912 resultados para Performance-based pay


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main objective of this study is to determine the attitudes of school principals regarding a performance based compensation system. This study identifies the attitudes towards specific factors that should be considered in the implementation of a system of performance based compensation. The data have been analyzed to determine if a principal's demographic characteristics affect his/her level of agreement with performance based compensation and the factors for implementation. In addition, this study unveils areas of concern that principals have conveyed regarding the implementation of a performance based compensation system. Data was obtained from 444 public school principals representing 444 schools and 178 districts in the state of Colorado. Measures used in the treatment of the data include descriptive statistics and one-way ANOVA. The major findings of this study were: 1. 82.4% of respondents believe that teachers, principals and administrators should be included in performance based compensation (PBC). 2. The top two indicators that respondents believed should be included in a PBC system are student achievement (88.5%) and teacher evaluations (77.6%) 3. The 3 largest obstacles to PBC that respondents identified are: a. The capacity to link student achievement to teacher evaluations (82.9%) b. Teacher Union Resistance (67.1%) c. Cost (55.9%) 4. Principals in urban, rural and suburban geographic groups disagree about the effects of performance based compensation. 5. The top 5 overall concerns regarding Performance Based Compensation were: a. Concerns regarding effectively using assessment to measure performance of all teachers/equity between teachers b. Concerns regarding evaluation (time for principals to learn, consistency from school to school, time for principals to evaluate, quality of evaluation tool). c. Not in favor of PBC due to philosophical views or concerns about lack of research. d. Concerns regarding the equity between classrooms and districts across the state due to poverty levels and unequal resources. e. Concerns that performance based compensation will result in a decline in teacher collaboration and an increase in competition between teachers. Based upon these findings, the researcher concluded that there is not a strong general acceptance of performance based compensation systems. However, urban principals in Colorado tend to view PBC somewhat more favorably than do principals in suburban or rural areas. Most importantly, systems to link student achievement to teacher evaluation must be collaboratively created to ensure PBC systems are equitable, consistent and fair.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Performance improvements subsequent to the implementation of a pay-for-performance plan can result because more productive employees self-select into the firm (selection effect) and/or because employees allocate effort to become more effective (effort effect). We analyze individual performance data for 3,776 sales employees of a retail firm to evaluate these alternative sources of continuing performance improvement. The incentive plan helps the firm attract and retain more productive sales employees, and motivates these employees to further improve their productivity. In contrast, the less productive sales employees’ performance declines before they leave the firm.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Much management accounting research focuses on design of incentive compensation contracts. A basic assumption in these contracts is that performance-based incentives improve employee performance. This paper reports on a field test of the multi-period incentive effects of a performance-based compensation plan on the sales of a retail establishment. Analysis of panel data for 15 retail outlets over 66 months indicates a sales increase when the plan is implemented, an effect that persists and increases over time. Sales gains are significantly lower in the peak selling season when more temporary workers are employed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A conventional method for seismic strengthening of masonry walls is externally application of reinforced concrete layer (shotcrete). However, due to the lack of analytical and experimental information on the behavior of strengthened walls, the design procedures are usually followed based on the empirical relations. Using these design procedures have resulted in massive strengthening details in retrofitting projects. This paper presents a computational framework for nonlinear analysis of strengthened masonry walls and its versatility has been verified by comparing the numerical and experimental results. Based on the developed numerical model and available experimental information, design relations and failure modes are proposed for strengthened walls in accordance with the ASCE 41 standard. Finally, a sample masonry structure has been strengthened using the proposed and available conventional methods. It has been shown that using the proposed method results in lower strengthening details and appropriate (ductile) failure modes

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this article is to explain what factors determine the use of seniority-based pay for production workers in Spanish manufacturing industry. The data used in order to achieve these objectives was taken from 774 Spanish industrial plants. The estimation of several ordered probit models enabled us to see that in firms where it was more costly for management to engage in opportunistic behaviour, deferred payment shows a negative relation to the use of devices, like monitoring or incentive payment, designed to align workers’ objectives with those of the company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The goal in highway construction and operation has shifted from method based specifications to specifications relating desired performance attributes to materials, mix designs, and construction methods. Shifting from method specifications to performance based specifications can work as an incentive or disincentive for the contractor to improve performance or extend pavement life. This literature search was directed at a review of existing portland cement concrete performance specification development, and the criteria that can effectively measure pavement performance. The criteria identified in the literature include concrete strength, slab thickness, air content, initial smoothness, water-cement ratio, unit weight, and slump. A description of each criterion, along with the advantages, disadvantages, and test methods for each are identified. Also included are the results from a survey that was sent out to various state, federal, and trade agencies. The responses indicated that 53% currently use or are developing a performance based specification program. Of the 47% of agencies that do not use a performance based specification program, over 34% indicated that they would consider a similar program. The most commonly measured characteristics include thickness, strength, smoothness, and air content. Lastly recommendations and conclusions are made regarding other factors that affect pavement performance and a proposed second phase of the research is suggested. The research team suggests that a regional expert task group be formed to identify performance levels and criteria. The results of that effort will guide the research team in the development of new or revised specifications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this study is to view credit risk from the financier’s point of view in a theoretical framework. Results and aspects of the previous studies regarding measuring credit risk with accounting based scoring models are also examined. The theoretical framework and previous studies are then used to support the empirical analysis which aims to develop a credit risk measure for a bank’s internal use or a risk management tool for a company to indicate its credit risk to the financier. The study covers a sample of Finnish companies from 12 different industries and four different company categories and employs their accounting information from 2004 to 2008. The empirical analysis consists of six stage methodology process which uses measures of profitability, liquidity, capital structure and cash flow to determine financier’s credit risk, define five significant risk classes and produce risk classification model. The study is confidential until 15.10.2012.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Clients and contractors need to be aware of the project’s legal environment because the viability of a procurement strategy can be vitiated by legal rules. This is particularly true regarding Performance-Based Contracting (PBC) whose viability may be threatened by rules of property law: while the PBC concept does not require that the contractor transfers the ownership in the building materials used to the client, the rules of property law often lead to an automatic transfer of ownership. But does the legal environment really render PBC unfeasible? In particular, is PBC unfeasible because contractors lose their materials as assets? These questions need to be answered with respect to the applicable property law. As a case study, English property law has been chosen. Under English law, the rule which governs the automatic transfer of ownership is called quicquid plantatur solo, solo credit (whatever is fixed to the soil belongs to the soil). An analysis of this rule reveals that not all materials which are affixed to land become part of the land. This fate only occurs in relation to materials which have been affixed with the intention of permanently improving the land. Five fictitious PBC cases have been considered in terms of the legal status of the materials involved, and several subsequent legal questions have been addressed. The results suggest that English law does actually threaten the feasibility of PBC in some cases. However, it is also shown that the law provides means to circumvent the unwanted results which flow from the rules of property law. In particular, contractors who are interested in keeping their materials as assets can insist on agreeing a property right in the client’s land, i.e. a contractor’s lien. Therefore, the outcome is that English property law does not render the implementation of the PBC concept unfeasible. At a broader level, the results contribute to the theoretical framework of PBC as an increasingly used procurement strategy.

Relevância:

100.00% 100.00%

Publicador: