977 resultados para Project control


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to develop a suitable project control procedure for a target company that can be used in engineering, procurement, and construction or con-struction management contracts. This procedure contains suitable project control software and a model for the use of the software in practice. This study is divided into two main sections. Theoretical part deals with project management, focusing on cost and time dimensions in projects. Empirical part deals with the development of the project control procedure for the target compa-ny. This development takes place in two parts. In the first part, semi-structured interviews are used to find out the company’s employees’ demands and desires for the project control software which will then be used in the developed procedure. These demands and desires are compared to available software in the market and the most suitable one will be chosen. Interview results show that important factors are cost tracking, integration with other software, English language availability, references, helpdesk, and no need for regular updates. The most suitable one is CMPro5 cost control software. The chosen software is used in a pilot project, where its functions and use are analyzed. Project control procedure which will be used in the future is developed based on these procedures. The five steps in developed procedure include employment of a cost engineer, whose task is to maintain the procedure in the target company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

La dissertazione affronterà il tema del controllo qualità nei progetti, applicando conoscenze, tecniche e strumenti propri del Project e del Multiproject Management. L’analisi partirà svolgendo, nel primo capitolo, considerazioni introduttive riguardo le due discipline citate. Lo scopo ultimo sarà quello di elaborare un sistema di controllo integrato della qualità, indirizzato principalmente al Project Management che è presente in una qualsiasi organizzazione che opera per progetti. Nel secondo capitolo verrà illustrato il metodo denominato Multidimensional Project control System sul quale il modello sviluppato in seguito si basa. La progettazione di un sistema di controllo è una parte importante dello sforzo di gestione di un progetto. Tale sistema è basato su una serie di obiettivi di progetto e sulla loro importanza relativa e fonda la sua natura su una sistematica valutazione in corso d’opera dello stato di conformità del progetto, sia a livello di processo che a livello di output. Nel capitolo conclusivo si affronta l’obiettivo principale di questo elaborato. Sono stati forniti dati e documenti dall’azienda Despar Italia c.r.l. ed è stato chiesto di sviluppare un metodo di controllo che il Project Management potesse utilizzare per implementare un processo di verifica della qualità di progetto. Viene quindi descritta l’azienda, come il Management pianifica, gestisce e controlla i progetti e quali necessità devono essere soddisfatte. Si procede poi con l’illustrazione e spiegazione del metodo sviluppato, chiarito da un esempio esplicativo. L’elaborato si concluderà con delle riflessioni finali, proponendo critiche e spunti per eventuali sviluppi futuri.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Aquest treball de fi de carrera, com descriu el seu títol, consisteix a dissenyar i implementar un sistema de control de projectes. Com tot projecte, complirà el requisit de disposar d'un pla que permeti fer un seguiment dels terminis d'execució, de les fites establertes i un control dels lliurables identificats. Pel fet de tractar-se del desenvolupament d'un sistema informàtic, considerarà les etapes d'especificació de requisits, anàlisi, disseny, codificació, proves unitàries i proves funcionals, i es generaran els informes pertinents que serveixin de documentació i de referència en les etapes posteriors. Des d'un punt de vista tecnològic, permetrà aprofundir en el coneixement de l'estructura de funcionament del PL/SQL d'Oracle (crides a procediments i, especialment, al tractament).

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Aquest treball de final de carrera té com a objectiu fer el disseny i la implementació d'un sistema de control de projectes per a una organització, de manera que la seva estructura interna i funcionament segueixin els paràmetres especificats a l'enunciat proporcionat per la consultora de l'assignatura. El sistema ha de recollir informació sobre quan de temps i en què treballa cada treballador, i quines han estat les despeses mentre ha estat assignat a cada projecte o tasca. D'aquesta manera, a més de tenir un control horari del treballador, l'organització sabrà perfectament si la realització d'un projecte ha estat rendible i disposarà, durant el desenvolupament, de dades sobre l'evolució de costos i hores per a executar les actuacions correctives pertinents.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

L'objectiu d'aquest treball és fer el disseny i la implementació d'un sistema de control de projectes per a una organització X, de manera que la seva estructura i funcionament compleixin uns requisits inicials.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Geographical Information System (GIS) is a tool that has recently been applied to better understand spatial disease distributions. Using meteorological, social, sanitation, mollusc distribution data and remote sensing variables, this study aimed to further develop the GIS technology by creating a model for the spatial distribution of schistosomiasis and to apply this model to an area with rural tourism in the Brazilian state of Minas Gerais (MG). The Estrada Real, covering about 1,400 km, is the largest and most important Brazilian tourism project, involving 163 cities in MG with different schistosomiasis prevalence rates. The model with three variables showed a R² = 0.34, with a standard deviation of risk estimated adequate for public health needs. The main variables selected for modelling were summer vegetation, summer minimal temperature and winter minimal temperature. The results confirmed the importance of Remote Sensing data and the valuable contribution of GIS in identifying priority areas for intervention in tourism regions which are endemic to schistosomiasis.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Software projects have proved to be troublesome to be implemented and as the size of software keeps increasing it is more and more important to follow-up the projects. The proportion of succeeded software projects is still quite low in spite of the research and the development of the project control methodologies. The success and failure factors of projects are known, as well as the project risks but nevertheless the projects still have problems with keeping the schedule and the budget and achieving the defined functionality and adequate quality. The purpose of this thesis was to find out what deviations are there in projects at the moment, what causes them, and what is measured in projects. Also project deviation was defined in the viewpoint of literature and field experts. The analysis was made using a qualitative research approach. It was found out that there are still deviations in software projects with schedule, budget, quality, requirements, documenting, effort, and resources. In addition also changes in requirements were identified. It was also found out that for example schedule deviations can be affected by reducing the size of a task and adding measurements.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Työssä on tutkittu sähkösuunnittelun projektityön hallintaa ja kehittämistä. Tavoitteena oli löytää ongelmia ja pyrkiä korjaamaan niitä, jotta suunnittelu olisi mahdollisimman toimivaa. Tutkimus perustuu kirjallisuuteen ja haastatteluihin. Työssä perehdytään kirjallisuuden avulla projektin peruskäsitteisiin ja hallintaan sekä sähkösuunnittelun projektin yleiseen toteutukseen. Haastattelujen avulla on selvitetty tämän hetkistä tilannetta sähkösuunnitteluprojektin hallinnasta ja siihen liittyvistä ongelmista Pöyryn Kouvolan konttorissa. Työn tuloksena on selvitetty merkittävimpiä ongelmia, jotka esiintyvät sähkösuunnitteluprojektissa. Työ keskittyy pääosin sähkösuunnitteluprojektin hallinnallisiin ongelmiin ja niiden toteutukseen. Kirjallisuuden ja haastattelujen pohjalta on koottu ohjeita sähkösuunnittelun projektinhallintaan