8 resultados para rosin sizing
em AMS Tesi di Laurea - Alm@DL - Università di Bologna
Resumo:
The primary goal of this thesis is to verify the rupture disc sizing of the acrylic reactor. Primarily the test to check the sizing was divided into several stages. It went on to examine ideas to explain the concern and ethical ways, as well as remedies and suggestions to solve the issues and difficulties that were discovered. This thesis will highlight the gathering and arranging of reaction data (recipe composition, enthalpies, reaction temperature, and catalyst feeding times) of the products to be chosen, in accordance with pre-established criteria. To collaborate with the research and development team in the lab to carry out calorimetric testing for the important recipes that have been identified. The verification of the currently installed Rupture Discs in the plant based on the calorimetric test findings is the final stage. This thesis used two separate calorimetry techniques: Phi-TEC II adiabatic calorimetry and differential scanning calorimetry (DSC). The target of the experiment is to check and confirm the correct size of the reactor rupture disc. Arkema (Boretto/Coatex) plant (Emilia romagna) provided a recipe and a scenario following multiple meetings and discussions. The purpose of this technical paper is to describe the outcomes of adiabatic calorimetry performed at the lab scale so that the computation of the vents for a particular recipe and scenario can be verified.
Resumo:
Nella tesi si analizzano le principali fonti del rumore aeronautico, lo stato dell'arte dal punto di vista normativo, tecnologico e procedurale. Si analizza lo stato dell'arte anche riguardo alla classificazione degli aeromobili, proponendo un nuovo indice prestazionale in alternativa a quello indicato dalla metodologia di certificazione (AC36-ICAO) Allo scopo di diminuire l'impatto acustico degli aeromobili in fase di atterraggio, si analizzano col programma INM i benefici di procedure CDA a 3° rispetto alle procedure tradizionali e, di seguito di procedure CDA ad angoli maggiori in termini di riduzione di lunghezza e di area delle isofoniche SEL85, SEL80 e SEL75.
Resumo:
We need a large amount of energy to make our homes pleasantly warm in winter and cool in summer. If we also consider the energy losses that occur through roofs, perimeter walls and windows, it would be more appropriate to speak of waste than consumption. The solution would be to build passive houses, i.e. buildings more efficient and environmentally friendly, able to ensure a drastic reduction of electricity and heating bills. Recently, the increase of public awareness about global warming and environmental pollution problems have “finally” opened wide possibility in the field of sustainable construction by encouraging new renewable methods for heating and cooling space. Shallow geothermal allows to exploit the renewable heat reservoir, present in the soil at depths between 15 and 20 m, for air-conditioning of buildings, using a ground source heat pump. This thesis focuses on the design of an air-conditioning system with geothermal heat pump coupled to energy piles, i.e. piles with internal heat exchangers, for a typical Italian-family building, on the basis of a geological-technical report about a plot of Bologna’s plain provided by Geo-Net s.r.l. The study has involved a preliminary static sizing of the piles in order to calculate their length and number, then the project was completed making the energy sizing, where it has been verified if the building energy needs were met with the static solution obtained. Finally the attention was focused on the technical and economical validity compared to a traditional system (cost-benefit analysis) and on the problem of the uncertainty data design and their effects on the operating and initial costs of the system (sensitivity analysis). To evaluate the performance of the thermal system and the potential use of the piles was also used the PILESIM2 software, designed by Dr. Pahud of the SUPSI’s school.
Resumo:
Due to its practical importance and inherent complexity, the optimisation of distribution networks for supplying drinking water has been the subject of extensive study for the past 30 years. The optimization is governed by sizing the pipes in the water distribution network (WDN) and / or optimises specific parts of the network such as pumps, tanks etc. or try to analyse and optimise the reliability of a WDN. In this thesis, the author has analysed two different WDNs (Anytown City and Cabrera city networks), trying to solve and optimise a multi-objective optimisation problem (MOOP). The main two objectives in both cases were the minimisation of Energy Cost (€) or Energy consumption (kWh), along with the total Number of pump switches (TNps) during a day. For this purpose, a decision support system generator for Multi-objective optimisation used. Its name is GANetXL and has been developed by the Center of Water System in the University of Exeter. GANetXL, works by calling the EPANET hydraulic solver, each time a hydraulic analysis has been fulfilled. The main algorithm used, was a second-generation algorithm for multi-objective optimisation called NSGA_II that gave us the Pareto fronts of each configuration. The first experiment that has been carried out was the network of Anytown city. It is a big network with a pump station of four fixed speed parallel pumps that are boosting the water dynamics. The main intervention was to change these pumps to new Variable speed driven pumps (VSDPs), by installing inverters capable to diverse their velocity during the day. Hence, it’s been achieved great Energy and cost savings along with minimisation in the number of pump switches. The results of the research are thoroughly illustrated in chapter 7, with comments and a variety of graphs and different configurations. The second experiment was about the network of Cabrera city. The smaller WDN had a unique FS pump in the system. The problem was the same as far as the optimisation process was concerned, thus, the minimisation of the energy consumption and in parallel the minimisation of TNps. The same optimisation tool has been used (GANetXL).The main scope was to carry out several and different experiments regarding a vast variety of configurations, using different pump (but this time keeping the FS mode), different tank levels, different pipe diameters and different emitters coefficient. All these different modes came up with a large number of results that were compared in the chapter 8. Concluding, it should be said that the optimisation of WDNs is a very interested field that has a vast space of options to deal with. This includes a large number of algorithms to choose from, different techniques and configurations to be made and different support system generators. The researcher has to be ready to “roam” between these choices, till a satisfactory result will convince him/her that has reached a good optimisation point.
Resumo:
Viscous dampers are characterized as very effective devices applied for seismic design and retrofitting. The objective of this thesis is to apply the Five-Step Procedure ,developed by a research group in University of Bologna, for sizing the viscous dampers to be installed in an existing precast RC structure. The idea is to apply the viscous damping devices in different positions in the structure then to identify and compare the performance of all types placement position.
Resumo:
I materiali compositi possiedono proprietà funzionali e di resistenza sempre più performanti grazie alla natura dei rinforzanti in fibra di carbonio, i quali però sono caratterizzati da criticità relative al processo di trasformazione altamente energivoro e dispendioso, all’inquinamento collegato alla produzione delle fibre e al trattamento di sizing, nonché alla difficoltà nello stadio di separazione dei costituenti del manufatto composito e del conseguente riciclo. A causa di queste problematiche sono stati introdotti in produzione materiali a matrice epossidica rinforzata con fibre di lino. Lo studio è stato indirizzato verso la caratterizzazione delle materie prime che compongono i manufatti, quindi fibre e semilavorati, mediante analisi termiche dinamiche in DSC e TGA con il fine di determinare la composizione e resistenza dei singoli componenti e la misura della variazione nel comportamento quando sono uniti per comporre i prepreg. Sono state eseguite delle prove di igroscopicità, umidità e densità per ottenere una panoramica precisa sulle differenze nella struttura delle fibre in carbonio e lino che le differenzia in modo apprezzabile. Sono stati laminati compositi reticolati secondo tecnologia in autoclave, le cui proprietà sono state definite mediante prove termiche dinamiche in DSC, TGA, DMA, prove alla fiamma mediante conocalorimetro, prove fisiche di igroscopicità, umidità e densità, prove ottiche al SEM in seguito ad una rottura in trazione. Parte del progetto seguito è stato direzionato all’ottimizzazione del ciclo produttivo in autoclave. La simulazione del nuovo ciclo di cura industriale, RAPID, è stata eseguita per valutare la variazione della Tg finale e il grado di curing, nonché le proprietà termiche e meccaniche già valutate nel ciclo di cura, STANDARD.
Resumo:
Lo scopo del presente elaborato di tesi è quello di ottimizzare il recupero, tramite pirogassificazione, delle fibre di carbonio derivanti da scarti e rifiuti di materiali compositi. Inoltre è stato valutato il riutilizzo delle fibre di carbonio riciclate per la produzione di materiali compositi di seconda generazione. Sono stati investigati diversi agenti di sizing per valutare un eventuale miglioramento dell'adesione fibra-matrice. Sulle singole fibre di carbonio riciclate è stata effettuata la caratterizzazione meccanica (prove a trazione) e morfologica (SEM). Inoltre, i materiali compositi realizzati sono stati caratterizzati meccanicamente (prove a trazione, a flessione e DMA), termicamente (TGA, DSC) e morfologicamente (SEM).
Resumo:
This thesis deals with the sizing and analysis of the electrical power system of a petrochemical plant. The activity was carried out in the framework of an electrical engineering internship. The sizing and electrical calculations, as well as the study of the dynamic behavior of network quantities, are accomplished by using the ETAP (Electrical Transient Analyzer Program) software. After determining the type and size of the loads, the calculation of power flows is carried out for all possible network layout and different power supply configurations. The network is normally operated in a double radial configuration. However, the sizing must be carried out taking into account the most critical configuration, i.e., the temporary one of single radial operation, and also considering the most unfavorable power supply conditions. The calculation of shortcircuit currents is then carried out and the appropriate circuit breakers are selected. Where necessary, capacitor banks are sized in order to keep power factor at the point of common coupling within the preset limits. The grounding system is sized by using the finite element method. For loads with the highest level of criticality, UPS are sized in order to ensure their operation even in the absence of the main power supply. The main faults that can occur in the plant are examined, determining the intervention times of the protections to ensure that, in case of failure on one component, the others can still properly operate. The report concludes with the dynamic and stability analysis of the power system during island operation, in order to ensure that the two gas turbines are able to support the load even during transient conditions.