Surviving Sepsis Campaign clinical management guidelines, "Surviving Sepsis Campaign Guidelines for Management of Severe Sepsis and Septic Shock," published in 2004. DESIGN: Modified Delphi method with a consensus conference of 55 international experts, several subsequent meetings of subgroups and key individuals, teleconferences, and electronic-based discussion among subgroups and among the entire committee. This process was conducted independently of any industry funding. METHODS: We used the Grades of Recommendation, Assessment, Development and Evaluation (GRADE) system to guide assessment of quality of evidence from high (A) to very low (D) and to determine the strength of recommendations. A strong recommendation (1) indicates that an intervention's desirable effects clearly outweigh its undesirable effects (risk, burden, cost) or clearly do not. Weak recommendations (2) indicate that the tradeoff between desirable and undesirable effects is less clear. The grade of strong or weak is considered of greater clinical importance than a difference in letter level of quality of evidence. In areas without complete agreement, a formal process of resolution was developed and applied. Recommendations are grouped into those directly targeting severe sepsis, recommendations targeting general care of the critically ill patient that are considered high priority in severe sepsis, and pediatric considerations. RESULTS: Key recommendations, listed by category, include early goal-directed resuscitation of the septic patient during the first 6 hrs after recognition (1C); blood cultures before antibiotic therapy (1C); imaging studies performed promptly to confirm potential source of infection (1C); administration of broad-spectrum antibiotic therapy within 1 hr of diagnosis of septic shock (1B) and severe sepsis without septic shock (1D); reassessment of antibiotic therapy with microbiology and clinical data to narrow coverage, when appropriate (1C); a usual 7-10 days of antibiotic therapy guided by clinical response (1D); source control with attention to the balance of risks and benefits of the chosen method (1C); administration of either crystalloid or colloid fluid resuscitation (1B); fluid challenge to restore mean circulating filling pressure (1C); reduction in rate of fluid administration with rising filing pressures and no improvement in tissue perfusion (1D); vasopressor preference for norepinephrine or dopamine to maintain an initial target of mean arterial pressure > or = 65 mm Hg (1C); dobutamine inotropic therapy when cardiac output remains low despite fluid resuscitation and combined inotropic/vasopressor therapy (1C); stress-dose steroid therapy given only in septic shock after blood pressure is identified to be poorly responsive to fluid and vasopressor therapy (2C); recombinant activated protein C in patients with severe sepsis and clinical assessment of high risk for death (2B except 2C for postoperative patients). In the absence of tissue hypoperfusion, coronary artery disease, or acute hemorrhage, target a hemoglobin of 7-9 g/dL (1B); a low tidal volume (1B) and limitation of inspiratory plateau pressure strategy (1C) for acute lung injury (ALI)/acute respiratory distress syndrome (ARDS); application of at least a minimal amount of positive end-expiratory pressure in acute lung injury (1C); head of bed elevation in mechanically ventilated patients unless contraindicated (1B); avoiding routine use of pulmonary artery catheters in ALI/ARDS (1A); to decrease days of mechanical ventilation and ICU length of stay, a conservative fluid strategy for patients with established ALI/ARDS who are not in shock (1C); protocols for weaning and sedation/analgesia (1B); using either intermittent bolus sedation or continuous infusion sedation with daily interruptions or lightening (1B); avoidance of neuromuscular blockers, if at all possible (1B); institution of glycemic control (1B), targeting a blood glucose < 150 mg/dL after initial stabilization (2C); equivalency of continuous veno-veno hemofiltration or intermittent hemodialysis (2B); prophylaxis for deep vein thrombosis (1A); use of stress ulcer prophylaxis to prevent upper gastrointestinal bleeding using H2 blockers (1A) or proton pump inhibitors (1B); and consideration of limitation of support where appropriate (1D). Recommendations specific to pediatric severe sepsis include greater use of physical examination therapeutic end points (2C); dopamine as the first drug of choice for hypotension (2C); steroids only in children with suspected or proven adrenal insufficiency (2C); and a recommendation against the use of recombinant activated protein C in children (1B). CONCLUSIONS: There was strong agreement among a large cohort of international experts regarding many level 1 recommendations for the best current care of patients with severe sepsis. Evidenced-based recommendations regarding the acute management of sepsis and septic shock are the first step toward improved outcomes for this important group of critically ill patients.