992 resultados para Six Sigma Culture
Resumo:
Six sigma is a quality improvement philosophy with systematic and formal approach. In order to successfully implement and utilize six sigma the basic disciplines of it should be adopted by the entire organization. Furthermore, employee involvement is crucial in six sigma implementation. This thesis addresses the challenges of long-lasting involvement in the case company. It focuses on gaps of involving six sigma trained employees, Black Belts. Theoretical framework of the thesis illustrates different factors influencing employee involvement. Influencing factors can be divided into ten categories: organizational culture, managerial commitment, leadership style, employee empowerment, employees’ perceptions, communication, training, goals, performance measurement and incentives. Factors and categories overlap and are related to each other. The framework provides holistic view of employee involvement in six sigma context but can be used also with other quality management philosophies. This thesis was conducted as a case study and written on an assignment to a power and automation technology company. Due to the nature of research problem, the data collection was conducted by interviewing case company personnel. In order to study involvement from employees’ point of view interview questions were designed to be open-ended and to allow the interviewees to tell freely about the phenomenon. This thesis provides empirical support on previous studies in organizational support, management commitment and employee empowerment. In addition, it indicates the importance of separate function for Black Belts in the organization. The gaps in Black Belt involvement can be categorized under two categories: Management driven gaps are related to management commitment, organizational structure and culture and information systems. Black Belt driven gaps are related to practice and effort of using six sigma. This thesis finds solutions for bridging these gaps in the case company by applying findings from literature research and suggestions given by the interviewees. For each gap, actions are suggested for bridging the discrepancy between current and desired situations. The thesis states that in order to embed six sigma in the organization the most crucial gaps, lack of management commitment, six sigma vision and possibilities to use six sigma, should be diminished.
Resumo:
Six sigma is a quality improvement philosophy with systematic and formal approach. In order to successfully implement and utilize six sigma the basic disciplines of it should be adopted by the entire organization. Furthermore, employee involvement is crucial in six sigma implementation. This thesis addresses the challenges of long-lasting involvement in the case company. It focuses on gaps of involving six sigma trained employees, Black Belts. Theoretical framework of the thesis illustrates different factors influencing employee involvement. Influencing factors can be divided into ten categories: organizational culture, managerial commitment, leadership style, employee empowerment, employees’ perceptions, communication, training, goals, performance measurement and incentives. Factors and categories overlap and are related to each other. The framework provides holistic view of employee involvement in six sigma context but can be used also with other quality management philosophies. This thesis was conducted as a case study and written on an assignment to a power and automation technology company. Due to the nature of research problem, the data collection was conducted by interviewing case company personnel. In order to study involvement from employees’ point of view interview questions were designed to be open-ended and to allow the interviewees to tell freely about the phenomenon. This thesis provides empirical support on previous studies in organizational support, management commitment and employee empowerment. In addition, it indicates the importance of separate function for Black Belts in the organization. The gaps in Black Belt involvement can be categorized under two categories: Management driven gaps are related to management commitment, organizational structure and culture and information systems. Black Belt driven gaps are related to practice and effort of using six sigma. This thesis finds solutions for bridging these gaps in the case company by applying findings from literature research and suggestions given by the interviewees. For each gap, actions are suggested for bridging the discrepancy between current and desired situations. The thesis states that in order to embed six sigma in the organization the most crucial gaps, lack of management commitment, six sigma vision and possibilities to use six sigma, should be diminished.
Resumo:
The application of Lean Six Sigma (LSS) varies in different regions of the world in terms of both level of understanding and acceptability. Employing a qualitative methodological approach, this paper aims to explore factors hindering the acceptability of the LSS initiative in organizations and list factors required for successful application and implementation in a developing economy from the perspective of LSS consultants. Using Nigeria as a case study, primary data were collected though a number of semi-structured interviews with representatives of leading continuous improvement consultancy firms in Nigeria. Finding draws out links between major factors such as drivers and motivation, LSS performance, marketability and challenges to the acceptability and applicability of LSS in Nigeria. Further findings highlight major factors such as lack of management buy-in, level of awareness, certification driven market, Nigerian environment and culture, etc as problems that hinder successful implementation of LSS in Nigeria. This paper contributes to the theoretical foundation of critical success factors required for the implementation of Lean Six Sigma, with results from the experience of a developing economy.
Resumo:
The diffusion of Pollution Prevention faces organizational barriers as for instance resistance to change, insufficient support from decision-makers, unclear project leadership, insufficient employee accountability and inflexible organizational structures. To understand how to overcome such barriers, the performance of a Pollution Prevention program of a multinational corporation is analyzed. The quantitative analyses of 2096 Pollution Prevention projects conducted between 1995 and 2007 support the conclusion that the performance of the Pollution Prevention program increased after the implementation of the Six Sigma program. Moreover, the analyses of 1906 Pollution Prevention projects and 31,133 Six Sigma projects for cost reduction in 27 countries indicate that in countries where the implementation of Six Sigma is more expressive, pollution is prevented more than in countries with less expressive Six Sigma implementation. In fact, the Six Sigma implementation improved the organizational capability for data based project management. Therefore, comparing six years before and six years after the Six Sigma implementation, the total number of Pollution Prevention projects recognized increased 6.9 times and the total amount of pollution prevented increased by 62%. The qualitative analysis describes how the Six Sigma program interacts with the Pollution Prevention program in the studied company. (C) 2009 Elsevier Ltd. All rights reserved.
Resumo:
Artigo elaborador no âmbito dos trabalhos decorrentes à dissertação de Mestrado do Aluno David Leite, no Mestrado em Gestão Integrada Qualidade, Ambiente e Segurança, ESTGF-IPP, Oreintados pelos Professores Luís Fonseca (ISEP-IPP) e Vanda Lima (ESTGF-IPP).
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial
Resumo:
O Sector da Aviação Civil tem sofrido diversas alterações nos últimos anos. No entanto, os padrões de segurança têm forçosamente de ser mantidos. As alterações ao nível da regulamentação e consequente racionalização de todo o Sector abrangem o ramo da Manutenção de Aeronaves, que é alvo de especial atenção. A metodologia Six Sigma tem vindo a ser desenvolvida desde os anos 80 do século passado, altura em que teve a sua origem no sector da Indústria, no entanto, o seu desenvolvimento no sector dos serviços, onde se inclui a formação profissional em manutenção aeronáutica, tem vindo a crescer. O presente estudo tem o objectivo de avaliar o contributo da metodologia Six Sigma no âmbito da formação em Manutenção Aeronáutica numa MTO (Maintenance Training Organisation), abordando algumas formas para a aplicação dos passos DMAIC (Define-Measure-Analyze-Improve-Control) na empresa TAP MTO. Explora-se a potencialidade desta metodologia na identificação e na decomposição dos problemas até à sua complexidade mínima, facilitando assim a resolução dos mesmos. Verifica-se que a aplicação da metodologia Six Sigma pode ser feita sem o recurso a alterações na estrutura orgânica de uma Organização, trazendo consigo inúmeros benefícios, tanto financeiros como operacionais. A metodologia aplicada não rompe com os recursos e metodologias já existentes. Permite, no entanto, uma “reciclagem” dos mesmos, aumentando a sua importância e utilidade, sem necessidade da reformulação de todo o processo. Existe ainda uma alteração na abordagem de dificuldades e o envolvimento dos cargos de Gestão mais elevados no processo de mudança.
Resumo:
Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.
Resumo:
Overall Equipment Effectiveness (OEE) is the key metric of operational excellence. OEE monitors the actual performance of equipment relative to its performance capabilities under optimal manufacturing conditions. It looks at the entire manufacturing environment measuring, in addition to the equipment availability, the production efficiency while the equipment is available to run products, as well as the efficiency loss that results from scrap, rework, and yield losses. The analysis of the OEE provides improvement opportunities for the operation. One of the tools used for OEE improvement is Six Sigma DMAIC methodology which is a set of practices originally developed to improve processes by eliminating defects. It asserts the continuous efforts to reduce variation in process outputs as key to business success, as well as the possibility of measurement, analysis, improvement and control of manufacturing and business processes. In the case of the Bottomer line AD2378 in Papsac Maghreb Casablanca plant, the OEE figures reached 48.65 %, which is below the accepted OEE group performance. This required immediate actions to achieve OEE improvement. This Master thesis focuses on the application of Six Sigma DMAIC methodology in the OEE improvement on the Bottomer Line AD2378 in Papsac Maghreb Casablanca plant. First, the Six Sigma DMAIC and OEE usage in operation measurement will be discussed. Afterwards, the different DMAIC phases will allow the identification of improvement focus, the identification of OEE low performance causes and the design of improvement solutions. These will be implemented to allow further tracking of improvement impact on the plant operations.
Resumo:
Diplomityössä tarkastellaan hitsaavan verkoston laadunhallintaa ja siinä ilmeneviä erilaisia ongelmakohtia. Tämän lisäksi työssä tarkastellaan kolmen eri laatutyökalun Lean, Six Sigma ja Total Welding Management soveltamista hitsaavan verkoston laadunhallinnassa. Teoriaosassa käsitellään sekä yleisesti että hitsauksen osalta laatua ja laadunhallintaa, sekä edellä mainittuja laatutyökaluja. Tutkimusosaan tietoja hitsaavista verkostoista kerättiin kaikkiaan kolmesta eri verkostosta. Näiden kerättyjen tietojen pohjalta tarkasteltiin valittujen laatutyökalujen soveltuvuutta verkostomaiseen käyttöön. Verkostoitunut toiminta aiheuttaa monia uusia haasteita yritysten laadunhallinnalle verrattuna yksittäisiin hitsaaviin yrityksiin. Suurimpia tutkimuksessa havaittuja ongelmakohtia ovat suunnittelun ja valmistuksen yhteistyön erilaiset puutteet, laatutasoon ja sen varmistukseen liittyvät asiat, sekä verkoston sisälle syntyvä niin sanottu hiljainen tieto ja sen häviäminen. Tutkimuksen tarkastelujen perusteella havaittiin, että kaikkien tutkimukseen valitun kolmen laatutyökalun soveltaminen myös verkostomaisessa toiminnassa on mahdollista, mutta se vaatii huomattavasti suurempaa työpanosta kuin soveltaminen yksittäisessä yrityksessä. Myös näiden kaikkien kolmen työkalun yhtä aikainen käyttö on mahdollista. Juuri oikean työkalun valitseminen kullekin hitsaavalle verkostolle vaatii tarkkaa perehtymistä verkostoon ja sen tilanteeseen.
Resumo:
Few people see both opportunities and threats coming from IT legacy in current world. On one hand, effective legacy management can bring substantial hard savings and smooth transition to the desired future state. On the other hand, its mismanagement contributes to serious operational business risks, as old systems are not as reliable as it is required by the business users. This thesis offers one perspective of dealing with IT legacy – through effective contract management, as a component towards achieving Procurement Excellence in IT, thus bridging IT delivery departments, IT procurement, business units, and suppliers. It developed a model for assessing the impact of improvements on contract management process and set of tools and advices with regards to analysis and improvement actions. The thesis conducted case study to present and justify the implementation of Lean Six Sigma in IT legacy contract management environment. Lean Six Sigma proved to be successful and this thesis presents and discusses all the steps necessary, and pitfalls to avoid, to achieve breakthrough improvement in IT contract management process performance. For the IT legacy contract management process two improvements require special attention and can be easily copied to any organization. First is the issue of diluted contract ownership that stops all the improvements, as people do not know who is responsible for performing those actions. Second is the contract management performance evaluation tool, which can be used for monitoring, identifying outlying contracts and opportunities for improvements in the process. The study resulted in a valuable insight on the benefits of applying Lean Six Sigma to improve IT legacy contract management, as well as on how Lean Six Sigma can be applied in IT environment. Managerial implications are discussed. It is concluded that the use of data-driven Lean Six Sigma methodology for improving the existing IT contract management processes is a significant addition to the existing best practices in contract management.
Resumo:
The objective of this research is to demonstrate the use of Lean Six Sigma methodology in a manufacturing lead time improvement project. Moreover, the goal is to develop working solutions for the target company to improve its manufacturing lead time. The theoretical background is achieved through exploring the literature of Six Sigma, Lean and Lean Six Sigma. The development will be done in collaboration with the related stakeholders, by following the Lean Six Sigma improvement process DMAIC and by analyzing the process data from the target company. The focus of this research is in demonstrating how to use Lean Six Sigma improvement process DMAIC in practice, rather than in comparing Lean Six Sigma to other improvement methodologies. In order to validate the manufacturing system’s current state, improvement potential and solutions, statistical tools such as linear regression analysis were used. This ensured that all the decisions were as heavily based on actual data as possible. As a result of this research, a set of solutions were developed and implemented in the target company. These solutions included batch size reduction, bottleneck shift, first-in first-out queuing and shifting a data entry task from production planners to line workers. With the use of these solutions, the target company was able to reduce its manufacturing lead time by over one third.
Resumo:
Imagine the potential implications of an organization whose business and IT processes are well aligned and are capable of reactively and proactively responding to the external and internal changes. The Philips IT Infrastructure and Operations department (I&O) is undergoing a series of transformation activities to help Philips business keeping up with the changes. I&O would serve a critical function in any business sectors; given that the I&O’s strategy switched from “design, build and run” to “specify, acquire and performance manage”, that function is amplified. In 2013, I&O’s biggest transforming programme I&O Futures engaged multiple interdisciplinary departments and programs on decommissioning legacy processes and restructuring new processes with respect to the Information Technology Internet Library (ITIL), helping I&O to achieve a common infrastructure and operating platform (CI&OP). The author joined I&O Futures in the early 2014 and contributed to the CI&OP release 1, during which a designed model Bing Box and its evaluations were conducted through the lens of six sigma’s structured define-measure-analyze-improve-control (DMAIC) improvement approach. This Bing Box model was intended to firstly combine business and IT principles, namely Lean IT, Agile, ITIL best practices, and Aspect-oriented programming (AOP) into a framework. Secondly, the author implemented the modularized optimization cycles according to the defined framework into Philips’ ITIL-based processes and, subsequently, to enhance business process performance as well as to increase efficiency of the optimization cycles. The unique of this thesis is that the Bing Box model not only provided comprehensive optimization approaches and principles for business process performance, but also integrated and standardized optimization modules for the optimization process itself. The research followed a design research guideline that seek to extend the boundaries of human and organizational capabilities by creating new and innovative artifacts. The Chapter 2 firstly reviewed the current research on Lean Six Sigma, Agile, AOP and ITIL, aiming at identifying the broad conceptual bases for this study. In Chapter 3, we included the process of constructing the Bing Box model. The Chapter 4 described the adoption of Bing Box model: two-implementation case validated by stakeholders through observations and interviews. Chapter 5 contained the concluding remarks, the limitation of this research work and the future research areas. Chapter 6 provided the references used in this thesis.