8 resultados para Construtoras
em Universidade Federal do Rio Grande do Norte(UFRN)
Resumo:
According to great concern between the developed industrial activities and resultant impacts over the environment, an association of several factors have occurred, procedures to the efficient management of the rotation between economical development and the environment have been improved. A research in field have been realized inside building sites of companies in order to provide knowledge about the implemented and accomplish actions according to the resolution from CONAMA nº307. Trough the interview among the representations of the companies and photographic survey in loco, such as, what makes the companies implement this management, reutilization and recycling, transport and disposition. The present study had as objective: analyze the insertion of the used tools to residuals management, proposing improvements, in a way that it can be easily identified during the procedures execution in the building sites of the building companies of the city of Natal/RN. To reach the goal, in the first place a revision of the pertinent literature was performed; there for, it can be seen the relation between residues management and environment sustainability, once it happens in a continued way it may prevent the waste and reduces the risk that the activities way bring to the employees, community and environment; once found the great difficult faced with regard to labors, material, equipment, project, planning, costumer s interference, furnisher. And still, it could be verified wich materials generate greater indexes of residues in the works and the main occurrences of waste and loss. However a greater transparency is needed coming from the high administration in the commitment with the continued actions, to make it so, there must be a cultural change inside the company. There for there will be a greater productivity and quality of the under taking such as costumer s satisfaction
Resumo:
Surveys carried out in many Brazilian cities have shown that the CDW Construction and Demolition Waste, in some cases, represent more than 50% of the mass of urban solid residue. Municipalities have struggled to manage in an effective way huge quantities of CDW generated every day and solve the problem of the illegal dumping in an inadequate area, which compromise the quality of life of the population as a whole, thus causing serious problems concerning social-environmental and sanitary. This paperwork was meant it carry out environmental diagnosis of the management and the final destination of the CDW in the city of Parnamirim/RN. The methodology used in this work constituted in the bibliographical research, conducted to give support and fundaments to the subject in question, identification of the main places of legal and illegal dumping, identification of the environmental impacts caused by the irregular deposition of the CDW, valuation of quantity and quality of the CDW and perception according to the Environmental Legislation. The necessary data for the elaboration of this study were carried out through the appliance of questionnaires with open and closed questions, applied to 14 (fourteen) Real Estate developer companies associated with SINDUSCON/RN and 05 companies that deal with the transportation and collection of CDW, formal and informal interviews, exploitational visits and photographical records. The collected data went through a statistic treatment being organized into tables and graphs. The main results obtained from this research show that the interviewees hold a medium knowledge of the specific Environmental Legislation; do not have an effective model of environmental management, resorting to only reusing CDW; that the reusing of CDW is not substantial, as much as the possibility of recycling has a minimal consideration. It was also verified that a considerable percentage of interviewees affirmed to send CDW to illegal and inadequate locations. It is expected that such study can be used as an important tool to subsidize the public administration in the pursuit of solutions which could bring benefits to society and the environment
Resumo:
The increasing competitiveness of the construction industry, set in an economic environment in which the offer is now greater than the demand , causes the prices of many products and services, are strongly influenced by the processes of production and the final consumer. Thus, to become more competitive in the market and construction companies are seeking new alternatives to reduce and control costs, production processes and tools that allow for close monitoring of the construction schedule, with the consequent compliance deadline with the client. Based on this scenario, the creation of control tools, service management and planning work emerges as an investment opportunity and an area that can promote great benefits to construction companies. The goal of this work is to present a system of planning, service management and costs control that through worksheets provide information relating to the production phase of the work, allowing the visualization of possible irregularities in the planning and cost of the enterprise, enabling the company to take steps to achieve the goals of the enterprise in question, and correct them when necessary. The developed system has been used in a piece of real estate in Rio Grande do Norte, and the results showed that its use together allowed the construction company to accompany their results and take corrective and preventive actions during the production process, efficiently and effective
Resumo:
In Brazil the theme quality in public construction has been widely discussed in the early 1990s, with the creation of the Brazilian Program of Quality and Productivity for the Habitat (PBQP-H) which is strongly influenced by the wave of studies on issues of quality in the world, such as the ISO 9000. Over the years, other approaches have emerged and been consolidated, evolving from market and customer´s needs. An example is the Six Sigma methodology. This study aims to examine the Six Sigma, ISO 9000 and PBQP-H methodologies, noting the common elements, differences, gaps and how the methods are complementary, so that with the ongoing work, proposed initiatives can be developed to improve the quality that enables its application in public construction. Still aiming to optimize the deployment of the proposed initiatives, it was performed an analysis of ISO 9001 and PBPQ-H certifications in Brazil and in the state of Rio Grande do Norte, with respect to the construction industry and a case study to identify the factors that influence the adoption of initiatives to improve quality, and check if the selected construction company is prepared to implement the proposed initiatives. This research is characterized as exploratory and applied, with literature review and a case study. The data collection instrument was a questionnaire and the statistical analysis used a multidimensional scaling method. The conclusion is that the methodologies are compatible and complementary, and their integration could potentialize the goals set. It was identified that the state of Rio Grande do Norte has a few number of certifications in construction. Nine initiatives are proposed for implementation at construction companies. In the case study it was found that the studied company would be able to implement the suggestions proposed and the requirement for certification by clients and funding institutions influence the adoption of quality improvement initiatives. This result confirms the literature which states that top management support is crucial for the successful implementation of quality methodologies
Resumo:
The aim of this present research is to investigate about aplication of the supply chain management in Civil Construction, through perception of brasilian building companies directors. Research purpose includes potential benefits and main dificults analysis in supply chain management, beyond to identify decision criterions for suppliers and sales chain (commission agent and real state agency) choice and reduction, to facilility management in companies. The methodology used in this work considers the application of a questionnaire with scales of the type Likert being constituted of variables that compose the aspects of evaluation and of behaviors, beyond questions to identify the market profile of the respondents. For analysis statistics is used the descriptive, clusters and variance, ANOVA, analysis last two to verify the connections between variables. The results show more perception as for long terms contracts with suppliers for purchase of materials and services being decisive for companies nowadays (40%) than as for exclusive contracts with commission agents (30%). There is a positive appraisal about viability of hipotetic situations showed, but more caution as for disposition to apply them too. Another results aim for biggers dificults in management of chain links formed by commission agents and real state agencies, than chain links formed by anothers suppliers of materials and services. The companies for study were chosen among to those with ISO 9000 certificate until november 2001, considering that these companies have the best management systems, probably
Resumo:
Considered as one of the oldest activities done by men, the civil construction represents one of the most important sectors for the economic growth of a country, in spite of the low results of growth in the past few years and also in the current year. To make this industry grow, even with an unfavourable economic scenario, it is necessary to implement an effective planning in its activities. This is one of the most important concepts brought by the Lean Construction philosophy, which had its origin through the adaptation of the concepts established by the Toyota Production System (TPS) or Lean Production. By having as a scenario the city of Natal\RN, the main goal of this dissertation consists in investigating how the 11 principles of the lean construction influenced the schedule of a construction field that started to implement its lean concepts. As a methodology, it was used the case study of a big enterprise located in Natal (RN). During the execution of the method, documents related to the short-term, midterm and long-term planning were analysed , aiming to describe its planning process; it was also described the factors that caused the delays at the enterprises’ field ;in addition, a comparison was made between the results obtained at the case study and the ones presented at the literature; in the end, the actions were listed by the company, which had the purpose to solve the main causes of delays, verifying if they were linked to the lean construction principles. This research finds its reason of existence in the relevance of its theme at the nowadays reality of the construction industry, since the principles of the lean construction uphold the reduction of processes that are useless, diminishing wastes as well as costs in construction. The relevance is perceived for the academy, in terms of the possibility to discuss if the concepts established by the lean production are being adapted to the civil construction sector and how this adaptation is influencing at the buildings planning project. Economic importance, because with the reduction of the wastes and costs, the companies may reduce the building´s value into a more accessible value, even with the sector´s lower growth. And social significance, because lean construction gives a better participation of the labour at the planning activity. Among the main results, the high frequency of planning errors stands out, mainly the programming deviations and not the task programming, as well as the execution errors, low productivity and activities executed by the workers. Amongst the 11 principles of lean construction, only five were related with the 12 actions analysed by the author. From the 12 actions, four were completely cohesive to one or more from these five principles. Some improvement proposals were also highlighted and established by the research.
Resumo:
The formulation of public policies, particularly those relating to social housing – SH -, follow a dialectical process of construction, which are involved in the figures of the State and tha Market.The combination of the State and Market remains in constant tension and struggle for power, which provides beyond products (policies, programs and projects), periods of crises and disruptions that can give rise to new institutional arrangements. It is possible to verify a change in the relationship between the State and the Market in the formulation of public policies of SH financing, justified by the context of the Brazilian economy growth, especially after 2003, year that began the first Lula Federal Government , and through the international financial crisis (in 2008). Thus, the State and the Real Estate Market has been undergoing a process of redefinition of their interrelations, articulating new arrangements, new scales of action and new logics of financial valorization of urban space. This peculiarity demanded the rapid thinning of speech and the proposals in the reformulation of housing policies, with the primary result within the pre-existing Growth Acceleration Program – PAC -, the release of My House , My Life – PMCMV -, established by Law 1.977 of the year 2009. Given the above, this research has as study object the relationship between financing public policies of SH, promoted by the State, and behavior of Formal Housing Market. It is believed that the established roles for each agent in the new housing finance model introduced with the PMCMV, have been adapted according to the needs of each location to make this a workable policy. It remains to identify the nature of these adaptations, in other words, what has changed in the performance of each agent involved in this process. Knowing that private capital remains where there is more chance of profit, we tend to believe that most of the adjustments were made on scale of State action. The recommendation of easing urban legislation taken by PMCMV points to how the State has been making these changes in activity to implement the production of social housing by this program. We conclude that in the change for PMCMV, the direct relationship for construction and housing projects financing began to be made between the Caixa Econômica Federal bank and the builders. The city was liberated from the direct interlocutor role between all actors involved in the production of SH and could concentrate on negotiating with the parties, focused on the effectiveness of SH public policies proposed by PMCMV. This ability and willingness for dialogue and negotiation of municipal government (represented by their managers), undoubtedly, represents a key factor for rapprochement between State and Real Estate Market in the City of Parnamirim.
Resumo:
Nowadays lives up in an era of tight credit caused by the global financial crisis, as occurred in the past, it is the responsibility of various sectors and segments of society find ways to reinvent itself. In this context, Lean Construction presents itself as a strong alternative production management for companies in the construction segment. Arising out of lean thinking that originated in Japan in the postwar period and has spread around the world in times of extreme scarcity with the oil crisis. In practice the Lean Construction is a philosophy that seeks to improve the process of production management, maximizing the value of the flow from the customer's perspective through the elimination of losses. And thrives in environments and cultures that consider the scarcity of resources like something natural, applying both the macroeconomic crisis as in times of prosperity. The Planning and Production Control - PCP presents itself as a fundamental building block for companies to protect themselves in the face of economic fluctuations, seeking for their survival and success in the competitive market. Motivated by the lack of discussion of the topic in the local academy, and for the identification of 93.33% of construction companies that do not make use of methodological tools for PCP in the state, this dissertation aims to study and propose the implementation of lean construction in methodology of planning projects implemented on construction sites. This characterized the management system, of the production of a construction company, pointing out the main causes of ineffectiveness related to consequent low performance of one of his ventures. In sequence, the PCP was implemented with the use of tools to serve the principles of lean construction. This being monitored through indicators that provided managers managerial view of process of actions control and production of protective mechanisms. All implementation guidelines and application of this management model, were exposed in a simplified way, practical and efficient, in order to break the resistance of new practices and old paradigms in the industry.