62 resultados para Knowledge Sharing, Project Management, Case Study, Quantitative Analysis
em Aston University Research Archive
Resumo:
This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.
Resumo:
This research aims to contribute to understanding the implementation of knowledge management systems (KMS) in the field of health through a case study, leading to theory building and theory extension. We use the concept of the business process approach to knowledge management as a theoretical lens to analyse and explore how a large teaching hospital developed, executed and practically implemented a KMS. A qualitative study was conducted over a 2.5 year period with data collected from semi-structured interviews with eight members of the strategic management team, 12 clinical users and 20 patients in addition to non-participant observation of meetings and documents. The theoretical propositions strategy was used as the overarching approach for data analysis. Our case study provides evidence that true patient centred approaches to supporting care delivery with a KMS benefit from process thinking at both the planning and implementation stages, and an emphasis on the knowledge demands resulting from: the activities along the care pathways; where cross-overs in care occur; and knowledge sharing for the integration of care. The findings also suggest that despite the theoretical awareness of KMS implementation methodologies, the actual execution of such systems requires practice and learning. Flexible, fluid approaches through rehearsal are important and communications strategies should focus heavily on transparency incorporating both structured and unstructured communication methods.
Resumo:
This study demonstrates a quantitative approach to construction risk management through analytic hierarchy process and decision tree analysis. All the risk factors are identified, their effects are quantified by determining probability and severity, and various alternative responses are generated with cost implication for mitigating the quantified risks. The expected monetary values are then derived for each alternative in a decision tree framework and subsequent probability analysis aids the decision process in managing risks. The entire methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.
Resumo:
This study highlights the variables associated with the implementation of renewable energy (RE) projects for sustainable development in India, by using an interpretive structural modeling (ISM) - based approach to model variables' interactions, which impact RE adoption. These variables have been categorized under enablers that help to enhance implementation of RE projects for sustainable development. A major finding is that public awareness regarding RE for sustainable development is a very significant enabler. For successful implementation of RE projects, it has been observed that top management should focus on improving highdriving power enablers (leadership, strategic planning, public awareness, management commitment, availability of finance, government support, and support from interest groups).
Resumo:
The Indian petroleum industry is passing through a very dynamic business environment due to the liberalisation of many government policies, vertical integration among organisations and the presence of multinational companies. This caused a competitive environment among the organisations in the Indian petroleum industry in the public sector. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered one of the means for remaining competitive in this business environment. However, present project management practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the issues in managing projects of the organisation in the Indian petroleum sector with the involvement of the executives in a workshop environment. This also suggests some remedial measures for resolving those issues through identifying critical success factors and enablers. The enablers not only resolve the present issues but also ensure superior performance. These are analysed in a quantitative framework to derive improvement measures in project management practices.
Resumo:
Feasibility studies of industrial projects consist of multiple analyses carried out sequentially. This is time consuming and each analysis screens out alternatives based solely on the merits of that analysis. In cross-country petroleum pipeline project selection, market analysis determines throughput requirement and supply and demand points. Technical analysis identifies technological options and alternatives for pipe-line routes. Economic and financial analysis derive the least-cost option. The impact assessment addresses environmental issues. The impact assessment often suggests alternative sites, routes, technologies, and/or implementation methodology, necessitating revision of technical and financial analysis. This report suggests an integrated approach to feasibility analysis presented as a case application of a cross-country petroleum pipeline project in India.
Resumo:
Purpose - The purpose of the paper is to develop an integrated quality management model, which identifies problems, suggests solutions, develops a framework for implementation and helps evaluate performance of health care services dynamically. Design/methodology/approach - This paper uses logical framework analysis (LFA), a matrix approach to project planning for managing quality. This has been applied to three acute healthcare services (Operating room utilization, Accident and emergency, and Intensive care) in order to demonstrate its effectiveness. Findings - The paper finds that LFA is an effective method of quality management of hospital-based healthcare services. Research limitations/implications - This paper shows LFA application in three service processes in one hospital. However, ideally this is required to be tested in several hospitals and other services as well. Practical implications - In the paper the proposed model can be practised in hospital-based healthcare services for improving performance. Originality/value - The paper shows that quality improvement in healthcare services is a complex and multi-dimensional task. Although various quality management tools are routinely deployed for identifying quality issues in health care delivery and corrective measures are taken for superior performance, there is an absence of an integrated approach, which can identify and analyze issues, provide solutions to resolve those issues, develop a project management framework (planning, monitoring, and evaluating) to implement those solutions in order to improve process performance. This study introduces an integrated and uniform quality management tool. It integrates operations with organizational strategies. © Emerald Group Publishing Limited.
Resumo:
An increasing number of organisational researchers have turned to social capital theory in an attempt to better understand the impetus for knowledge sharing at the individual and organisational level. This thesis extends that research by investigating the impact of social capital on knowledge sharing at the group-level in the organisational project context. The objective of the thesis is to investigate the importance of social capital in fostering tacit knowledge sharing among the team members of a project. The analytical focus is on the Nahapiet and Ghoshal framework of social capital but also includes elements of other scholars' work. In brief, social capital is defined as an asset that is embedded in the network of relationships possessed by an individual or social unit. It is argued that the main dimensions of social capital that are of relevance to knowledge sharing are structural, cognitive, and relational because these, among other things, foster the exchange and combination of knowledge and resources among the team members. Empirically, the study is based on the grounded theory method. Data were collected from five projects in large, medium, and small ICT companies in Malaysia. Underpinned by the constant comparative method, data were derived from 55 interviews, and observations. The data were analysed using open, axial, and selective coding. The analysis also involved counting frequency occurrence from the coding generated by grounded theory to find the important items and categories under social capital dimensions and knowledge sharing, and for further explaining sub-groups within the data. The analysis shows that the most important dimension for tacit knowledge sharing is structural capital. Most importantly, the findings also suggest that structural capital is a prerequisite of cognitive capital and relational capital at the group-level in an organisational project. It also found that in a project context, relational capital is hard to realise because it requires time and frequent interactions among the team members. The findings from quantitative analysis show that frequent meetings and interactions, relationship, positions, shared visions, shared objectives, and collaboration are among the factors that foster the sharing of tacit knowledge among the team members. In conclusion, the present study adds to the existing literature on social capital in two main ways. Firstly, it distinguishes the dimensions of social capital and identifies that structural capital is the most important dimension in social capital and it is a prerequisite of cognitive and relational capital in a project context. Secondly, it identifies the causal sequence in the dimension of social capital suggesting avenues for further theoretical and empirical work in this emerging area of inquiry.
Resumo:
The need to improve the management of language learning organizations in the light of the trend toward mass higher education and of the use of English as a world language was the starting point of this thesis. The thesis aims to assess the relevance, adequacy and the relative success of Total Quality Management (TQM) as a management philosophy. Taking this empirical evidence a TQM-oriented management project in a Turkish Higher Education context, the thesis observes the consequences of a change of organizational culture, with specific reference to teachers' attitudes towards management. Both qualitative and quantitative devices are employed to plot change and the value of these devices for identifying such is considered. The main focus of the thesis is the Soft S's (Shared Values, Style, Staff and Skills) of an organization rather than the Hard S's (System, Structure, Strategy). The thesis is not concerned with the teaching and learning processes, though the PDCA cycle (the Action Research Cycle) did play a part in the project for both teachers and the researcher involved in this study of organizational development. Both before the management project was launched, and at the end of the research period, the external measurement devices (Harrison's Culture Specification Device and Hofstede's VSM) were used to describe the culture of the Centre. During the management project, internal measurement devices were used to record the change including middle-management style change (the researcher in this case). The time period chosen for this study was between September 1991 and June 1994. During this period, each device was administered twice within a specific time period, ranging from a year to 32 months.
Resumo:
Eight steps for projectizing continuous improvement to deliver desired change
Resumo:
Purpose – Traditionally, most studies focus on institutionalized management-driven actors to understand technology management innovation. The purpose of this paper is to argue that there is a need for research to study the nature and role of dissident non-institutionalized actors’ (i.e. outsourced web designers and rapid application software developers). The authors propose that through online social knowledge sharing, non-institutionalized actors’ solution-finding tensions enable technology management innovation. Design/methodology/approach – A synthesis of the literature and an analysis of the data (21 interviews) provided insights in three areas of solution-finding tensions enabling management innovation. The authors frame the analysis on the peripherally deviant work and the nature of the ways that dissident non-institutionalized actors deviate from their clients (understood as the firm) original contracted objectives. Findings – The findings provide insights into the productive role of solution-finding tensions in enabling opportunities for management service innovation. Furthermore, deviant practices that leverage non-institutionalized actors’ online social knowledge to fulfill customers’ requirements are not interpreted negatively, but as a positive willingness to proactively explore alternative paths. Research limitations/implications – The findings demonstrate the importance of dissident non-institutionalized actors in technology management innovation. However, this work is based on a single country (USA) and additional research is needed to validate and generalize the findings in other cultural and institutional settings. Originality/value – This paper provides new insights into the perceptions of dissident non-institutionalized actors in the practice of IT managerial decision making. The work departs from, but also extends, the previous literature, demonstrating that peripherally deviant work in solution-finding practice creates tensions, enabling management innovation between IT providers and users.
Resumo:
Materials management function is always a major concern to the management of any industrial organisation as high inventory and an inefficient procurement process affect the profitability to a great extent. Problems multiply due to a very current business environment in India. Hence, existing materials planning and procurement processes and inventory management systems require a re-look with respect to a changing business environment. This study shows a radical improvement in materials management function of an Indian petroleum refinery through business process re-engineering (BPR) by analysing current processes, identifying key issues, deriving paradigm shifts and developing re-engineered processes through customer value analysis. BPR has been carried out on existing processes of “materials planning and procurement” and “warehousing and surplus disposal”. The re-engineered processes for materials management function trigger a few improvement projects that were identified by the group of executives who took part in the re-engineering exercise. Those projects were implemented in an integrated framework with the application of the state of art information technology tools.
Resumo:
Purpose - The main objective of the paper is to develop a risk management framework for software development projects from developers' perspective. Design/methodology/approach - This study uses a combined qualitative and quantitative technique with the active involvement of stakeholders in order to identify, analyze and respond to risks. The entire methodology has been explained using a case study on software development project in a public sector organization in Barbados. Findings - Analytical approach to managing risk in software development ensures effective delivery of projects to clients. Research limitations/implications - The proposed risk management framework has been applied to a single case. Practical implications - Software development projects are characterized by technical complexity, market and financial uncertainties and competent manpower availability. Therefore, successful project accomplishment depends on addressing those issues throughout the project phases. Effective risk management ensures the success of projects. Originality/value - There are several studies on managing risks in software development and information technology (IT) projects. Most of the studies identify and prioritize risks through empirical research in order to suggest mitigating measures. Although they are important to clients for future projects, these studies fail to provide any framework for risk management from software developers' perspective. Although a few studies introduced framework of risk management in software development, most of them are presented from clients' perspectives and very little effort has been made to integrate this with the software development cycle. As software developers absorb considerable amount of risks, an integrated framework for managing risks in software development from developers' perspective is needed. © Emerald Group Publishing Limited.
Resumo:
The development of an information system in Caribbean public sector organisations is usually seen as a matter of installing hardware and software according to a directive from senior management, without much planning. This causes huge investment in procuring hardware and software without improving overall system performance. Increasingly, Caribbean organisations are looking for assurances on information system performance before making investment decisions not only to satisfy the funding agencies, but also to be competitive in this dynamic and global business world. This study demonstrates an information system planning approach using a process-reengineering framework. Firstly, the stakeholders for the business functions are identified along with their relationships and requirements. Secondly, process reengineering is carried out to develop the system requirements. Accordingly, information technology is selected through detailed system requirement analysis. Thirdly, cost-benefit analysis, identification of critical success factors and risk analysis are carried out to strengthen the selection. The entire methodology has been demonstrated through an information system project in the Barbados drug service, a public sector organisation in the Caribbean.