841 resultados para Teaching, Case Study, Project Management
Resumo:
Putting the student first when designing your processes can help you achieve your goals
Resumo:
In this presentation, a business instructor will discuss a variety of Blackboard functions and describe how technology enhances teaching and learning. It will also address the challenges and issues facing both instructors and students in an online learning environment.
Resumo:
Mode of access: Internet.
Resumo:
This case study is based in Mundo Verde, a Brazilian natural products company, and its focused on the strategic decisions the company has to make to overcome the current problems. The case is built around three major theoretical perspectives: Competitive advantages from a Resource Based View, Brand Identity and Entrepreneurship. In the case is presented first the company, disclosing the necessary information to analyze and comprehend Mundo Verde, by accurately identifying the company´s competitive advantages. Next the student is presented to a narrative where the CEO of the company meets one of the franchisees in an attempt to find out more about the company´s issues and to see how the stores are working. Several scenarios are presented to the students which represent several possibilities of action, considering the company, the problems to be addressed and the objectives of the company.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.
Resumo:
Nowadays due to the crisis, some government measures are aimed at reducing healthcare spending, affecting in some level or another the quality offered. Process management is said to be a useful tool for reducing healthcare costs by improving management without any additional economic investment. That is doing more with the same resources and without reducing the quality offered. In this study an empirical case of a Catalan hospital is presented. Overall, the usefulness of process management in the healthcare sector is shown and some tips are provided for those managers that want to implement this management system in their hospitals. This work is also interesting for those managers responsible for the National Healthcare System due to a big question is stated: what would happen if process management was implemented in the whole healthcare system?
Resumo:
Purpose - The main objective of the paper is to develop a risk management framework for software development projects from developers' perspective. Design/methodology/approach - This study uses a combined qualitative and quantitative technique with the active involvement of stakeholders in order to identify, analyze and respond to risks. The entire methodology has been explained using a case study on software development project in a public sector organization in Barbados. Findings - Analytical approach to managing risk in software development ensures effective delivery of projects to clients. Research limitations/implications - The proposed risk management framework has been applied to a single case. Practical implications - Software development projects are characterized by technical complexity, market and financial uncertainties and competent manpower availability. Therefore, successful project accomplishment depends on addressing those issues throughout the project phases. Effective risk management ensures the success of projects. Originality/value - There are several studies on managing risks in software development and information technology (IT) projects. Most of the studies identify and prioritize risks through empirical research in order to suggest mitigating measures. Although they are important to clients for future projects, these studies fail to provide any framework for risk management from software developers' perspective. Although a few studies introduced framework of risk management in software development, most of them are presented from clients' perspectives and very little effort has been made to integrate this with the software development cycle. As software developers absorb considerable amount of risks, an integrated framework for managing risks in software development from developers' perspective is needed. © Emerald Group Publishing Limited.
Resumo:
This paper reports on a study that demonstrates how to apply pattern matching as an analytical method in case-study research. Case-study design is appropriate for the investigation of highly-contextualized phenomena that occur within the social world. Case-study design is considered a pragmatic approach that permits employment of multiple methods and data sources in order to attain a rich understanding of the phenomenon under investigation. The findings from such multiple methods can be reconciled in case-study analysis, specifically through a pattern-matching technique. Although this technique is theoretically explained in the literature, there is scant guidance on how to apply the method practically when analyzing data. This paper demonstrates the steps taken during pattern matching in a completed case-study project that investigated the influence of cultural diversity in a multicultural nursing workforce on the quality and safety of patient care. The example highlighted in this paper contributes to the practical understanding of the pattern-matching process, and can also make a substantial contribution to case-study methods.
Resumo:
In financial decision-making, a number of mathematical models have been developed for financial management in construction. However, optimizing both qualitative and quantitative factors and the semi-structured nature of construction finance optimization problems are key challenges in solving construction finance decisions. The selection of funding schemes by a modified construction loan acquisition model is solved by an adaptive genetic algorithm (AGA) approach. The basic objectives of the model are to optimize the loan and to minimize the interest payments for all projects. Multiple projects being undertaken by a medium-size construction firm in Hong Kong were used as a real case study to demonstrate the application of the model to the borrowing decision problems. A compromise monthly borrowing schedule was finally achieved. The results indicate that Small and Medium Enterprise (SME) Loan Guarantee Scheme (SGS) was first identified as the source of external financing. Selection of sources of funding can then be made to avoid the possibility of financial problems in the firm by classifying qualitative factors into external, interactive and internal types and taking additional qualitative factors including sovereignty, credit ability and networking into consideration. Thus a more accurate, objective and reliable borrowing decision can be provided for the decision-maker to analyse the financial options.