11 resultados para study project
em Aston University Research Archive
Resumo:
bCHP (Biomass combined heat and power) systems are highly efficient at smaller-scales when a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost fossil fuel incumbent. The paper reviews the barriers to small-scale bCHP project development in the UK along with a case study of a failed 1.5MWel bCHP scheme. The paper offers possible explanations for the project's failure and suggests adaptations to improve the project resilience. Analysis of the project's: capital structuring contract length and bankability; feedstock type and price uncertainty, and plant oversizing highlight the negative impact of the existing project barriers on project development. The research paper concludes with a discussion on the effects of these barriers on the case study project and this industry more generally. A greater understanding of the techno-economic effects of some barriers for small-scale bCHP schemes is demonstrated within this paper, along with some methods for improving the attractiveness and resilience of projects of this kind. © 2014 Elsevier Ltd.
Resumo:
Singapore's electronics manufacturers are facing many questions. In the computer hard-drive industry, where the problem of obsolescence is common and where a product's lifecycle may be only six months, manufacturers are anxious to know what the next order-winning criteria will be. Since low labour costs are no longer a key factor, many organisations are developing their competencies in research and development, sales and marketing, logistics and supply chain management in order to maintain competitiveness. This paper illustrates how Seagate has envisaged a climate of cooperation and collaboration to better serve its customers in the areas of technology, cost and delivery. The paper is based on observations and findings following a longitudinal case study approach at the Seagate Storage Product Group (SPG) in Singapore. The seven-stage implementation framework adopted by Seagate in their SCM project is discussed, together with the process of how Seagate has created a paradigm shift towards a new culture of teamwork-based collaboration.
Resumo:
The purpose of this paper is to investigate the reasons of social impacts of projects in developing countries despite of thorough impact assessment in appraisal phase of projects. A case study approach on a sewerage project in Barbados was undertaken using primary and secondary information. The study reveals that although the impact assessment report suggested appropriate mitigation measures, but they were not implemented by the contractors. The study suggests fostering an interconnected and symbiotic relationship between appraisal and implementation phases of a project in order to manage project environment. Additionally, a more vigilant and proactive supervisory role should be instituted and strengthened over time and adapted within the dictates of environmental needs. Copyright © 2005 Inderscience Enterprises Ltd.
Resumo:
Feasibility studies of industrial projects consist of multiple analyses carried out sequentially. This is time consuming and each analysis screens out alternatives based solely on the merits of that analysis. In cross-country petroleum pipeline project selection, market analysis determines throughput requirement and supply and demand points. Technical analysis identifies technological options and alternatives for pipe-line routes. Economic and financial analysis derive the least-cost option. The impact assessment addresses environmental issues. The impact assessment often suggests alternative sites, routes, technologies, and/or implementation methodology, necessitating revision of technical and financial analysis. This report suggests an integrated approach to feasibility analysis presented as a case application of a cross-country petroleum pipeline project in India.
Resumo:
This study highlights the variables associated with the implementation of renewable energy (RE) projects for sustainable development in India, by using an interpretive structural modeling (ISM) - based approach to model variables' interactions, which impact RE adoption. These variables have been categorized under enablers that help to enhance implementation of RE projects for sustainable development. A major finding is that public awareness regarding RE for sustainable development is a very significant enabler. For successful implementation of RE projects, it has been observed that top management should focus on improving highdriving power enablers (leadership, strategic planning, public awareness, management commitment, availability of finance, government support, and support from interest groups).
Resumo:
Eight steps for projectizing continuous improvement to deliver desired change
Resumo:
This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.