49 resultados para agile project management method
em Reposit
Resumo:
This article presents software architecture for a web-based system to aid project managing, conceptually founded on guidelines of the Project Management Body of Knowledge (PMBoK) and on ISO/IEC 9126, as well as on the result of an empiric study done in Brazil. Based on these guidelines, this study focused on two different points of view about project management: the view of those who develop software systems to aid management and the view of those who use these systems. The designed software architecture is capable of guiding an incremental development of a quality system that will satisfy today's marketing necessities, principally those of small and medium size enterprises.
Resumo:
This work describes a new web system to aid project management that was created to correct the principal deficiencies identified in systems having a common purpose which are at present available, as well as to follow the guidelines that are proposed in the Project Management Body of Knowledge (PMBoK) and the quality characteristics described in the ISO/IEC 9126 norm. As from the adopted methodology, the system was structured to attend the real necessities of project managers and also to contribute towards obtaining quality results from the projects. The validation of the proposed solution was done with the collaboration of professionals that used the functions available in it for a period of 15 days. Results attested to the quality and adequacy of the developed system.
Resumo:
A literatura sugere que o Seis Sigma trouxe contribuições sob vários aspectos, tanto no âmbito da gestão da qualidade como também da gestão estratégica. No entanto, ainda há certa escassez de informações sobre esse assunto no cenário organizacional brasileiro. Este artigo visa reduzir essa carência da literatura, mostrando uma visão prática sobre as contribuições decorrentes dos investimentos no Seis Sigma para empresas do Brasil. A relevância de requisitos essenciais - como conceito de qualidade; combinação das abordagens estatística e estratégica; sistematização metodológica; formação de especialistas; e gestão de projetos - é discutida tanto em âmbito teórico-conceitual como prático. O método do estudo de caso foi aplicado para obter o embasamento empírico da pesquisa. Os investimentos no Seis Sigma feitos por duas subsidiárias brasileiras de empresas multinacionais norte-americanas (uma de manufatura e uma de serviços) são apresentados e reforçam a relevância dos requisitos supracitados.
Resumo:
HIBISCUS is a project for studying the dynamics, microphysics and chemistry of the Tropical Tropopause Layer based on balloon measurements. Thirteen heavy sondes and 18 short duration balloons of different types have been used for local process studies. Eight superpressure (BP) and 3 Infra Red Montgolfier (MIR) long duration balloons have been flown for extending the investigations at global scale around the world. Overall the campaign has been very successful operationally as well as scientifically. The paper provides a description of the balloons, the instruments and the strategy used for meeting at best the goals of the project.
Resumo:
In businesses such as the software industry, which uses knowledge as a resource, activities are knowledge intensive, requiring constant adoption of new technologies and practices. Another feature of this environment is that the industry is particularly susceptible to failure; with this in mind, the objective of this research is to analyze the integration of Knowledge Management techniques into the activity of risk management as it applies to software development projects of micro and small Brazilian incubated technology-based firms. Research methods chosen were the Multiple Case Study. The main risk factor for managers and developers is that scope or goals are often unclear or misinterpreted. For risk management, firms have found that Knowledge Management techniques of conversion combination would be the most applicable for use; however, those most commonly used refer to the conversion mode as internalization.. © 2013 Elsevier Ltd. APM and IPMA.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Engenharia Mecânica - FEG
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Nowadays, in business environment, organizations seek to differentiate through special programs and plans, taking the concepts of sustainability, performance and benefits generated for society. Based in this competitive environment, as companies depend on the use of subcontractors to perform services for your different customers, the work performed by them is directly related to the vision created by the final customer’s vision of the company responsible for the project. Considering that the supplier hired to execute the project does not share the strategic concepts related to the level of services to be offered to the final customers, thus creating the need to develop methods that enable the alignment between the project owner, responsible for preparing the executive project, and the supplier, responsible for the execution of the work. Tangent to this need, it was necessary to create a method of evaluation and categorization for suppliers to hired for the projects. As a result it has been proposed a process of categorization of suppliers, through the restriction of possible companies to be hired for a project designed to promote alignment between strategies and continuous improvement of the solutions offered to the market
Resumo:
TFor companies to remain competitive should seek investment in the project management through new tools. The method Critical Chain has been considered an innovative way to manage projects, to promote change and give great results. However, there are still some questions to be answered and there are few papers reporting on the implementation of CCPM method in real environment of multiple projects. This work analyze the deployment process of Critical Chain at a company in the technology sector, in order to check the risk factors, advantages and difficulties in that process. Showing not only the likely benefits, but also the possible difficulties, mainly cultural and behavioral, inherent in all business transformation processes in order to support the implementation of all theoretical architecture for corporate reality
Resumo:
Pós-graduação em Engenharia de Produção - FEB
Resumo:
O manejo inadequado do solo e da água é limitante à produtividade do feijoeiro irrigado. O objetivo deste trabalho foi avaliar dois métodos de manejo da irrigação, um via solo (tensiometria) e outro via clima (tanque Classe A), conjugados com os sistemas plantio direto e convencional de manejo do solo com a cultura do feijoeiro de inverno, no segundo ano de plantio direto, em Jaboticabal - SP. Foi medido o potencial mátrico do solo e estimada a variação diária do armazenamento de água no solo, na camada de 0 a 0,40 m de profundidade, e avaliados os componentes de produtividade, além de determinadas a evapotranspiração real média e a eficiência média de uso de água pela cultura. O sistema de preparo convencional do solo com manejo de irrigação pelo tanque Classe A proporcionou maior produtividade de grãos, evapotranspiração média e eficiência de uso de água pela cultura, seguido pelo plantio direto com manejo de irrigação por tensiometria e por tanque Classe A. O sistema plantio direto foi menos suscetível às variações hídricas no solo decorrentes dos manejos de irrigação empregados do que o sistema de preparo convencional, resultando em menor variação na produtividade de grãos.
Resumo:
A cidade de Ilha Solteira está propondo o projeto Conquista da Água, visando ao desenvolvimento sustentável do Município, a partir do turismo, da cultura e da ciência e tecnologia. Para atingir esse objetivo, os planejadores do meio físico-ambiental necessitam de dados que possam auxiliá-los na seleção dos melhores locais onde serão instalados as avenidas, o aeroporto e os demais espaços que comporão esse projeto. A elaboração do mapa de uso e cobertura do solo da área de interesse do projeto constitui um dos temas necessários ao banco de dados a ser utilizado pelos planejadores. Neste trabalho, é apresentado o estado de degradação dessa área, o que auxiliará na definição das estratégias de conservação ambiental.
Resumo:
Dois métodos de manejo de irrigação, por tensiometria e pelo balanço hídrico climatológico simplificado baseado no tanque Classe A, foram aplicados e avaliados os resultados no balanço de água no solo, na evapotranspiração e na produtividade de grãos da cultura do feijoeiro, cultivar IAC-Carioca, conduzida na estação seca com irrigação por pivô central, após uma cultura de milho (estação úmida), no primeiro ano de cultivo, nos sistemas de plantio direto e convencional em uma área de Latossolo Vermelho. Concluiu-se que ambos os métodos são possíveis de serem adotados por irrigantes ou técnicos com níveis médios de tecnologia e conhecimento, embora com a tensiometria seja possível um melhor entendimento das reais condições hídricas do solo na região do sistema radicular da cultura. Não foram verificadas diferenças importantes de armazenamento de água no solo e de produtividade de grãos entre os sistemas de plantio nesse primeiro ano; o manejo por tensiometria resultou em maiores variações na água disponível consumida do que o do balanço hídrico climatológico simplificado e resultou, em relação a esse, economia de 15% na água de irrigação aplicada, sem afetar a produtividade de grãos.
Resumo:
Neste trabalho, apresenta-se um estudo sobre os principais métodos para identificar os caminhos de maior duração em redes PERT, denominados na literatura de caminhos k-críticos (quando k = 1, tem-se o caminho mais longo, conhecido tradicionalmente por caminho crítico; quando k = 2, tem-se o segundo caminho mais longo, e assim sucessivamente). São discutidos três algoritmos apresentados na literatura e propõe-se um novo procedimento, denominado algoritmo da folga mínima, que apresenta algumas vantagens sobre os anteriores. O comportamento do algoritmo da folga mínima, quando aplicado a redes PERT, é verificado por meio de simulação.