176 resultados para planejamento ambiental
Resumo:
This paper focuses on the implementation of a geological and geotechnical mapping to the planning of the region stream Bertini, territorial expansion area of the municipality of Americana (SP), a medium-sized city in the countryside of Sao Paulo state, with great potential for growth industrial and residential. To this end, based on the methodology established by the Institute for Technological Research, the charters geological and geotechnical aimed at exposing the capabilities and limitations of the soil. The analysis of similar soil characteristics such as geology, geomorphology, slope, geotechnical testing and the current use and land cover was possible to recognize four geotechinical units. The units I and III are related to areas of top and concave and convex parts of the study area, shown to be sites of low occupancy restriction. However the units II and IV, respectively allocated in the floodplain of the Piracicaba River and the banks of the stream Bertini and some of its drainage, showed a more restricted area due to proximity to water bodies and drainages that offer higher slopes.
Resumo:
This work is resulted of studies about the urban circulation in the modern cities. It was developed from two case studies: the city of São Paulo, specifically Santo Amaro's neighborhood and the city of Regensburg in Germany. The urban circulation of these places was analyzed starting from the premise that the daily of the inhabitants is a relevant factor to be considered. It was researched the types of transportation, the accessibility, and the clearance of public transportations. One of the main purposes of this work was to present general guidelines for the improvement urban circulation in the modern cities, as well as to supply didactic material that contribute to the reflection about urban circulation focusing priorly on the problems of traffic of driving force vehicles
Resumo:
The late industrialization, together with other factors, ended up directing much of the rural population to cities, without adequate planning, resulting in high density and irregular settlements in risk areas to low-income population. The man settled in the urban site to break environmental laws that eventually causing an imbalance in the natural environment, causing or exacerbating the shortage in availability of water resources. This situation also happened in Presidente Prudente, especially in the east, the focus of this research. Therefore, this study aims to understand the causes of degradation of waterways in urban areas, focusing on society's relationship with nature and its consequences on environmental quality and quality of life of urban population located in the watershed of stream of Gramado, Presidente Prudente - São Paulo. In this catchment there is the irregular deposition of solid waste in the valley, remnants of old pollution release of domestic sewage and industrial (currently collected and intended for treatment), accelerated processes of erosion in some areas of intensive use of the relief and consequently, the bed siltation of streams that are part of the basin. The quality of urban life was seen through socioeconomic and environmental indicators, which were identified through questionnaires to residents, according to local residence in the landscape, divided into three segments: the tops 60 residents, 90 residents and 112 residents in the areas in valley bottoms. With these data we can relate them to the degradation of the basin and aggregate them to the quality of life of residents. Field studies were needed to visualize the changes that occurred in the watershed over the past three years, with the implementation of works aimed at improvements to the community as the conduit stream of Gramado and construction and operation of Sewage Pumping Stations... (Complete abstract click electronic access below)
Resumo:
The environmental issue has been considered of fundamental importance for the well being of the present and future generations and is inserted into the commitment of political parties at federal, state and municipal government programs, into the interests of popular organizations and business planning. The Parque Ecológico Cidade da Criança is one of the most sought after places for visitation at Presidente Prudente – SP. Located outside the Raposo Tavares Highway, next to the exhibition grounds and beside the agricultural school, has more than 30 acres of area with an infrastructure designed for recreation and leisure activities for all ages and has received new investment of the public power. Given the importance of the ecological aspects, the objective of this work is to perform an environmental diagnosis in order to be able to submit proposals for solving the problems encountered and improve the use of the environmental resources. Therefore, the study was divided into three foci: sewage disposal, erosion process and control of the stormwater drainage system. It was checked the discharge of sewage from the restaurant on exposed soil, erosion processes that develop at the camel and llama cages ground and erosion processes resulting from the convergence of the stormwater in the highest region of the park. Based on these studies, proposals of solution were made for each case, having considered the effectiveness of the project
Resumo:
The minimization and mitigation of environmental impacts caused by the activities of organizations is increasingly becoming a key concern due to factors such as market demand, including suppliers and consumer markets, quality standards and even marketing strategies. The implementation of an EMS - Environmental Management System - allows the organization to achieve the level of environmental performance for its determined and promotes continuous improvement over time. This system consists of a schedule of activities, so as to eliminate or minimize impacts to the environment through preventive actions. It also provides a structured approach to set and achieve goals and objectives, and to establish procedures, work instructions and control, ensuring that the implementation of the policy can become reality. The objective of this work consists in planning a system using environmental management based on the ISO 14001 - standard internationally more widespread and accepted in the requirements to establish and operate an EMS - the Central Library, UNESP, Rio Claro / SP to stimulate the quest for continuous improvement and sustainability in the educational institution. For making the diagnosis of this planning was used the PDCA methodology, suggested by the standard, as well as all requirements for compliance. The results show that the benefits that the organization will receive involve reducing expenses and cost of energy and water, and improve the organization's reputation before the whole university and other educational institutions, reaching about three thousand people on university
Resumo:
O presente trabalho teve o intuito de resgatar o fenômeno ocorrido em agosto de 1986, no município de Cajamar, onde ocorreu o primeiro caso de formação de dolinas de subsidência e colapso no Brasil em área urbana. Mostra-se assim, através de interpretações da Fisiologia da Paisagem do local atingido, o modo que a cidade se reorganizou após o impacto, tanto na questão ambiental, como nas questões sociais e urbanas, através de entrevistas, relatando o modo de vida e as condições que se encontram a população e o local atingido neste episódio, sendo constatada então, a estabilidade do solo na área em questão
Resumo:
This work analyzes the importance of public policies in the process of urban-environmental preservation of the Alvares Machado city at state of Sao Paulo in Brazil, where priority was given to questions related to cultural heritage. Adopting the concept of territory as base to understand the complexities in the city, this work clarifies and contextualizes the historical heritage legislation through the Master Plan and the City Statute. The work also focuses on the contribution of the geographer toward studies related to urban-environmental planning.
Resumo:
Não disponível
Resumo:
Due to the large economic development associated with the growing consumerist lifestyle of our capitalist society, the problem of uncontrolled solid waste generation worsens, which one is considered to be one of the main responsible factors for environmental degradation. As a case study and in order to solve the problem of large generation of municipal solid waste, this work aims to study the “plano diretor” of Rio Claro city, São Paulo. The “plano diretor” is a municipal law that provides guidelines for the administration of the city, which include guidelines for the management of solid waste generated in the city. The guidelines required in order to write the “plano diretor” are provided by the national law “estatuto da cidade”, providing information for the planning and development of the cities, as well as the management of the urban environment. However, only the “estatuto da cidade” does not provide enough instructions for creating management plans in order to solve the many problems from the urban environment. Thus, studies have been done about urban and environmental management, to understand how municipal management plans should be structured. As a form of seeking information that can complement the “plano diretor” to the creation of policies for managing solid waste of the city, the “Política Nacional de Resíduos Sólidos”(PNRS) emerges in 2010 as a document which provides principles, objectives and guidelines to create plans for Solid Waste Management at the national, state, regional and municipal levels. Therefore, it was possible to make a joint analysis of the “plano diretor” of Rio Claro with the PNRS to identify what is already done within the municipality about the solid waste management, and identify which aspects are most significant in the municipal solid waste management that the national policy provides. Yet studies have been done on the current municipal solid waste management...
Resumo:
The new modes of production imposed by capitalism and its relentless pursuit of development triggered several impacts on the natural environment and thereby the quality of life of society. These impacts become more visible when we look the urban place. For the identification and proposal of solutions is necessary to carry out an environmental diagnosis to have knowledge of the real situation of a given area. The Presidente Bernardes city is located in West of the São Paulo State, and even being a small city has many problems resulting of the unplanned urban growth. Thus, the present work intends to conduct an environmental diagnosis of the city Presidente Bernardes-SP, through the analysis of water supply systems, sewage treatment, collection and disposal of solid waste and green areas in the urban area and if required, indicate plausible alternatives to solve any problems
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
O texto é uma nova aproximação dos autores a um tema cujo núcleo é a questão da gestão meio ambiental com enfoque na sustentabilidade. A preocupação aqui apresentada refere-se à questão da participação popular e traz alguns exemplos quanto ao protagonismo do Estado em relação ao tópico. Mostra que a legislação brasileira é atualíssima em relação ao assunto e que ela estaria em condições de lidar com as “ruínas”, com as “regressões” resultantes de uma visão de progresso que marca o processo civilizatório ocidental. Sugere a necessidade de “alargar os espaços de participação da grande massa popular nas decisões”. Reconhece, nesse quadro, a importância da mudança da realidade através da mudança do próprio sujeito da transformação. E, justo por reconhecer isso, aponta a fundamentalidade da educação ambiental. Pede ajuda a exemplos tirados de Araraquara, cidade do interior paulista para mostrar os limites e as possibilidades de avançar em um paradigma de participação popular na construção de uma sociedade sustentável.
Resumo:
The fierce competitiveness of the current market and the sophistication of customer requirements made the commitment to quality a need within organizations. The search for quality has been carried out by the adoption of quality management systems, a formal organization that should be present throughout the organization, from the initial identification of market needs to the satisfaction of customer requirements. The methodology most commonly used for this purpose is based on the requirements of ISO 9001, latest version of 2008. Considering this scenario, was developed a case study in a small company of the industrial sector with the development of a plan for the implementation of ISO 9001. The proposed methodology involved the construction of a theoretical framework on the subject and the development of a case study with a qualitative approach. Initially, was applied a questionnaire to the representative of the organization about the company's operating procedures, activity logs held, current documentation, planning and resource management for the construction of an assessment about the adequacy of the company needs to ISO 9001. Were obtained as results the characterization of production processes and organizational structure of the company and examples of policy and objectives of quality, performance indicators, document control, system for visualization of non-compliances, among others. Finally, the benefits of adopting a quality management system based on ISO 9001 requirements for the company and its environmental issues such as increased process efficiency, less waste and greater profitability, were pointed out, and the conditions for effective certification in the future
Resumo:
The contamination of the physical environment occurs as a result of the lack of planning and inadequate management of hazardous products. Due to the difficulty of the characterization and study of soil and groundwater, the contamination has been long neglected. The characterization of these areas by research techniques through direct methods such as physical and chemical analysis, are widely used in the diagnosis and monitoring. However, despite presenting quantitative results, this method is not representative in spatial terms. The purpose of this work is to bring geophysical complementation with the diagnosis, bringing the spatial element for the detection of the contamination plume. In the study area, there was a railway accident in 1999 in which three wagons fell and spilled 240,000 L of diesel onto the soil. The main objective is to assess the presence of contaminants in the residual phase and dissolved in the subsurface, using the technique of Electrical Tomography (ETR), understand the effects of natural attenuation process in the degradation of hydrocarbons and changes in electrical properties in soil and groundwater. The results allowed the definition of three distinct patterns of resistivity region with presence of dissolved phase, set in a historical chemical analyzes: low values (> 60Ω.m) associated with the presence of hydrocarbons in an advanced stage of degradation, intermediate values (260Ω.me 511Ω .m) indicative of coexistence of residual hydrocarbons and dissolved phase, and high values (> 1000Ω.m), which reveal the prevalence of residual phase with incipient degradation, possibly in high toxicity concentrations for effective action of biodegradation processes. The diagnostic of areas with potential accumulation of residual phase can subsidize the planning of remediation techniques and promote the complete decontamination of the area
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)