345 resultados para defeitos topológicos


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Ciência e Tecnologia de Materiais - FC

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This graduate work approaches the study of Statistical Process Control - SPC, in a stage production of an industrial frame, aiming to use the tool of statistical process control (SPC) to assess the process capability. Where the process needs improvement as well not meet the specifications. Assessing the needs that the company needs to improve quality management, and the difficulties they present during the implementation of the CEP. The present study is to use the method of case study. The results are presented through study of the level of defects using Pareto diagrams and control chart by - (p) fraction defective, and checking the capacity and stability of the process using control charts and histograms XbarraR. The process demonstrated the need for improvements in process and quality management. At the end of the work are presented suggestions for improving the quality system of the company

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Revolving machines are among the most used equipment in general industry and therefore expenditures on this equipment class are a significant portion of the total amount spent by the company. If there is an unscheduled stop of some of this equipment, industrial plants can lose huge amounts of money caused by interrupted production and parts delay. Others may increase significantly maintenance costs due to consequences elsewhere not affected before. Even plant and people safety can be in danger if there is an operation interruption without a backup system start. This work is focused on a rotating system case study which is monitored by vibration analysis that shows that is possible to determine when is the most appropriate time for equipment intervention without any reliability loss just by using a simple and cheap system which is not much used because professionals are not aware to its utility. Industrial facilities were evaluated by fail detection and historical analysis in some equipment in order to show feasibility of vibration analysis through a before-during-after process. The plant evaluated is part of a chemical multinational located in Guaratinguetá-SP. At this time, that plant had around 650 critical equipment monthly monitored and no unscheduled shutdown was registered in one year period due to equipment monitoring

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)