2 resultados para delays
em AMS Tesi di Laurea - Alm@DL - Università di Bologna
Resumo:
The space environment has always been one of the most challenging for communications, both at physical and network layer. Concerning the latter, the most common challenges are the lack of continuous network connectivity, very long delays and relatively frequent losses. Because of these problems, the normal TCP/IP suite protocols are hardly applicable. Moreover, in space scenarios reliability is fundamental. In fact, it is usually not tolerable to lose important information or to receive it with a very large delay because of a challenging transmission channel. In terrestrial protocols, such as TCP, reliability is obtained by means of an ARQ (Automatic Retransmission reQuest) method, which, however, has not good performance when there are long delays on the transmission channel. At physical layer, Forward Error Correction Codes (FECs), based on the insertion of redundant information, are an alternative way to assure reliability. On binary channels, when single bits are flipped because of channel noise, redundancy bits can be exploited to recover the original information. In the presence of binary erasure channels, where bits are not flipped but lost, redundancy can still be used to recover the original information. FECs codes, designed for this purpose, are usually called Erasure Codes (ECs). It is worth noting that ECs, primarily studied for binary channels, can also be used at upper layers, i.e. applied on packets instead of bits, offering a very interesting alternative to the usual ARQ methods, especially in the presence of long delays. A protocol created to add reliability to DTN networks is the Licklider Transmission Protocol (LTP), created to obtain better performance on long delay links. The aim of this thesis is the application of ECs to LTP.
Resumo:
Throughout this research, the whole life cycle of a building will be analyzed, with a special focus on the most common issues that affect the construction sector nowadays, such as safety. In fact, the goal is to enhance the management of the entire construction process in order to reduce the risk of accidents. The contemporary trend is that of researching new tools capable of reducing, or even eliminating, the most common mistakes that usually lead to safety risks. That is one of the main reasons why new technologies and tools have been introduced in the field. The one we will focus on is the so-called BIM: Building Information Modeling. With the term BIM we refer to wider and more complex analysis tool than a simple 3D modeling software. Through BIM technologies we are able to generate a multi-dimension 3D model which contains all the information about the project. This innovative approach aims at a better understanding and control of the project by taking into consideration the entire life cycle and resulting in a faster and more sustainable way of management. Furthermore, BIM software allows for the sharing of all the information among the different aspects of the project and among the different participants involved thus improving the cooperation and communication. In addition, BIM software utilizes smart tools that simulate and visualize the process in advance, thus preventing issues that might not have been taking into consideration during the design process. This leads to higher chances of avoiding risks, delays and cost increases. Using a hospital case study, we will apply this approach for the completion of a safety plan, with a special focus onto the construction phase.