7 resultados para MIXED-INTEGER PROGRAM
em BORIS: Bern Open Repository and Information System - Berna - Suiça
Resumo:
This paper deals with “The Enchanted Journey,” which is a daily event tour booked by Bollywood-film fans. During the tour, the participants visit original sites of famous Bollywood films at various locations in Switzerland; moreover, the tour includes stops for lunch and shopping. Each day, up to five buses operate the tour. For operational reasons, however, two or more buses cannot stay at the same location simultaneously. Further operative constraints include time windows for all activities and precedence constraints between some activities. The planning problem is how to compute a feasible schedule for each bus. We implement a two-step hierarchical approach. In the first step, we minimize the total waiting time; in the second step, we minimize the total travel time of all buses. We present a basic formulation of this problem as a mixed-integer linear program. We enhance this basic formulation by symmetry-breaking constraints, which reduces the search space without loss of generality. We report on computational results obtained with the Gurobi Solver. Our numerical results show that all relevant problem instances can be solved using the basic formulation within reasonable CPU time, and that the symmetry-breaking constraints reduce that CPU time considerably.
Resumo:
The execution of a project requires resources that are generally scarce. Classical approaches to resource allocation assume that the usage of these resources by an individual project activity is constant during the execution of that activity; in practice, however, the project manager may vary resource usage over time within prescribed bounds. This variation gives rise to the project scheduling problem which consists in allocating the scarce resources to the project activities over time such that the project duration is minimized, the total number of resource units allocated equals the prescribed work content of each activity, and various work-content-related constraints are met. We formulate this problem for the first time as a mixed-integer linear program. Our computational results for a standard test set from the literature indicate that this model outperforms the state-of-the-art solution methods for this problem.
Resumo:
This paper deals with an event-bus tour booked by Bollywood film fans. During the tour, the participants visit selected locations of famous Bollywood films at various sites in Switzerland. Moreover, the tour includes stops for lunch and shopping. Each day, up to five buses operate the tour; for organizational reasons, two or more buses cannot stay at the same location simultaneously. The planning problem is how to compute a feasible schedule for each bus such that the total waiting time (primary objective) and the total travel time (secondary objective) are minimized. We formulate this problem as a mixed-integer linear program, and we report on computational results obtained with the Gurobi solver.
Resumo:
In process industries, make-and-pack production is used to produce food and beverages, chemicals, and metal products, among others. This type of production process allows the fabrication of a wide range of products in relatively small amounts using the same equipment. In this article, we consider a real-world production process (cf. Honkomp et al. 2000. The curse of reality – why process scheduling optimization problems are diffcult in practice. Computers & Chemical Engineering, 24, 323–328.) comprising sequence-dependent changeover times, multipurpose storage units with limited capacities, quarantine times, batch splitting, partial equipment connectivity, and transfer times. The planning problem consists of computing a production schedule such that a given demand of packed products is fulfilled, all technological constraints are satisfied, and the production makespan is minimised. None of the models in the literature covers all of the technological constraints that occur in such make-and-pack production processes. To close this gap, we develop an efficient mixed-integer linear programming model that is based on a continuous time domain and general-precedence variables. We propose novel types of symmetry-breaking constraints and a preprocessing procedure to improve the model performance. In an experimental analysis, we show that small- and moderate-sized instances can be solved to optimality within short CPU times.
Resumo:
Due to the ongoing trend towards increased product variety, fast-moving consumer goods such as food and beverages, pharmaceuticals, and chemicals are typically manufactured through so-called make-and-pack processes. These processes consist of a make stage, a pack stage, and intermediate storage facilities that decouple these two stages. In operations scheduling, complex technological constraints must be considered, e.g., non-identical parallel processing units, sequence-dependent changeovers, batch splitting, no-wait restrictions, material transfer times, minimum storage times, and finite storage capacity. The short-term scheduling problem is to compute a production schedule such that a given demand for products is fulfilled, all technological constraints are met, and the production makespan is minimised. A production schedule typically comprises 500–1500 operations. Due to the problem size and complexity of the technological constraints, the performance of known mixed-integer linear programming (MILP) formulations and heuristic approaches is often insufficient. We present a hybrid method consisting of three phases. First, the set of operations is divided into several subsets. Second, these subsets are iteratively scheduled using a generic and flexible MILP formulation. Third, a novel critical path-based improvement procedure is applied to the resulting schedule. We develop several strategies for the integration of the MILP model into this heuristic framework. Using these strategies, high-quality feasible solutions to large-scale instances can be obtained within reasonable CPU times using standard optimisation software. We have applied the proposed hybrid method to a set of industrial problem instances and found that the method outperforms state-of-the-art methods.
Resumo:
BACKGROUND: We sought to characterize the impact that hepatitis C virus (HCV) infection has on CD4 cells during the first 48 weeks of antiretroviral therapy (ART) in previously ART-naive human immunodeficiency virus (HIV)-infected patients. METHODS: The HIV/AIDS Drug Treatment Programme at the British Columbia Centre for Excellence in HIV/AIDS distributes all ART in this Canadian province. Eligible individuals were those whose first-ever ART included 2 nucleoside reverse transcriptase inhibitors and either a protease inhibitor or a nonnucleoside reverse transcriptase inhibitor and who had a documented positive result for HCV antibody testing. Outcomes were binary events (time to an increase of > or = 75 CD4 cells/mm3 or an increase of > or = 10% in the percentage of CD4 cells in the total T cell population [CD4 cell fraction]) and continuous repeated measures. Statistical analyses used parametric and nonparametric methods, including multivariate mixed-effects linear regression analysis and Cox proportional hazards analysis. RESULTS: Of 1186 eligible patients, 606 (51%) were positive and 580 (49%) were negative for HCV antibodies. HCV antibody-positive patients were slower to have an absolute (P<.001) and a fraction (P = .02) CD4 cell event. In adjusted Cox proportional hazards analysis (controlling for age, sex, baseline absolute CD4 cell count, baseline pVL, type of ART initiated, AIDS diagnosis at baseline, adherence to ART regimen, and number of CD4 cell measurements), HCV antibody-positive patients were less likely to have an absolute CD4 cell event (adjusted hazard ratio [AHR], 0.84 [95% confidence interval [CI], 0.72-0.98]) and somewhat less likely to have a CD4 cell fraction event (AHR, 0.89 [95% CI, 0.70-1.14]) than HCV antibody-negative patients. In multivariate mixed-effects linear regression analysis, HCV antibody-negative patients had increases of an average of 75 cells in the absolute CD4 cell count and 4.4% in the CD4 cell fraction, compared with 20 cells and 1.1% in HCV antibody-positive patients, during the first 48 weeks of ART, after adjustment for time-updated pVL, number of CD4 cell measurements, and other factors. CONCLUSION: HCV antibody-positive HIV-infected patients may have an altered immunologic response to ART.