900 resultados para Net expected return
Resumo:
For the last three decades, the Capital Asset Pricing Model (CAPM) has been a dominant model to calculate expected return. In early 1990% Fama and French (1992) developed the Fama and French Three Factor model by adding two additional factors to the CAPM. However even with these present models, it has been found that estimates of the expected return are not accurate (Elton, 1999; Fama &French, 1997). Botosan (1997) introduced a new approach to estimate the expected return. This approach employs an equity valuation model to calculate the internal rate of return (IRR) which is often called, 'implied cost of equity capital" as a proxy of the expected return. This approach has been gaining in popularity among researchers. A critical review of the literature will help inform hospitality researchers regarding the issue and encourage them to implement the new approach into their own studies.
Resumo:
A corporate firm may influence policies in its favor by transferring money to political candidates. However, empirical studies which document evidence about the return on campaign donations are rare (Großer, Reuben and Tymula, 2013). In this paper we estimate the net expected return of a campaign donation in eight Brazilian states using a Regression Discontinuity Design (RDD) to separate the return of winning and losing state deputy candidates in the electoral coalition in 2006. Our results show that that the net return is quite high (i.e., the investment of donor firms is almost 2% of the net expected return), and is larger among traditional electoral parties than any other parties, on average. Looking at the heterogeneity of local executive and legislative levels, we find that net returns are higher when donor firms finance deputies within a governor’s electoral coalition than deputies outside this coalition.
Resumo:
This paper demonstrates that an asset pricing model with least-squares learning can lead to bubbles and crashes as endogenous responses to the fundamentals driving asset prices. When agents are risk-averse they need to make forecasts of the conditional variance of a stock’s return. Recursive updating of both the conditional variance and the expected return implies several mechanisms through which learning impacts stock prices. Extended periods of excess volatility, bubbles and crashes arise with a frequency that depends on the extent to which past data is discounted. A central role is played by changes over time in agents’ estimates of risk.
Resumo:
Recent literature has proved that many classical pricing models (Black and Scholes, Heston, etc.) and risk measures (V aR, CV aR, etc.) may lead to “pathological meaningless situations”, since traders can build sequences of portfolios whose risk leveltends to −infinity and whose expected return tends to +infinity, i.e., (risk = −infinity, return = +infinity). Such a sequence of strategies may be called “good deal”. This paper focuses on the risk measures V aR and CV aR and analyzes this caveat in a discrete time complete pricing model. Under quite general conditions the explicit expression of a good deal is given, and its sensitivity with respect to some possible measurement errors is provided too. We point out that a critical property is the absence of short sales. In such a case we first construct a “shadow riskless asset” (SRA) without short sales and then the good deal is given by borrowing more and more money so as to invest in the SRA. It is also shown that the SRA is interested by itself, even if there are short selling restrictions.
Resumo:
This paper proposes a particle swarm optimization (PSO) approach to support electricity producers for multiperiod optimal contract allocation. The producer risk preference is stated by a utility function (U) expressing the tradeoff between the expectation and variance of the return. Variance estimation and expected return are based on a forecasted scenario interval determined by a price range forecasting model developed by the authors. A certain confidence level is associated to each forecasted scenario interval. The proposed model makes use of contracts with physical (spot and forward) and financial (options) settlement. PSO performance was evaluated by comparing it with a genetic algorithm-based approach. This model can be used by producers in deregulated electricity markets but can easily be adapted to load serving entities and retailers. Moreover, it can easily be adapted to the use of other type of contracts.
Resumo:
This paper proposes a swarm intelligence long-term hedging tool to support electricity producers in competitive electricity markets. This tool investigates the long-term hedging opportunities available to electric power producers through the use of contracts with physical (spot and forward) and financial (options) settlement. To find the optimal portfolio the producer risk preference is stated by a utility function (U) expressing the trade-off between the expectation and the variance of the return. Variance estimation and the expected return are based on a forecasted scenario interval determined by a long-term price range forecast model, developed by the authors, whose explanation is outside the scope of this paper. The proposed tool makes use of Particle Swarm Optimization (PSO) and its performance has been evaluated by comparing it with a Genetic Algorithm (GA) based approach. To validate the risk management tool a case study, using real price historical data for mainland Spanish market, is presented to demonstrate the effectiveness of the proposed methodology.
Resumo:
Mestrado em Contabilidade e Gestão das Instituições Financeiras
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
This thesis provides a complete analysis of the Standard Capital Requirements given by Solvency II for a real insurance portfolio. We analyze the investment portfolio of BPI Vida e Pensões, an insurance company affiliated with a Portuguese bank BPI, both at security, sub-portfolio and asset class levels. By using the Standard Formula from EIOPA, Total SCR amounts to 239M€. This value is mostly explained by Market and Default Risk whereas the former is driven by Spread and Concentration Risks. Following the methodology of Leblanc (2011), we examine the Marginal Contribution of an asset to the SCR which allows for the evaluation of the risks of each security given its characteristics and interactions in the portfolio. The top contributors to the SCR are Corporate Bonds and Term Deposits. By exploring further the composition of the portfolio, our results show that slight changes in allocation of Term and Cash Deposits have severe impacts on the total Concentration and Default Risks, respectively. Also, diversification effects are very relevant by representing savings of 122M€. Finally, Solvency II represents an opportunity for the portfolio optimization. By constructing efficient frontiers, we find that as the target expected return increases, a shift from Term Deposits/ Commercial Papers to Eurozone/Peripheral and finally Equities occurs.
Resumo:
Since the financial crisis, risk based portfolio allocations have gained a great deal in popularity. This increase in popularity is primarily due to the fact that they make no assumptions as to the expected return of the assets in the portfolio. These portfolios implicitly put risk management at the heart of asset allocation and thus their recent appeal. This paper will serve as a comparison of four well-known risk based portfolio allocation methods; minimum variance, maximum diversification, inverse volatility and equally weighted risk contribution. Empirical backtests will be performed throughout rising interest rate periods from 1953 to 2015. Additionally, I will compare these portfolios to more simple allocation methods, such as equally weighted and a 60/40 asset-allocation mix. This paper will help to answer the question if these portfolios can survive in a rising interest rate environment.
Resumo:
In 2007, countries in the Euro periphery were enjoying stable growth, low deficits, and lowspreads. Then the financial crisis erupted and pushed them into deep recessions, raising theirdeficits and debt levels. By 2010, they were facing severe debt problems. Spreads increased and,surprisingly, so did the share of the debt held by domestic creditors. Credit was reallocatedfrom the private to the public sectors, reducing investment and deepening the recessions evenfurther. To account for these facts, we propose a simple model of sovereign risk in which debtcan be traded in secondary markets. The model has two key ingredients: creditor discriminationand crowding-out effects. Creditor discrimination arises because, in turbulent times, sovereigndebt offers a higher expected return to domestic creditors than to foreign ones. This providesincentives for domestic purchases of debt. Crowding-out effects arise because private borrowingis limited by financial frictions. This implies that domestic debt purchases displace productiveinvestment. The model shows that these purchases reduce growth and welfare, and may lead toself-fulfilling crises. It also shows how crowding-out effects can be transmitted to other countriesin the Eurozone, and how they may be addressed by policies at the European level.
Resumo:
The investments have always been considered as an essential backbone and so-called ‘locomotive’ for the competitive economies. However, in various countries, the state has been put under tight budget constraints for the investments in capital intensive projects. In response to this situation, the cooperation between public and private sector has grown based on public-private mechanism. The promotion of favorable arrangement for collaboration between public and private sectors for the provision of policies, services, and infrastructure in Russia can help to address the problems of dry ports development that neither municipalities nor the private sector can solve alone. Especially, the stimulation of public-private collaboration is significant under the exposure to externalities that affect the magnitude of the risks during all phases of project realization. In these circumstances, the risk in the projects also is becoming increasingly a part of joint research and risk management practice, which is viewed as a key approach, aiming to take active actions on existing global and specific factors of uncertainties. Meanwhile, a relatively little progress has been made on the inclusion of the resilience aspects into the planning process of a dry ports construction that would instruct the capacity planner, on how to mitigate the occurrence of disruptions that may lead to million dollars of losses due to the deviation of the future cash flows from the expected financial flows on the project. The current experience shows that the existing methodological base is developed fragmentary within separate steps of supply chain risk management (SCRM) processes: risk identification, risk evaluation, risk mitigation, risk monitoring and control phases. The lack of the systematic approach hinders the solution of the problem of risk management processes of dry port implementation. Therefore, management of various risks during the investments phases of dry port projects still presents a considerable challenge from the practical and theoretical points of view. In this regard, the given research became a logical continuation of fundamental research, existing in the financial models and theories (e.g., capital asset pricing model and real option theory), as well as provided a complementation for the portfolio theory. The goal of the current study is in the design of methods and models for the facilitation of dry port implementation through the mechanism of public-private partnership on the national market that implies the necessity to mitigate, first and foremost, the shortage of the investments and consequences of risks. The problem of the research was formulated on the ground of the identified contradictions. They rose as a continuation of the trade-off between the opportunities that the investors can gain from the development of terminal business in Russia (i.e. dry port implementation) and risks. As a rule, the higher the investment risk, the greater should be their expected return. However, investors have a different tolerance for the risks. That is why it would be advisable to find an optimum investment. In the given study, the optimum relates to the search for the efficient portfolio, which can provide satisfaction to the investor, depending on its degree of risk aversion. There are many theories and methods in finance, concerning investment choices. Nevertheless, the appropriateness and effectiveness of particular methods should be considered with the allowance of the specifics of the investment projects. For example, the investments in dry ports imply not only the lump sum of financial inflows, but also the long-term payback periods. As a result, capital intensity and longevity of their construction determine the necessity from investors to ensure the return on investment (profitability), along with the rapid return on investment (liquidity), without precluding the fact that the stochastic nature of the project environment is hardly described by the formula-based approach. The current theoretical base for the economic appraisals of the dry port projects more often perceives net present value (NPV) as a technique superior to other decision-making criteria. For example, the portfolio theory, which considers different risk preference of an investor and structures of utility, defines net present value as a better criterion of project appraisal than discounted payback period (DPP). Meanwhile, in business practice, the DPP is more popular. Knowing that the NPV is based on the assumptions of certainty of project life, it cannot be an accurate appraisal approach alone to determine whether or not the project should be accepted for the approval in the environment that is not without of uncertainties. In order to reflect the period or the project’s useful life that is exposed to risks due to changes in political, operational, and financial factors, the second capital budgeting criterion – discounted payback period is profoundly important, particularly for the Russian environment. Those statements represent contradictions that exist in the theory and practice of the applied science. Therefore, it would be desirable to relax the assumptions of portfolio theory and regard DPP as not fewer relevant appraisal approach for the assessment of the investment and risk measure. At the same time, the rationality of the use of both project performance criteria depends on the methods and models, with the help of which these appraisal approaches are calculated in feasibility studies. The deterministic methods cannot ensure the required precision of the results, while the stochastic models guarantee the sufficient level of the accuracy and reliability of the obtained results, providing that the risks are properly identified, evaluated, and mitigated. Otherwise, the project performance indicators may not be confirmed during the phase of project realization. For instance, the economic and political instability can result in the undoing of hard-earned gains, leading to the need for the attraction of the additional finances for the project. The sources of the alternative investments, as well as supportive mitigation strategies, can be studied during the initial phases of project development. During this period, the effectiveness of the investments undertakings can also be improved by the inclusion of the various investors, e.g. Russian Railways’ enterprises and other private companies in the dry port projects. However, the evaluation of the effectiveness of the participation of different investors in the project lack the methods and models that would permit doing the particular feasibility study, foreseeing the quantitative characteristics of risks and their mitigation strategies, which can meet the tolerance of the investors to the risks. For this reason, the research proposes a combination of Monte Carlo method, discounted cash flow technique, the theory of real options, and portfolio theory via a system dynamics simulation approach. The use of this methodology allows for comprehensive risk management process of dry port development to cover all aspects of risk identification, risk evaluation, risk mitigation, risk monitoring, and control phases. A designed system dynamics model can be recommended for the decision-makers on the dry port projects that are financed via a public-private partnership. It permits investors to make a decision appraisal based on random variables of net present value and discounted payback period, depending on different risks factors, e.g. revenue risks, land acquisition risks, traffic volume risks, construction hazards, and political risks. In this case, the statistical mean is used for the explication of the expected value of the DPP and NPV; the standard deviation is proposed as a characteristic of risks, while the elasticity coefficient is applied for rating of risks. Additionally, the risk of failure of project investments and guaranteed recoupment of capital investment can be considered with the help of the model. On the whole, the application of these modern methods of simulation creates preconditions for the controlling of the process of dry port development, i.e. making managerial changes and identifying the most stable parameters that contribute to the optimal alternative scenarios of the project realization in the uncertain environment. System dynamics model allows analyzing the interactions in the most complex mechanism of risk management process of the dry ports development and making proposals for the improvement of the effectiveness of the investments via an estimation of different risk management strategies. For the comparison and ranking of these alternatives in their order of preference to the investor, the proposed indicators of the efficiency of the investments, concerning the NPV, DPP, and coefficient of variation, can be used. Thus, rational investors, who averse to taking increased risks unless they are compensated by the commensurate increase in the expected utility of a risky prospect of dry port development, can be guided by the deduced marginal utility of investments. It is computed on the ground of the results from the system dynamics model. In conclusion, the outlined theoretical and practical implications for the management of risks, which are the key characteristics of public-private partnerships, can help analysts and planning managers in budget decision-making, substantially alleviating the effect from various risks and avoiding unnecessary cost overruns in dry port projects.
Resumo:
We present a new method for estimating the expected return of a POMDP from experience. The estimator does not assume any knowle ge of the POMDP and allows the experience to be gathered with an arbitrary set of policies. The return is estimated for any new policy of the POMDP. We motivate the estimator from function-approximation and importance sampling points-of-view and derive its theoretical properties. Although the estimator is biased, it has low variance and the bias is often irrelevant when the estimator is used for pair-wise comparisons.We conclude by extending the estimator to policies with memory and compare its performance in a greedy search algorithm to the REINFORCE algorithm showing an order of magnitude reduction in the number of trials required.
Resumo:
This paper investigates the importance of ow of funds as an implicit incentive in the asset management industry. We build a two-period bi- nomial moral hazard model to explain the trade-o¤s between ow, per- formance and fees where e¤ort depends on the combination of implicit ( ow of funds) and explicit (performance fee) incentives. Two cases are considered. With full commitment, the investor s relevant trade-o¤ is to give up expected return in the second period vis-à-vis to induce e¤ort in the rst period. The more concerned the investor is with today s pay- o¤, the more willing he will be to give up expected return in the second period by penalizing negative excess return in the rst period. Without full commitment, the investor learns some symmetric and imperfect infor- mation about the ability of the manager to obtain positive excess return. In this case, observed returns reveal ability as well as e¤ort choices. We show that powerful implicit incentives may explain the ow-performance relationship with a numerical solution. Besides, risk aversion explains the complementarity between performance fee and ow of funds.
Resumo:
A existência e o sinal do prêmio de volatilidade têm causado controvérsias dentro da literatura especializada. Este trabalho propôs, criticou e aplicou uma nova metodologia com a natalidade de testar estatisticamente a existência do prêmio de volatilidade, com as vantagens de testar para um conjunto de ações, e não para séries individuais, e de não depender de uma forma funcional específica para e relação entre o retorno e a volatilidade esperados. Os resultados da aplicação para um conjunto selecionado de ações negociadas na Bovespa foram favoráveis à existência do prêmio.