9 resultados para India -- foreign relations

em BORIS: Bern Open Repository and Information System - Berna - Suiça


Relevância:

80.00% 80.00%

Publicador:

Resumo:

This article looks at the negotiations between Switzerland and Germany on air traffic regulation with the help of negotiation analysis tools. A number of factors pre-eminent in the literature on negotiation processes and outcomes are presented and critically assessed. In particular arguments of “power”, which are often insufficiently explored in analysing interstate cooperation, are brought back into the picture. The article argues that structural power best explains the negotiation results while domestic politics and information asymmetries both account for non-ratification of the treaty. Institutionalist arguments on the constraining effects of international norms and institutions as well as explanations focusing on negotiation skills are of minor importance. Moreover, the nature of the Swiss intra-governmental setting at the federal level did not encourage the Swiss negotiators to exploit all means during the different stages of the bargaining process. The article concludes by illuminating a number of policy observations in the broader context of Swiss foreign relations and indicating avenues for further research

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The present paper discusses a conceptual, methodological and practical framework within which the limitations of the conventional notion of natural resource management (NRM) can be overcome. NRM is understood as the application of scientific ecological knowledge to resource management. By including a consideration of the normative imperatives that arise from scientific ecological knowledge and submitting them to public scrutiny, ‘sustainable management of natural resources’ can be recontextualised as ‘sustainable governance of natural resources’. This in turn makes it possible to place the politically neutralising discourse of ‘management’ in a space for wider societal debate, in which the different actors involved can deliberate and negotiate the norms, rules and power relations related to natural resource use and sustainable development. The transformation of sustainable management into sustainable governance of natural resources can be conceptualised as a social learning process involving scientists, experts, politicians and local actors, and their corresponding scientific and non-scientific knowledges. The social learning process is the result of what Habermas has described as ‘communicative action’, in contrast to ‘strategic action’. Sustainable governance of natural resources thus requires a new space for communicative action aiming at shared, intersubjectively validated definitions of actual situations and the goals and means required for transforming current norms, rules and power relations in order to achieve sustainable development. Case studies from rural India, Bolivia and Mali explore the potentials and limitations for broadening communicative action through an intensification of social learning processes at the interface of local and external knowledge. Key factors that enable or hinder the transformation of sustainable management into sustainable governance of natural resources through social learning processes and communicative action are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Gaining economic benefits from substantially lower labor costs has been reported as a major reason for offshoring labor-intensive information systems services to low-wage countries. However, if wage differences are so high, why is there such a high level of variation in the economic success between offshored IS projects? This study argues that offshore outsourcing involves a number of extra costs for the ^his paper was recommended for acceptance by Associate Guest Editor Erran Carmel. client organization that account for the economic failure of offshore projects. The objective is to disaggregate these extra costs into their constituent parts and to explain why they differ between offshored software projects. The focus is on software development and maintenance projects that are offshored to Indian vendors. A theoretical framework is developed a priori based on transaction cost economics (TCE) and the knowledge-based view of the firm, comple mented by factors that acknowledge the specific offshore context The framework is empirically explored using a multiple case study design including six offshored software projects in a large German financial service institution. The results of our analysis indicate that the client incurs post contractual extra costs for four types of activities: (1) re quirements specification and design, (2) knowledge transfer, (3) control, and (4) coordination. In projects that require a high level of client-specific knowledge about idiosyncratic business processes and software systems, these extra costs were found to be substantially higher than in projects where more general knowledge was needed. Notably, these costs most often arose independently from the threat of oppor tunistic behavior, challenging the predominant TCE logic of market failure. Rather, the client extra costs were parti cularly high in client-specific projects because the effort for managing the consequences of the knowledge asymmetries between client and vendor was particularly high in these projects. Prior experiences of the vendor with related client projects were found to reduce the level of extra costs but could not fully offset the increase in extra costs in highly client-specific projects. Moreover, cultural and geographic distance between client and vendor as well as personnel turnover were found to increase client extra costs. Slight evidence was found, however, that the cost-increasing impact of these factors was also leveraged in projects with a high level of required client-specific knowledge (moderator effect).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The geologic structures and metamorphic zonation of the northwestern Indian Himalaya contrast significantly with those in the central and eastern parts of the range, where the high-grade metamorphic rocks of the High Himalayan Crystalline (HHC) thrust southward over the weakly metamorphosed sediments of the Lesser Himalaya along the Main Central Thrust (MCT). Indeed, the hanging wall of the MCT in the NW Himalaya mainly consists of the greenschist facies metasediments of the Chamba zone, whereas HHC high-grade rocks are exposed more internally in the range as a large-scale dome called the Gianbul dome. This Gianbul dome is bounded by two oppositely directed shear zones, the NE-dipping Zanskar Shear Zone (ZSZ) on the northern flank and the SW-dipping Miyar Shear Zone (MSZ) on the southern limb. Current models for the emplacement of the HHC in NW India as a dome structure differ mainly in terms of the roles played by both the ZSZ and the MSZ during the tectonothermal evolution of the HHC. In both the channel flow model and wedge extrusion model, the ZSZ acts as a backstop normal fault along which the high-grade metamorphic rocks of the HHC of Zanskar are exhumed. In contrast, the recently proposed tectonic wedging model argues that the ZSZ and the MSZ correspond to one single detachment system that operates as a subhorizontal backthrust off of the MCT. Thus, the kinematic evolution of the two shear zones, the ZSZ and the MSZ, and their structural, metamorphic and chronological relations appear to be diagnostic features for discriminating the different models. In this paper, structural, metamorphic and geochronological data demonstrate that the MSZ and the ZSZ experienced two distinct kinematic evolutions. As such, the data presented in this paper rule out the hypothesis that the MSZ and the ZSZ constitute one single detachment system, as postulated by the tectonic wedging model. Structural, metamorphic and geochronological data are used to present an alternative tectonic model for the large-scale doming in the NW Indian Himalaya involving early NE-directed tectonics, weakness in the upper crust, reduced erosion at the orogenic front and rapid exhumation along both the ZSZ and the MSZ.