4 resultados para Interoperability
em AMS Tesi di Laurea - Alm@DL - Università di Bologna
Resumo:
This dissertation document deals with the development of a project, over a span of more than two years, carried out within the scope of the Arrowhead Framework and which bears my personal contribution in several sections. The final part of the project took place during a visiting period at the university of Luleå. The Arrowhead Project is an European project, belonging to the ARTEMIS association, which aims to foster new technologies and unify the access to them into an unique framework. Such technologies include the Internet of Things phe- nomenon, Smart Houses, Electrical Mobility and renewable energy production. An application is considered compliant with such framework when it respects the Service Oriented Architecture paradigm and it is able to interact with a set of defined components called Arrowhead Core Services. My personal contribution to this project is given by the development of several user-friendly API, published in the project's main repository, and the integration of a legacy system within the Arrowhead Framework. The implementation of this legacy system was initiated by me in 2012 and, after many improvements carried out by several developers in UniBO, it has been again significantly modified this year in order to achieve compatibility. The system consists of a simulation of an urban scenario where a certain amount of electrical vehicles are traveling along their specified routes. The vehicles are con-suming their battery and, thus, need to recharge at the charging stations. The electrical vehicles need to use a reservation mechanism to be able to recharge and avoid waiting lines, due to the long recharge process. The integration with the above mentioned framework consists in the publication of the services that the system provides to the end users through the instantiation of several Arrowhead Service Producers, together with a demo Arrowhead- compliant client application able to consume such services.
Resumo:
This dissertation deals with the development of a project concerning a demonstration in the scope of the Supply Chain 6 of the Internet of Energy (IoE) project: the Remote Monitoring Emulator, which bears my personal contribution in several sections. IoE is a project of international relevance, that means to establish an interoperability standard as regards the electric power production and utilization infrastructure, using Smart Space platforms. The future perspectives of IoE have to do with a platform for electrical power trade-of, the Smart Grid, whose energy is produced by decentralized renewable sources and whose services are exploited primarily according to the Internet of Things philosophy. The main consumers of this kind of smart technology will be Smart Houses (that is to say, buildings controlled by an autonomous system for electrical energy management that is interoperable with the Smart Grid) and Electric Mobility, that is a smart and automated management regarding movement and, overall, recharging of electrical vehicles. It is precisely in the latter case study that the project Remote Monitoring Emulator takes place. It consists in the development of a simulated platform for the management of an electrical vehicle recharging in a city. My personal contribution to this project lies in development and modeling of the simulation platform, of its counterpart in a mobile application and implementation of a city service prototype. This platform shall, ultimately, make up a demonstrator system exploiting the same device which a real user, inside his vehicle, would use. The main requirements that this platform shall satisfy will be interoperability, expandability and relevance to standards, as it needs to communicate with other development groups and to effectively respond to internal changes that can affect IoE.
Resumo:
The need to effectively manage the documentation covering the entire production process, from the concept phase right through to market realise, constitutes a key issue in the creation of a successful and highly competitive product. For almost forty years the most commonly used strategies to achieve this have followed Product Lifecycle Management (PLM) guidelines. Translated into information management systems at the end of the '90s, this methodology is now widely used by companies operating all over the world in many different sectors. PLM systems and editor programs are the two principal types of software applications used by companies for their process aotomation. Editor programs allow to store in documents the information related to the production chain, while the PLM system stores and shares this information so that it can be used within the company and made it available to partners. Different software tools, which capture and store documents and information automatically in the PLM system, have been developed in recent years. One of them is the ''DirectPLM'' application, which has been developed by the Italian company ''Focus PLM''. It is designed to ensure interoperability between many editors and the Aras Innovator PLM system. In this dissertation we present ''DirectPLM2'', a new version of the previous software application DirectPLM. It has been designed and developed as prototype during the internship by Focus PLM. Its new implementation separates the abstract logic of business from the real commands implementation, previously strongly dependent on Aras Innovator. Thanks to its new design, Focus PLM can easily develop different versions of DirectPLM2, each one devised for a specific PLM system. In fact, the company can focus the development effort only on a specific set of software components which provides specialized functions interacting with that particular PLM system. This allows shorter Time-To-Market and gives the company a significant competitive advantage.
Resumo:
Throughout this research, the whole life cycle of a building will be analyzed, with a special focus on the most common issues that affect the construction sector nowadays, such as safety. In fact, the goal is to enhance the management of the entire construction process in order to reduce the risk of accidents. The contemporary trend is that of researching new tools capable of reducing, or even eliminating, the most common mistakes that usually lead to safety risks. That is one of the main reasons why new technologies and tools have been introduced in the field. The one we will focus on is the so-called BIM: Building Information Modeling. With the term BIM we refer to wider and more complex analysis tool than a simple 3D modeling software. Through BIM technologies we are able to generate a multi-dimension 3D model which contains all the information about the project. This innovative approach aims at a better understanding and control of the project by taking into consideration the entire life cycle and resulting in a faster and more sustainable way of management. Furthermore, BIM software allows for the sharing of all the information among the different aspects of the project and among the different participants involved thus improving the cooperation and communication. In addition, BIM software utilizes smart tools that simulate and visualize the process in advance, thus preventing issues that might not have been taking into consideration during the design process. This leads to higher chances of avoiding risks, delays and cost increases. Using a hospital case study, we will apply this approach for the completion of a safety plan, with a special focus onto the construction phase.