112 resultados para workflow scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Due to the ongoing trend towards increased product variety, fast-moving consumer goods such as food and beverages, pharmaceuticals, and chemicals are typically manufactured through so-called make-and-pack processes. These processes consist of a make stage, a pack stage, and intermediate storage facilities that decouple these two stages. In operations scheduling, complex technological constraints must be considered, e.g., non-identical parallel processing units, sequence-dependent changeovers, batch splitting, no-wait restrictions, material transfer times, minimum storage times, and finite storage capacity. The short-term scheduling problem is to compute a production schedule such that a given demand for products is fulfilled, all technological constraints are met, and the production makespan is minimised. A production schedule typically comprises 500–1500 operations. Due to the problem size and complexity of the technological constraints, the performance of known mixed-integer linear programming (MILP) formulations and heuristic approaches is often insufficient. We present a hybrid method consisting of three phases. First, the set of operations is divided into several subsets. Second, these subsets are iteratively scheduled using a generic and flexible MILP formulation. Third, a novel critical path-based improvement procedure is applied to the resulting schedule. We develop several strategies for the integration of the MILP model into this heuristic framework. Using these strategies, high-quality feasible solutions to large-scale instances can be obtained within reasonable CPU times using standard optimisation software. We have applied the proposed hybrid method to a set of industrial problem instances and found that the method outperforms state-of-the-art methods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND AND PURPOSE We report on workflow and process-based performance measures and their effect on clinical outcome in Solitaire FR Thrombectomy for Acute Revascularization (STAR), a multicenter, prospective, single-arm study of Solitaire FR thrombectomy in large vessel anterior circulation stroke patients. METHODS Two hundred two patients were enrolled across 14 centers in Europe, Canada, and Australia. The following time intervals were measured: stroke onset to hospital arrival, hospital arrival to baseline imaging, baseline imaging to groin puncture, groin puncture to first stent deployment, and first stent deployment to reperfusion. Effects of time of day, general anesthesia use, and multimodal imaging on workflow were evaluated. Patient characteristics and workflow processes associated with prolonged interval times and good clinical outcome (90-day modified Rankin score, 0-2) were analyzed. RESULTS Median times were onset of stroke to hospital arrival, 123 minutes (interquartile range, 163 minutes); hospital arrival to thrombolysis in cerebral infarction (TICI) 2b/3 or final digital subtraction angiography, 133 minutes (interquartile range, 99 minutes); and baseline imaging to groin puncture, 86 minutes (interquartile range, 24 minutes). Time from baseline imaging to puncture was prolonged in patients receiving intravenous tissue-type plasminogen activator (32-minute mean delay) and when magnetic resonance-based imaging at baseline was used (18-minute mean delay). Extracranial carotid disease delayed puncture to first stent deployment time on average by 25 minutes. For each 1-hour increase in stroke onset to final digital subtraction angiography (or TICI 2b/3) time, odds of good clinical outcome decreased by 38%. CONCLUSIONS Interval times in the STAR study reflect current intra-arterial therapy for patients with acute ischemic stroke. Improving workflow metrics can further improve clinical outcome. CLINICAL TRIAL REGISTRATION: URL http://www.clinicaltrials.gov. Unique identifier: NCT01327989.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Firms aim at assigning qualified and motivated people to jobs. Human resources managers often conduct assessment centers before making such personnel decisions. By means of an assessment center, the potential and skills of job applicants can be assessed more objectively. For the scheduling of such assessment centers, we present a formulation as a mixed-binary linear program and report on computational results for four real-life examples.