51 resultados para Gerenciamento de ativos

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Nowadays wireless communication has emerged as a tendency in industry environments. In part this interest is due to the ease of deployment and maintenance, which dispenses sophisticated designs and wired infrastructure (which in industrial environment often prohibitively expensive) besides enabling the addition of new applications when compared to their wired counterparts. Despite its high degree of applicability, an industrial wireless sensor network faces some challenges. One of the most challenging problems are its reliability, energy consumption and the environment interference. In this dissertation will discuss the problem of asset analysis in wireless industrial networks for the WirelessHART standard by implementing a monitoring system. The system allows to carry out various activities of independent asset management manufacturers, such as prediction of battery life, maintenance, reliability data, topology, and the possibility of creating new metrics from open and standardized development libraries. Through the implementation of this tool is intended to contribute to integration of wireless technologies in industrial environments.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work searches to offer a model to improve spare parts stock management for companies of urban passenger transport by bus, with the consequent progress in their maintenance management. Also known as MRO items (Maintenance, Repair and Operations), these spare parts, according their consumption and demand features, cost, criticity to operation, lead-time, quantity of suppliers, among other parameters, shouldn´t have managed their inventory like normal production items (work in process e final products), that because their features, are managed by more predictable models based, for example, in economic order quantity. In the case specifically of companies of urban passenger transport by bus, items MRO have significant importance in their assets and a bad management of these inventories can cause serious losses to company, leading it even bankrupticy business, in more severe situations which missing spare part provokes vehicles shutdown indefinitely. Given slight attention to the issue, which translates in little literature available about it when compared to that literature about normal items stocks, and due the fact that MRO items be critical to bus urban transport of passengers companies´, it is necessary, so, deepen in this theme searching to give technical and scientific subsidies to companies that work, in many times, empirically, with these so decisive inputs to their business. As a typical portfolio problem, in which there are n items, separated into critical and noncritical, while competing for the same resource, it was developed a new algorithm to aid in a better inventory management of spare parts used only in corrective maintenance (whose failures are unpredictable and random), by analyzing the cost-benefit ratio, which compares the level of service versus cost of each item. The model was tested in a company of urban passenger transport by bus from the city of Natal, who anonymously provided their real data to application in this work

Relevância:

20.00% 20.00%

Publicador:

Resumo:

SILVA, Alexandre Reche e. LAUDMUS: rumo à implantação e gerenciamento de uma lista de audição musical online. In: ENCONTRO REGIONAL DA ABEM NORDESTE (Associação Brasileira de Educação Musical), 9, Natal, RN, 2010. Anais eletronicos... Natal, RN, 2010.Trabalho Completo. Disponivel em: dex.php/abemnordeste2010/about>. Acesso em: 04 out. 2010.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present study has got as its aim to show how the impressions management is being used by the hotels in Paraiba State. For that, the dramma or role play perspective has been adopted as a model for service management. From the theater metaphor, the physical environment and its components can be seen as a scenery of the service show. We conduct the reader to notice the importance of the consummer about the service quality demand and its influence on his satisfaction. A methodology with exploring and qualifying nature has been adopted by using the analyses of content technique in interviews applied to hotel managers lebeled as having 4 and 5 stars in the State, trying to check how impression management takes place, identifying impression management tools used in relation to the physical evidences and to contacting people, as well as checking managers views in the survey about the use of impression management for client satisfaction make. The information revealed that managers, maybe for being unaware about impression management theory, haven t considered neither the physical evidences yet, nor contacting people as marketing tools. About the physical evidences, we could see that hotels take actions in a pulverized way referring to environment decoration and colors, however there isn t a global usage of physical evidences to highlight the service. Contacting people by their turn, receive better importance and attention. It was possible to make sure that managers are aware about the influence of the employee over the attendance quality. This way, we may come into a conclusion that impression management at Paraiba hotels has been under used, as long as managers seem to be, most times, turned to actions related to contacting people, not having realized the planning importance and national-wide use of service scenery in a genaral way yet

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The information technology - IT- benefits have been more perceived during the last decades. Both IT and business managers are dealing with subjects like governance, IT-Business alignment, information security and others on their top priorities. Talking about governance, specifically, managers are facing it with a technical approach, that gives emphasis on protection against invasions, antivirus systems, access controls and others technical issues. The IT risk management, commonly, is faced under this approach, that means, has its importance reduced and delegated to IT Departments. On the last two decades, a new IT risk management perspective raised, bringing an holistic view of IT risk to the organization. According to this new perspective, the strategies formulation process should take into account the IT risks. With the growing of IT dependence on most of organizations, the necessity of a better comprehension about the subject becomes more clear. This work shows a study in three public organizations of the Pernambuco State that investigates how those organizations manage their IT risks. Structured interviews were made with IT managers, and later, analyzed and compared with conceptual categories found in the literature. The results shows that the IT risks culture and IT governance are weakly understood and implemented on those organizations, where there are not such an IT risk methodology formally defined, neither executed. In addition, most of practices suggested in the literature were found, even without an alignment with an IT risks management process

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Behavioral Finance develop as it is perceived anomalies in these markets efficient. This fields of study can be grouped into three major groups: heuristic bias, tying the shape and inefficient markets. The present study focuses on issues concerning the heuristics of representativeness and anchoring. This study aimed to identify the then under-reaction and over-reaction, as well as the existence of symmetry in the active first and second line of the Brazilian stock market. For this, it will be use the Fuzzy Logic and the indicators that classify groups studied from the Discriminant Analysis. The highest present, indicator in the period studied, was the Liabilities / Equity, demonstrating the importance of the moment to discriminate the assets to be considered "winners" and "losers." Note that in the MLCX biases over-reaction is concentrated in the period of financial crisis, and in the remaining periods of statistically significant biases, are obtained by sub-reactions. The latter would be in times of moderate levels of uncertainty. In the Small Caps the behavioral responses in 2005 and 2007 occur in reverse to those observed in the Mid-Large Cap. Now in times of crisis would have a marked conservatism while near the end of trading on the Bovespa speaker, accompanied by an increase of negotiations, there is an overreaction by investors. The other heuristics in SMLL occurred at the end of the period studied, this being a under-reaction and the other a over-reaction and the second occurring in a period of financial-economic more positive than the first. As regards the under / over-reactivity in both types, there is detected a predominance of either, which probably be different in the context in MLCX without crisis. For the period in which such phenomena occur in a statistically significant to note that, in most cases, such phenomena occur during the periods for MLCX while in SMLL not only biases are less present as there is no concentration of these at any time . Given the above, it is believed that while detecting the presence of bias behavior at certain times, these do not tend to appear to a specific type or heuristics and while there were some indications of a seasonal pattern in Mid- Large Caps, the same behavior does not seem to be repeated in Small Caps. The tests would then suggest that momentary failures in the Efficient Market Hypothesis when tested in semistrong form as stated by Behavioral Finance. This result confirms the theory by stating that not only rationality, but also human irrationality, is limited because it would act rationally in many circumstances

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The research aimed to evaluate the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte, on the model PMO Maturity Cube. It was based on a theoretical framework that includes project management, project management office and maturity of the project management office. The research was classified as to the purpose as exploratory and descriptive. According to the methods used was a case study, and how to approach is qualitative and quantitative. The research unit was the prosecutor of the State of Rio Grande do Norte, by two guys who represent all of the participants in the project management office of the institution. These subjects were chosen because they act with the office since the foundation of the same, having the knowledge necessary to deepen the research required, and experience with projects and work experience in the area. Data were collected through an adaptation of the evaluation form for the amplitude corporate developed and presented to the scientific environment for Pinto, Cota and Levin (2010). The results revealed that the level of maturity in the current strategic approach is 77%, and 97% desired; tactical approach in current is 66% and 97% desired, and the current operational approach is 78%, and 100% desired. He pointed out that several factors influence the level of maturity of the project management office of the Public Prosecutor and the recurrent related to information technology, regarding the storage and sharing of information. Concluded that the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte is advanced

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective is to analyze the relationship between risk and number of stocks of a portfolio for an individual investor when stocks are chosen by "naive strategy". For this, we carried out an experiment in which individuals select actions to reproduce this relationship. 126 participants were informed that the risk of first choice would be an asset average of all standard deviations of the portfolios consist of a single asset, and the same procedure should be used for portfolios composed of two, three and so on, up to 30 actions . They selected the assets they want in their portfolios without the support of a financial analysis. For comparison we also tested a hypothetical simulation of 126 investors who selected shares the same universe, through a random number generator. Thus, each real participant is compensated for random hypothetical investor facing the same opportunity. Patterns were observed in the portfolios of individual participants, characterizing the curves for the components of the samples. Because these groupings are somewhat arbitrary, it was used a more objective measure of behavior: a simple linear regression for each participant, in order to predict the variance of the portfolio depending on the number of assets. In addition, we conducted a pooled regression on all observations by analyzing cross-section. The result of pattern occurs on average but not for most individuals, many of which effectively "de-diversify" when adding seemingly random bonds. Furthermore, the results are slightly worse using a random number generator. This finding challenges the belief that only a small number of titles is necessary for diversification and shows that there is only applicable to a large sample. The implications are important since many individual investors holding few stocks in their portfolios

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work aims to analyze risks related to information technology (IT) in procedures related to data migration. This is done considering ALEPH, Integrated Libray System (ILS) that migrated data to the Library Module present in the software called Sistema Integrado de Gestão de Atividades Acadêmicas (SIGAA) at the Zila Mamede Central Library at the Federal University of Rio Grande do Norte (UFRN) in Natal/Brazil. The methodological procedure used was of a qualitative exploratory research with the realization of case study at the referred library in order to better understand this phenomenon. Data collection was able once there was use of a semi-structured interview that was applied with (11) subjects that are employed at the library as well as in the Technology Superintendence at UFRN. In order to examine data Content analysis as well as thematic review process was performed. After data migration the results of the interview were then linked to both analysis units and their system register with category correspondence. The main risks detected were: data destruction; data loss; data bank communication failure; user response delay; data inconsistency and duplicity. These elements point out implication and generate disorders that affect external and internal system users and lead to stress, work duplicity and hassles. Thus, some measures were taken related to risk management such as adequate planning, central management support, and pilot test simulations. For the advantages it has reduced of: risk, occurrence of problems and possible unforeseen costs, and allows achieving organizational objectives, among other. It is inferred therefore that the risks present in data bank conversion in libraries exist and some are predictable, however, it is seen that librarians do not know or ignore and are not very worried in the identification risks in data bank conversion, their acknowledge would minimize or even extinguish them. Another important aspect to consider is the existence of few empirical research that deal specifically with this subject and thus presenting the new of new approaches in order to promote better understanding of the matter in the corporate environment of the information units

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aims to investigate the influence of the asset class and the breakdown of tangibility as determinant factors of the capital structure of companies listed on the BM & FBOVESPA in the period of 2008-2012. Two current assets classes were composed and once they were grouped by liquidity, they were also analyzed by the financial institutions for credit granting: current resources (Cash, Bank and Financial Applications) and operations with duplicates (Stocks and Receivables). The breakdown of the tangible assets was made based on its main components provided as warrantees for loans like Machinery & Equipment and Land & Buildings. For an analysis extension, three metrics for leverage (accounting, financial and market) were applied and the sample was divided into economic sectors, adopted by BM&FBOVESPA. The data model in dynamic panel estimated by a systemic GMM of two levels was used in this study due its strength to problems of endogenous relationship as well as the omitted variables bias. The found results suggest that current resources are determinants of the capital structure possibly because they re characterized as proxies for financial solvency, being its relationship with debt positive. The sectorial analysis confirmed the results for current resources. The tangibility of assets has inverse proportional relationship with the leverage. As it is disintegrated in its main components, the significant and negative influence of machinery & equipment was more marked in the Industrial Goods sector. This result shows that, on average, the most specific assets from operating activities of a company compete for a less use of third party resources. As complementary results, it was observed that the leverage has persistence, which is linked with the static trade-off theory. Specifically for financial leverage, it was observed that the persistence is relevant when it is controlled for the lagged current assets classes variables. The proxy variable for growth opportunities, measured by the Market -to -Book, has the sign of its contradictory coefficient. The company size has a positive relationship with debt, in favor of static trade-off theory. Profitability is the most consistent variable in all the performed estimations, showing strong negative and significant relationship with leverage, as the pecking order theory predicts

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Universidade Federal do Rio Grande do Norte

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the operational context of industrial processes, alarm, by definition, is a warning to the operator that an action with limited time to run is required, while the event is a change of state information, which does not require action by the operator, therefore should not be advertised, and only stored for analysis of maintenance, incidents and used for signaling / monitoring (EEMUA, 2007). However, alarms and events are often confused and improperly configured similarly by developers of automation systems. This practice results in a high amount of pseudo-alarms during the operation of industrial processes. The high number of alarms is a major obstacle to improving operational efficiency, making it difficult to identify problems and increasing the time to respond to abnormalities. The main consequences of this scenario are the increased risk to personal safety, facilities, environment deterioration and loss of production. The aim of this paper is to present a philosophy for setting up a system of supervision and control, developed with the aim of reducing the amount of pseudo-alarms and increase reliability of the information that the system provides. A real case study was conducted in the automation system of the offshore production of hydrocarbons from Petrobras in Rio Grande do Norte, in order to validate the application of this new methodology. The work followed the premises of the tool presented in ISA SP18.2. 2009, called "life cycle alarm . After the implementation of methodology there was a significant reduction in the number of alarms

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Activities that have fuel subterranean storage system are considered potentially polluting fuels by CONAMA Resolution 273, due to the possibility of leak, outpouring and overflow of fuel into the ground. Being even more worrying when contaminate groundwater for public supply, as the case of Natal City. For this reason, the Public Ministry/RN, in partnership with UFRN, developed the project environmental suitability of Gas stations in Natal, of which 36% showed evidence of contamination. This paper describes the four stages of the management of contaminated areas: preliminary assessment of environmental liabilities, detailed confirmatory investigation of the contamination, risk analysis to human health (RBCA), as well as the remediation plan of degraded areas. Therefore it is presented a case study. For the area investigated has been proposed a mathematical method to estimate the volume of LNAPL by a free CAD software (ScketchUp) and compare it with the partition method for grid area. Were also performed 3D graphics designs of feathers contamination. Research results showed that passive benzene contamination in groundwater was 2791.77 μg/L, when the maximum allowed by CONAMA Resolution 420 is 5 μg/L which is the potability standards. The individual and cumulative risks were calculated from 4.4 x10-3, both above the limits of 1.0 x10-5 or by RBCA 1.0 x10-6 by the Public Ministry/RN. Corrective action points that remediation of dissolved phase benzene is expected to reach a concentration of 25 μg/L, based on carcinogenic risk for ingestion of groundwater by residents residential, diverging legislation. According to the proposed model, the volume of LNAPL using the ScketchUp was 17.59 m3, while by the grid partitioning method was 14.02 m3. Because of the low recovery, the expected removal of LNAPL is 11 years, if the multiphase extraction system installed in the enterprise is not optimized