7 resultados para High productivity
em Universidade Federal do Rio Grande do Norte(UFRN)
Resumo:
With the high oil price variability, the petroleum and the reservoir engineers are usually face to face on how they can evaluate the well performance and productivity. They can improve high productivity from the well construction to the secondary recoveries, but they have never tried a measurement in the drilling operations about the lower productivity index. As a rule, frequently the drilling operations hear from the reservoir engineering and geology that, if there is a formation damage, probably some drilling operations practices were not done properly or the good practice in petroleum engineering or mud engineering were not observed. The study in this working search is an attempt of how to measure a formation damage just from the project drilling to the drilling operations, with datum from the fields in Brazilian northeast and putting into practice a Simulator developed from the modeling on the theory offered by different experts and sources in formation damage
Resumo:
The Electrical Submersible Pumping is an artificial lift method for oil wells employed in onshore and offshore areas. The economic revenue of the petroleum production in a well depends on the oil flow and the availability of lifting equipment. The fewer the failures, the lower the revenue shortfall and costs to repair it. The frequency with which failures occur depends on the operating conditions to which the pumps are submitted. In high-productivity offshore wells monitoring is done by operators with engineering support 24h/day, which is not economically viable for the land areas. In this context, the automation of onshore wells has clear economic advantages. This work proposes a system capable of automatically control the operation of electrical submersible pumps, installed in oil wells, by an adjustment at the electric motor rotation based on signals provided by sensors installed on the surface and subsurface, keeping the pump operating within the recommended range, closest to the well s potential. Techniques are developed to estimate unmeasured variables, enabling the automation of wells that do not have all the required sensors. The automatic adjustment, according to an algorithm that runs on a programmable logic controller maintains the flow and submergence within acceptable parameters avoiding undesirable operating conditions, as the gas interference and high engine temperature, without need to resort to stopping the engine, which would reduce the its useful life. The control strategy described, based on modeling of physical phenomena and operational experience reported in literature, is materialized in terms of a fuzzy controller based on rules, and all generated information can be accompanied by a supervisory system
Resumo:
The area of research and development involving the PID tune of controllers is an active area in the academic and industrial sectors yet. All this due to the wide use of PID controllers in the industry (96% of all controllers in the industry is still PID). Controllers well tuned and tools to monitor their performance over time with the possibility of selftuning, become an item almost obligatory to maintain processes with high productivity and low cost. In a globalized world, it is essential for their self survival. Although there are several new tools and techniques that make PID tune, in this paper will explore the PID tune using the relay method, due its good acceptance in the industrial environment. In addition, we will discuss some techniques for evaluation of control loops, as IAE, ISE, Goodhart, the variation of the control signal and index Harris, which are necessary to propose new tuning for control loops that have a low performance. Will be proposed in this paper a tool for tuning and self tuning PID. Will be proposed in this paper a PID auto-tuning software using a relay method. In particular, will be highlighted the relay method with hysteresis. This method has shown tunings with satisfactory performance when applied to the didactic, simulated and real plants
Resumo:
The rationalization of work in the Dentistry has been taking the professional to work for ways and systems based in the ergonomics, turning their work efficient and less tiring. Since their academic formation, the dentists surgeons are concerned with the high productivity in clinic and with the final result of the work, neglecting the way as it is executed, which reduce their work capacity and exhibits them to occupational diseases that could be minimized and/or forewarned. This research had as the main objective to investigate the knowledge of the Dentistry academics of Rio Grande do Norte Federal University concerning the Noise-induced Hearing Loss (NIHL), relating them at the noise levels that they are exposed, as well as to the preventive measures taken during the clinical activities. Was observed that 95% of the individuals know that the dentist surgeon is a professional in risk for NIHL. Among the causes of NIHL, the one that obtained the largest frequency citation was the high-speed handpieces, reminded by 92,4% of the academics. Among the students which enumerated protective measures for NIHL, 92% mentioned the use of the ear plugs, although 97% of the researched have told do not use any kind of preventive measure related to the noise. Was also observed that 96% of the academics notice the noise during the clinical attendance, what inconvenience 28,1% of them. Related the noise levels, the high-speed handpieces of the academics presented a medium value of 80,5 dB varying from 72,3 to 88,3 dB. The average of the ambient noise observed at the Integrated Clinic was about 74,8 dB. In spite of the noise levels in this research were observed below the established limits of tolerance by the legislation, they can provoke damages to the Dentistry professionals' health, or that suggests the need of an intervention and use of immediate preventive measures able to generate a healthy atmosphere of work and less risky
Lâminas de água salina e doses de adubação orgânica na produção de palma Miúda adensada no semiárido
Resumo:
Cactus pear is an important forage for livestock in semi-arid region of Brazil, due to its adaptation to climate conditions in this region, high productivity and nutritional value. The yield of this cactus has positively responded to techniques such as planting density, fertilization and cutting managements, however, in Rio Grande do Norte State, only certain areas have favorable climate conditions to the development of this crop. Drip irrigation, with a small amount of water, has proven to be an alternative to the viability of cactus pear cultivation in these areas. The research aimed to evaluate the effects of different levels of saline water and manure organic fertilization on the morphological characteristics and production of fresh and dry matter of the prickly-pear cactus cv. Miúda (Nopalea cochenillifera Salm Dick) in a dense planting system. The experiment was conducted at the Experimental Station of Terras Secas (EMPARN), Pedro Avelino, latitude 5°31'21" South and longitude 36°23'14" West. The soil was classified as Typical Cambisol Haplicum Carbonate and the water used in irrigation, C4S1T3 (5,25 dS.m-1), with planting spacing of 2.0 x 0.25 m (20,000 plants ha-1). A completely randomized design in a split plot was used, where water levels (0, 7.5, 15.0 and 30.0 mm month-1) with 10 days intervals, were the main plots and organic fertilization (0 , 25 and 50 Mg ha-1 yr-1) the subplots, with four replicates. The measured morphological characteristics were number of cladodes, height and volume of the plant; length, width, perimeter, thickness, area and cladodes area index, fresh and dry matter production, dry matter content, water use efficiency (WUE) and damage promoted by cochineal pest (Diaspis echinocacti) and soft rot (Erwinia carotovora). There was no influence (P>0.05) of organic fertilization on most variables, particularly in relation to the production of fresh and dry matter. The water levels had a significant influence (P<0.05) on most variables, promoting higher height and volume of the plants, larger and thicker cladodes, and increase on fresh and dry matter production (13.55 Mg DM ha-1 yr-1). The absence of irrigation caused a significant expansion in plant damage caused by the cochineal pest and when irrigated with different water levels there was an increase in damage and stand loss, caused by soft rot, been more intense at the higher water level.
Resumo:
With the high oil price variability, the petroleum and the reservoir engineers are usually face to face on how they can evaluate the well performance and productivity. They can improve high productivity from the well construction to the secondary recoveries, but they have never tried a measurement in the drilling operations about the lower productivity index. As a rule, frequently the drilling operations hear from the reservoir engineering and geology that, if there is a formation damage, probably some drilling operations practices were not done properly or the good practice in petroleum engineering or mud engineering were not observed. The study in this working search is an attempt of how to measure a formation damage just from the project drilling to the drilling operations, with datum from the fields in Brazilian northeast and putting into practice a Simulator developed from the modeling on the theory offered by different experts and sources in formation damage
Resumo:
The Electrical Submersible Pumping is an artificial lift method for oil wells employed in onshore and offshore areas. The economic revenue of the petroleum production in a well depends on the oil flow and the availability of lifting equipment. The fewer the failures, the lower the revenue shortfall and costs to repair it. The frequency with which failures occur depends on the operating conditions to which the pumps are submitted. In high-productivity offshore wells monitoring is done by operators with engineering support 24h/day, which is not economically viable for the land areas. In this context, the automation of onshore wells has clear economic advantages. This work proposes a system capable of automatically control the operation of electrical submersible pumps, installed in oil wells, by an adjustment at the electric motor rotation based on signals provided by sensors installed on the surface and subsurface, keeping the pump operating within the recommended range, closest to the well s potential. Techniques are developed to estimate unmeasured variables, enabling the automation of wells that do not have all the required sensors. The automatic adjustment, according to an algorithm that runs on a programmable logic controller maintains the flow and submergence within acceptable parameters avoiding undesirable operating conditions, as the gas interference and high engine temperature, without need to resort to stopping the engine, which would reduce the its useful life. The control strategy described, based on modeling of physical phenomena and operational experience reported in literature, is materialized in terms of a fuzzy controller based on rules, and all generated information can be accompanied by a supervisory system