1000 resultados para Brundtland Report
Resumo:
Pós-graduação em Ciências Sociais - FFC
Resumo:
This document reports the importance of the category of consciousness and education for sustainability in the school environment. Education in school has a potential to make the benefits of the building construction visible for society and media, showing to the students, parents and communities how sustainability in built environment could improve the people life in economic, social and environment aspects. Thus, this paper addresses the main events related to sustainability, such as the Stockholm Conference, the Brundtland report, United Nations Conference on Environment and Development (UNCED) and Agenda 21, until reaching the necessity of the elaboration of Methodologies for environmental assessment of building, and later, the development of the specific methodologies according to the buildings. It is also described some examples of sustainability in schools in Germany, Finland and Italy and what kind of sustainable systems those countries are currently using.
Resumo:
Projeto de investigação integrado de International Master in Sustainable Built Environment
Resumo:
The Brundtland Report (WCED, 1987) best known for its popularisation of the concept of sustainable development, also made recommendations for a new approach to design and production, setting out terms for: ‘a production system that respects... the ecological base’ and ‘a technological system that searches continuously for new solutions’. The industrial production, consumption and waste treatment of products today causes a large amount of various environmental burdens. The development and design of new products with reduced environmental impact is one of the new challenges towards a more sustainable society and is therefore an important task in the near future.
Resumo:
Desde a publicação do livro Silent Spring, 1962, de Rachel Carson, do livro The Limits to Growth, 1972, do Clube de Roma e do impacto provocado pelo Relatório Brundtland, Our Common Future, 1987, pela World Commission on Environment and Development, que os organismos internacionais se envolvem em parcerias e assinam declarações de compromisso com a Educação Ambiental para o Desenvolvimento Sustentável – EADS. O objetivo do presente artigo é realizar uma narrativa sobre os eventos dedicados à EADS, com início na Conferência de Estocolmo até à Conferência do Rio+20. O estudo teve como base metodológica uma revisão crítica da literatura. Concluiu-se que a sociedade tomou maior consciência sobre os problemas ambientais a partir de 1970. Despontaram as primeiras respostas político-administrativas na Conferência de Estocolmo e, mais tarde, publicou-se a Informação Brundtland pela equipa interdisciplinar de experts em meio ambiente. Daqui resultaram o Tratado de Bem-estar (garantia dos direitos mínimos aos cidadãos pelo Estado) e o conceito de Desenvolvimento Sustentável. Surgiu assim a solidariedade social para com o futuro da humanidade, que implicou o princípio de “não hipotecar os recursos das gerações futuras”. Na Conferência do Rio a EADS foi plenamente aceite e divulgada pelo mundo. Todavia, com a entrada do novo milénio, a atenção dada à EADS regrediu significativamente.
Resumo:
Development of an infrastructure for Brundtland Renewable Energy Network - BREN är ettEuropean Commission Alterner Project med Contract no XVII/4. 1030/Z96-032.Projektet har sitt ursprung i UN rapporten “Our Common Future” 1989. Grundläggande för att nå de mål som rapporten föreslog var att förändra och minska användningen av energi. I Danmark tog man fram en handlingsplan för hur energiförbrukningen skulle kunna minskas “Energi 2000 - Handlingsplan för en bäredygtig udvikling”. De danska och schleswigholstenske energiministrarna överenskom att starta vars ett energisparprojekt i en mindre stad. Projektet kallades “Brundtlandby” och de två första var Toftlund i Sönderjylland och Bredstedt i Nordfriesland. Efter en kort tid anslöt sig ytterligare två tyska städer, Rheinsberg och Viernheim, samt Rajec i Slovakien. Mellan städerna formades ett nätverk för att utbyta information. Nätverket, Brundtland City Project, var inspirerande för de ingående städerna i det fortsatta arbetet med energisparåtgärder. Brundtland City Project presenterades på en internationell konferens “Cities and Energy” i Trondheim, Norge, december 1995. Projektet väckte intresse och det föreslogs att nätverket, som ett pilotprojekt, skulle utvecklas i norra Europa för att senare utökas med andra europeiska länder. En ledningsgrupp tillsattes medrepresentanter från de nordiska länderna.En ansökan sändes till European Commission, Alterner Program, och denna beviljades i juli 1996. Projektet indelades i (9 Activities. Aktivitet 1, var att sammanfatta erfarenheterna av Brundtland City Project i Toftlund, Danmark och Brundtland Cities Nätverket i Sovakien, Tyskland och Danmark. Den nordiska delen startar med Aktivitet 2, vilket var att engagera kommuner/städer i Finland, Norge och Sverige. Som samordnade för den svenska delen utsågs Solar Energy Research Center SERC vid Högskolan Dalarna. Projektet presenterades vid ett seminarium den 30 september för representanter för Borlänge och Falu kommuner. Den 10 december 1996 accepterade de två kommunerna inbjudan att ingå i det nordiska nätverket. Uppgiftslämnare i Borlänge kommun har varit Pelle Helje, Borlänge Energi och i Falu kommun Anders Goop, stadsbyggnadskontoret samt för underlag till Newsletter Jan Kaans, fastighetskontoret.Rapportering till Brundtland Center Danmark av arbetet i Borlänge och Falu kommuner har skett vid tre tillfällen, Aktiviteterna 2-5, 1997-12-16, Aktivitererna 6-7 inkluderande delar av aktiviterna 8-9, 1998-05-03 samt underlag till Newsletter, 1998-07-01. De nordiska rapporterna har sammanställts vid Brundtland Center Danmark för rapportering till European Commission. Gemensamt språk har varit engelska. Efter rapportering av aktiviterna 2 - 5 inbjöds till ett projektmöte och en studiedag vid Brundtland Center den 23 och 24 mars 1998. Det var första tillfället deltagarna i projektet strålade samman och nätverket tog därmed en mera konkret form. Man beslutade också att nästa projektmöte skulle hållas i Borlänge i augusti 1998 med Borlänge Energi och Solar Energy Research Center SERC som organisatörer. Beroende på att Brundtland Centre Danmark upplösts av ekonomiska skäl blev projektmötet i Borlänge inställt.Sammanställning av Final Report, October 1998, har utförts av Esbensen Consultants.Framtida utveckling av nätverketArbetet med Brundtland City Network avses fortsätta som ett “EU Thermie B-project” och nätverket kommer att utökas med fyra nya Brundtlandstäder från Österrike, Tyskland Italien och Storbritanien. Dessutom kommer samhället Putja i Estland att ingå i nätverket men detta financieras av EU-Phare programme.
Resumo:
Development of an infrastructure for Brundtland Renewable Energy Network - BREN is a European Commission Alterner Project with Contract no XVII/4. 1030/Z96-032.The project has its origin in the UN-report “Our Common Future”, 1989. A change in and reduction of the use of energy was fundamental in order to reach the goals which the report proposed. Denmark decided on an action plan on how energy consumption could be reduced “Energi 2000 - Handlingsplan för en bäredygtig udvikling”. The ministries of energy in Denmark and Schleswig Holstein both agreed to start an energy saving project in a smaller town. The project was called “Brundtlandby” and the two first were Toftlund in South Jutland and Bredstedt in North Friesland. After a short period a further two German Cities, Rheinsberg and Viernheim, and Rajec in Slovakia joined the group. A network for the exchange of knowledge and experience between the cities was formed. The network, Brundtland City Project, inspired the participating cities in the continuing work with energy saving measures. The Brundtland City Project was presented at an international conference “Cities and Energy” in Trondheim, Norway,in December 1995. Great interest was shown in the project and it was decided that a network should be developed in northern European countries as a pilot project to be enlarged with other European countries later on. A steering committee was formed with representatives from the nordic countries.An application was sent to the European Commission, Alterner Program, and was approved in Juli 1996. The project was subdivided into nine activities. Activity 1, consisted of summarising the experiences of the Brundtland City Project in Toftlund, Denmark and the Brundtland Cities network in Slovakia, Germany and Denmark. The Scandinavian part started with Activity 2, to engage municipalities/cities in Finland, Norway and Sweden in the project. The Solar Energy Research Center, SERC, Högskolan Dalarna was appointed as co-ordinator for the Swedish part. The project was presented at a seminar on the 30th September for representatives from the municipalities of Borlänge and Falun. On the 10th of December 1996 the two municipalities accepted the invitation to join the Northern network. Pelle Helje, Borlänge Energi, has been informant for the municipality of Borlänge and Anders Goop, Department of Urban Planninginformant for the municipality of Falun with Jan Kaans, Estates department providing information to the basis for the Newsletter.Reports on the work in Borlänge and Falun municipalities have been made to Brundtland Center Denmark on three occasions; Activities 2-5, 16-12-1997, Activities 6-7, including parts of activities 8-9, 03-03-1998, and the basis for the Newsletter, 01-07-1998. The Nordic reports have been compiled at the Brundtland Center Denmark for submission to the European Commission. English has been the common language. After the report of activities 2 - 5 the participants wereinvited to a project meeting and a workshop at Brundtland Center the 23rd and 24th March 1998.This was the first occasion the participants in the project met and the network thus took a moreconcrete form. It also was decided that the next meeting should be in Borlänge in August 1998,with Borlänge Energi and Solar Energy Research Center SERC as organisers. As BrundtlandCentre Denmark was wound up for financial reasons, the project meeting in Borlänge wascancelled.Compilation of the Final Report was carried out by Esbensen Consultants in October 1998Future development of the networkIt is intended to continue the work with the Brundtland City Network as an “EU Thermie Bproject”and the network will be enlarged with the addition of four new Brundtland Cities from Austria, Germany, Italy and Great Britain. In addition the village of Putja in Estonia will join the network but this will be financed by the EU-Phare programme.
Resumo:
Desmoid tumor (DT) is a common manifestation of Gardner's Syndrome (GS), although it is a rare condition in the general population. DT in patients with GS is usually located in the abdominal wall and/or intra-abdominal cavity. We report a case of a 32 years-old female patient with familial adenomatous polyposis (FAP), who was already submitted to total colectomy and developed multiple DT, located in the abdominal wall and in the left breast. The patient underwent several surgical procedures, with a multidisciplinary team of surgeons. Wide surgical resections of the left breast and the abdominal wall tumors were performed in separate steps. Polypropylene mesh reconstruction and muscle flaps were needed to cover the defects of the thoracic and abdominal walls. After partial necrosis of the adipose-cutaneous flap in the abdomen that required a new skin graft, she had a satisfactory outcome with complete healing of the surgical incisions. DT is frequent in GS, however, breast localization is very rare, with few cases reported in the literature. Recurrence of DT is not negligible, even after a wide surgical resection. GS patients must be followed up closely, and clinical examination, associated with imaging studies, should be performed to detect any signs of tumor. DT represents one of the most significant causes of the morbidity and mortality that affects FAP patients following colectomy. In general, the surgical procedures to excise DT are highly complex, requiring a multidisciplinary team.
Resumo:
261
Resumo:
Excessive occlusal surface wear can result in occlusal disharmony, functional and esthetic impairment. As a therapeutic approach, conventional single crowns have been proposed, but this kind of treatment is complex, highly invasive and expensive. This case report describes the clinical outcomes of an alternative minimally invasive treatment based on direct adhesive-pin retained restorations. A 64-year-old woman with severely worn dentition, eating problems related to missing teeth and generalized tooth hypersensitivity was referred for treatment. Proper treatment planning based on the diagnostic wax-up simulation was used to guide the reconstruction of maxillary anterior teeth with direct composite resin over self-threading dentin pins. As the mandibular remaining teeth were extremely worn, a tooth-supported overdenture was installed. A stabilization splint was also used to protect the restorations. This treatment was a less expensive alternative to full-mouth rehabilitation with positive esthetic and functional outcomes after 1.5 years of follow-up.
Resumo:
Thoracic injuries in general are of great importance due to their high incidence and high mortality. Thoracic impalement injuries are rare but severe due to the combination of cause, effect and result. This study's primary objective is to report the case of a young man who was impaled by a two-wheeled horse carriage shaft while crashing his motorcycle in a rural zone. An EMT-B ferry was called at the crash scene and a conscious patient was found, sustaining a severe impalement injury to the left hemithorax, suspended over the floor by the axial skeleton with the carriage shaft coming across his left chest. As a secondary objective, a literature review of thoracic impalement injuries is performed. Cases of thoracic impalement injury require unique and individualized care based on injury severity and affected organs. Reported protocols for managing impalement injuries are entirely anecdotal, with no uniformity on impaled patient's approach and management. In penetrating trauma, it is essential not to remove the impaled object, so that possible vascular lesions remain buffered by the object, avoiding major bleeding and exsanguination haemorrhage. Severed impaled thoracic patients should be transferred to a specialist centre for trauma care, as these lesions typically require complex multidisciplinary treatment. High-energy thoracic impalement injuries are rare and hold a high mortality rate, due to the complexity of trauma and associated injuries such as thoracic wall and lung lesions. Modern medicine still seems limited in cases of such seriousness, not always with satisfactory results.
Resumo:
Pituitary macroadenomas are rare intracranial tumors. In a few cases, they may present aggressive behavior and invade the sphenoid sinus and nasal cavity, causing unusual symptoms. In this paper, we report an atypical case of pituitary adenoma presenting as a nasal mass. The patient was a 44-year-old woman who had had amenorrhea and galactorrhea for ten months, with associated nasal obstruction, macroglossia and acromegaly. Both growth hormone and prolactin levels were increased. Magnetic resonance imaging showed a large mass originating from the lower surface of the pituitary gland, associated with sella turcica erosion and tumor extension through the sphenoid sinus and nasal cavity. Histopathological analysis demonstrated a chromophobe pituitary adenoma with densely packed rounded epithelial cells, with some atypias and rare mitotic figures. There was no evidence of metastases. Macroadenoma invading the nasal cavity is a rare condition and few similar cases have been reported in the literature. This study contributes towards showing that tumor extension to the sphenoid sinus and nasopharynx needs to be considered and investigated in order to make an early diagnosis when atypical symptoms like nasal obstruction are present.
Resumo:
A 46-year-old woman complained of blurred and distorted vision in both eyes. Ophthalmic examination showed that visual acuity was 20/200 for the right eye and counting fingers left eye. Fundoscopy revealed perimacular hemorrhages, aneurismal dilatation of the vessels in the posterior pole, and a white and elevated lesion adjacent to vascular changes. We report a case of idiopathic macular telangiectasia and epiretinal membrane that occurs concomitantly. To our knowledge, this is the first report that describes an association between idiopathic macular telangiectasia and epiretinal membrane formation.
Resumo:
The 2005 National Institutes of Health (NIH) Consensus Conference proposed new criteria for diagnosing and scoring the severity of chronic graft-versus-host disease (GVHD). The 2014 NIH consensus maintains the framework of the prior consensus with further refinement based on new evidence. Revisions have been made to address areas of controversy or confusion, such as the overlap chronic GVHD subcategory and the distinction between active disease and past tissue damage. Diagnostic criteria for involvement of mouth, eyes, genitalia, and lungs have been revised. Categories of chronic GVHD should be defined in ways that indicate prognosis, guide treatment, and define eligibility for clinical trials. Revisions have been made to focus attention on the causes of organ-specific abnormalities. Attribution of organ-specific abnormalities to chronic GVHD has been addressed. This paradigm shift provides greater specificity and more accurately measures the global burden of disease attributed to GVHD, and it will facilitate biomarker association studies.