18 resultados para Busbar sizing
em Universidade Federal do Rio Grande do Norte(UFRN)
Resumo:
This work deals with teacher-student relationship (TSR), held in a very special moment: the semester of graduation of architecture and urbanism, where students prepare the final work called Graduation Final Work (GFW). That is the last stage to obtain the title of architect and urban planner in Brazil. The text discusses this problem in several ways, emphasing the relationship between graduated student and his/her mentors into the consolidation process of the student as an actor of the planning process, here defined as "autonomy". The work is focused on understanding the TSR in order to elucidate its importance for improvement of teaching bases on development of the GFW, more than the relation between curriculum and institution. Related with the exploratory characteristic of this master thesis, methodologically, the field work happened through: (i) observation of mentorship guidance, (ii) interviews, and (iii) application of questionnaires to teachers and students. Participated 10 pairs of student and mentors of two federal university of Northeast: 05 pairs of the Federal University of Ceará (UFC) and 05 pairs of the Federal University of Rio Grande do Norte (UFRN). The results presented the development of the GFW as a difficult process / fearful for students, highlighting the main problem situations: the difficulty in choosing the theme, the super-sizing of the process, students' insecurities, and parental relationship with the supervisor process. Summing up, the work indicates that the students has a limited autonomy on the GFW process, which calls for a revision in order to promote the consolidation of the student autonomy, which must be observed for some positions recognition of the role of each actor in the process of orientation
Resumo:
The dielectric porcelain is usually obtained by mixing various raw materials proportions and is used in the production of electronic equipment for various applications, from capacitors of high and low Power to insulators for low, medium, high and extra high voltage, which are used in distribution lines and transmission of electricity.This work was directed to the s tudy of technological properties of technic porcelain, made from raw materials extracted from pegmatites found in the regions of Seridó and the Alto Oeste of Rio Grande do Norte, which are made of kaolin, quartz and feldspar, abundant and high quality in these regions. The technic ceramics were obtained by mixing in appropriate levels, kaolin, feldspar, quartz and clay, the last item from a pottery in the city of Sao Gonçalo do Amarante, Rio Grande do Norte. During the development the following characterizations correlated to raw materials were made: laser particle sizing, x-ray diffraction, DTA and TG. The compositions studied were formed by uniaxial pressing at a pressure of 50 MPa and sintered at temperatures ranging from 1150 to 1350ºC and levels (times) of sintering between 30, 60, 90 and 120 minutes. The characterization of the samples were taken from the analysis of weight loss, linear shrinkage, porosity, stoneware curve, bulk density, flexural strength of three points, SEM and X-ray diffraction, TMA, Dielectric and cross Resistivity. The studied materials can be employed in producing the objects used in electrical engineering such as: insulators for low, medium and high-voltage electrical systems, command devices, bushing insulation for transformers, power capacitors, spark plugs, receptacles for fluorescent and incandescent light bulbs and others
Resumo:
It is a descriptive, exploratory study, quantitative comparative approach, whose general objective was to analyze the violence at school in a comparative way in the context of two schools in Natal / RN. The specifics were to identify the types of manifestations of violence in the contexts of public and private schools, to identify the position of the leadership, teachers and school staff during and after the occurrence of manifestations of violence in the school environment, to identify measures to prevent violence within of schools. The results show that 68 of the 121 participants (56.20%) were female and 53 (43.80%) were male, 38 (31.40%) were between 40 and 49, 85 (70.2%) lived in the south of Natal (RN), 46 (38.02%) specialization, 68 (56.20%) were Catholic, 63 (52.07%) married, 41 (33.88%) received between 03 and 05 and 68 minimum wages (56.20%) were teachers, 51 (42.15%) 02 employees (01,65%) and directors, 46 (38.02%) providers had between 05 and 14 years and 11 months experience in teaching 70 (57.85%) less than five years in the job, 68 (56.20%) worked between 20 hours and 40 hours per week, 81 (16.30%) worked in the 9th grade of elementary school II. As for the sizing of violence, 111 (91.74%) respondents witnessed episodes of this event who work in the institution, 100 (82.64%) witnessed verbal violence, 87 (71.90%) called for parents when some event happenedviolent that it caused injury to students, 66 (54.55%) believed that family violence is the main reason for young people practiced bullying, 44 (38.98%) reported daily episodes of bullying, 64 (52.89% ) the event happens in the courtyard. Of the 37 victims of violence at school, 22 (59.45%) suffered verbal abuse, 18 (48.65%) experienced violence once a week, 36 (97.30%) were attacked by students, 104 (85.95 %) are able to differentiate the bad acts of bullying behavior, 28 (23.14%) separated the involved coordination and communicated verbally, 23 (19.00%) stated that the coordination of schools talked with parents about the aggressive behavior of the student. Regarding the actions taken to minimize bullying, 69 (57.02%) participated in any professional education process, 47 (38.84%) was the educational process at another institution, 49 (71.01%) took courses lasting 12 to 24 hours, 59 (48.76%) stated that interaction with parents and family was the most stimulated by the school to try to minimize and prevent the event and 116 (95.87%) participated in meetings at the institutions surveyed , 58 (50.00%) responded that the meetings took place every two months and 121 (100.00%) reported having no refresher course on school violence in the schools surveyed. We conclude that violence in schools has been expressed in any social class and that professionals are poorly prepared to deal with the situation. So we hope that education professionals through the reading of our study may realize that school violence takes place in any institution affecting the lives of all who make up the educational universe. It is extremely important that these professionals always seek to empower through knowledge so that they can develop strategies to prevent and minimize the bullying to change the reality of the workplace
Resumo:
The importance of the airport sector in the development of a country refers to the need for studies on management of airports, to aid the process of decision making. In Brazil, growth in passenger demand is why investments in order to balance the capacity of an airport with air demand. Thus, the study aims to develop a model for Dynamic Systems able to assist airport management in Brazilian sizing subsystems an airport (Passenger Terminal, Runway and Patio). The methodology of this work consists in the steps of defining the problem, formulating the hypothesis dynamic building simulation model, and validation experiments. Finally, we examined the status of each subsystem in thirteen Brazilian airports in scenarios current, most likely and optimistic for air passenger demand
Resumo:
The progressing cavity pump artificial lift system, PCP, is a main lift system used in oil production industry. As this artificial lift application grows the knowledge of it s dynamics behavior, the application of automatic control and the developing of equipment selection design specialist systems are more useful. This work presents tools for dynamic analysis, control technics and a specialist system for selecting lift equipments for this artificial lift technology. The PCP artificial lift system consists of a progressing cavity pump installed downhole in the production tubing edge. The pump consists of two parts, a stator and a rotor, and is set in motion by the rotation of the rotor transmitted through a rod string installed in the tubing. The surface equipment generates and transmits the rotation to the rod string. First, is presented the developing of a complete mathematical dynamic model of PCP system. This model is simplified for use in several conditions, including steady state for sizing PCP equipments, like pump, rod string and drive head. This model is used to implement a computer simulator able to help in system analysis and to operates as a well with a controller and allows testing and developing of control algorithms. The next developing applies control technics to PCP system to optimize pumping velocity to achieve productivity and durability of downhole components. The mathematical model is linearized to apply conventional control technics including observability and controllability of the system and develop design rules for PI controller. Stability conditions are stated for operation point of the system. A fuzzy rule-based control system are developed from a PI controller using a inference machine based on Mandami operators. The fuzzy logic is applied to develop a specialist system that selects PCP equipments too. The developed technics to simulate and the linearized model was used in an actual well where a control system is installed. This control system consists of a pump intake pressure sensor, an industrial controller and a variable speed drive. The PI control was applied and fuzzy controller was applied to optimize simulated and actual well operation and the results was compared. The simulated and actual open loop response was compared to validate simulation. A case study was accomplished to validate equipment selection specialist system
Resumo:
The purpose of this study was to develop a pilot plant which the main goal is to emulate a flow peak pressure in a separation vessel. Effect similar that is caused by the production in a slug flow in production wells equipped with the artificial lift method plunger lift. The motivation for its development was the need to test in a plant on a smaller scale, a new technique developed to estimate the gas flow in production wells equipped with plunger lift. To develop it, studies about multiphase flow effects, operation methods of artificial lift in plunger lift wells, industrial instrumentation elements, control valves, vessel sizing separators and measurement systems were done. The methodology used was the definition of process flowcharts, its parameters and how the effects needed would be generated for the success of the experiments. Therefore, control valves, the design and construction of vessels and the acquisition of other equipment used were defined. One of the vessels works as a tank of compressed air that is connected to the separation vessel and generates pulses of gas controlled by a on/off valve. With the emulator system ready, several control experiments were made, being the control of peak flow pressure generation and the flow meter the main experiments, this way, it was confirmed the efficiency of the plant usage in the problem that motivated it. It was concluded that the system is capable of generate effects of flow with peak pressure in a primary separation vessel. Studies such as the estimation of gas flow at the exit of the vessel and several academic studies can be done and tested on a smaller scale and then applied in real plants, avoiding waste of time and money.
Resumo:
This work deals with the development of an experimental study on a power supply of high frequency that provides the toch plasmica to be implemented in PLASPETRO project, which consists of two static converters developed by using Insulated Gate Bipolar Transistor (IGBT). The drivers used to control these keys are triggered by Digital Signal Processor (DSP) through optical fibers to reduce problems with electromagnetic interference (EMI). The first stage consists of a pre-regulator in the form of an AC to DC converter with three-phase boost power factor correction which is the main theme of this work, while the second is the source of high frequency itself. A series-resonant inverter consists of four (4) cell inverters operating in a frequency around 115 kHz each one in soft switching mode, alternating itself to supply the load (plasma torch) an alternating current with a frequency of 450 kHz. The first stage has the function of providing the series-resonant inverter a DC voltage, with the value controlled from the power supply provided by the electrical system of the utility, and correct the power factor of the system as a whole. This level of DC bus voltage at the output of the first stage will be used to control the power transferred by the inverter to the load, and it may vary from 550 VDC to a maximum of 800 VDC. To control the voltage level of DC bus driver used a proportional integral (PI) controller and to achieve the unity power factor it was used two other proportional integral currents controllers. Computational simulations were performed to assist in sizing and forecasting performance. All the control and communications needed to stage supervisory were implemented on a DSP
Resumo:
This work purposes the application of a methodology to optimize the implantation cost of an wind-solar hybrid system for oil pumping. The developed model is estimated the implantation cost of system through Multiple Linear Regression technique, on the basis of the previous knowledge of variables: necessary capacity of storage, total daily energy demand, wind power, module power and module number. These variables are gotten by means of sizing. The considered model not only can be applied to the oil pumping, but also for any other purposes of electric energy generation for conversion of solar, wind or solar-wind energy, that demand short powers. Parametric statistical T-student tests had been used to detect the significant difference in the average of total cost to being considered the diameter of the wind, F by Snedecor in the variance analysis to test if the coefficients of the considered model are significantly different of zero and test not-parametric statistical by Friedman, toverify if there is difference in the system cost, by being considered the photovoltaic module powers. In decision of hypothesis tests was considered a 5%-significant level. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 3 HP. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 5 HP only to wind speed of 4m/s and 6 m/s in wind of 3 m, 4m and 5 m of diameter. There was not significant difference in costs to diameters of winds of 3 m and 4m. The mathematical model and the computational program may be used to others applications which require electrical between 2.250 W and 3.750 W. A computational program was developed to assist the study of several configurations that optimizes the implantation cost of an wind-solar system through considered mathematical model
Resumo:
This paper presents an analysis of technical and financial feasibility of the use of a solar system for water heating in a fictitious hotel located in the Northeast region. Thereunto it is used techniques of solar collectors´ sizing and methods of financial mathematics, such as Net Present Value (NPV), Internal Rate of Return (IRR) and Payback. It will also be presented a sensitivity analysis to verify which are the factors that impact the viability of the solar heating. Comparative analysis will be used concerning three cities of distinct regions of Brazil: Curitiba, Belém and João Pessoa. The viability of using a solar heating system will be demonstrated to the whole Brazil, especially to the northeast region as it is the most viable for such an application of solar power because of its high levels of solar radiation. Among the cities examined for a future installation of solar heating systems for water heating in the hotel chain, João Pessoa was the one that has proved more viable.
Resumo:
Ensure the integrity of the pipeline network is an extremely important factor in the oil and gas industry. The engineering of pipelines uses sophisticated robotic inspection tools in-line known as instrumented pigs. Several relevant factors difficult the inspection of pipelines, especially in offshore field which uses pipelines with multi-diameters, radii of curvature accentuated, wall thickness of the pipe above the conventional, multi-phase flow and so on. Within this context, appeared a new instrumented Pig, called Feeler PIG, for detection and sizing of thickness loss in pipelines with internal damage. This tool was developed to overcome several limitations that other conventional instrumented pigs have during the inspection. Several factors influence the measurement errors of the pig affecting the reliability of the results. This work shows different operating conditions and provides a test rig for feeler sensors of an inspection pig under different dynamic loads. The results of measurements of the damage type of shoulder and holes in a cyclic flat surface are evaluated, as well as a mathematical model for the sensor response and their errors from the actual behavior
Resumo:
Wetlands systems are considered nowadays as a treatment method that uses simple, easy operation and low cost technology, which has been used in various parts of the world and also in Brazil. Used alone or as a complement to other types of treatment systems, once it effectively removes nutrients, pathogens and other pollutants in the water. Due to the high complexity found in wetlands, making it difficult to predict the response of the system to treat wastewater, one should consider as ideal to base the sizing of the wetland system over the necessary removal of this parameter instead of scaling it from empiricism. The study was conducted to determine the coefficient of bacterial decrease in the Wetland unit located at Ponta Negra Station Sewage Treatment, located in Natal, the coastal region of Rio Grande do Norte. The most representative model to determine the bacterial decrease in this system was the one from Chick for hydraulic piston system. Kb of 0.37 d-1 were found for the flow rate of 15m³/d, while for the system operating at maximum design flow, 30m³/d, the Kb of 0.98 d-1 was found
Resumo:
Despite the emergence of other forms of artificial lift, sucker rod pumping systems remains hegemonic because of its flexibility of operation and lower investment cost compared to other lifting techniques developed. A successful rod pumping sizing necessarily passes through the supply of estimated flow and the controlled wear of pumping equipment used in the mounted configuration. However, the mediation of these elements is particularly challenging, especially for most designers dealing with this work, which still lack the experience needed to get good projects pumping in time. Even with the existence of various computer applications on the market in order to facilitate this task, they must face a grueling process of trial and error until you get the most appropriate combination of equipment for installation in the well. This thesis proposes the creation of an expert system in the design of sucker rod pumping systems. Its mission is to guide a petroleum engineer in the task of selecting a range of equipment appropriate to the context provided by the characteristics of the oil that will be raised to the surface. Features such as the level of gas separation, presence of corrosive elements, possibility of production of sand and waxing are taken into account in selecting the pumping unit, sucker-rod strings and subsurface pump and their operation mode. It is able to approximate the inferente process in the way of human reasoning, which leads to results closer to those obtained by a specialist. For this, their production rules were based on the theory of fuzzy sets, able to model vague concepts typically present in human reasoning. The calculations of operating parameters of the pumping system are made by the API RP 11L method. Based on information input, the system is able to return to the user a set of pumping configurations that meet a given design flow, but without subjecting the selected equipment to an effort beyond that which can bear
Resumo:
Nowadays, as well as in the past decades, the dumping of biodegradable organic waste in landfill is common practice in Brazil, as well as in most parts of the world. Nevertheless due to its rapid decomposition and release of odors, this practice hamper’s the operation and implementation of a recycling system. These facts encouraged our research to find an efficient system for the management of organic waste, not only for the use of official workers responsible for managing these wastes, but also for non-governmental institutions. The Recycling for Life Community Association – ACREVI (Associação Comunitária Reciclando para a Vida), together with the municipal authorities of Mossoró-RN, Brazil, have assumed the social role of collecting and recycling solid waste produced by most of the local population. However, it was observed that the organic waste it collected was not receiving any treatment. This present work aims to make compost with mixed waste (green waste and organic household), and then do chemical analysis of the material in view to use the waste as organic fertilizer. The objective being: to share the knowledge acquired by putting it into a very simple language accessible to people with little education. The experiment was conducted at ACREVI, Mossoró (RN), and the compost was obtained following the method "windrow", forming three cells (I, II, III) with conical shape, dimensions of 1.6 meters and 2.0 meters in diameter for cells I and II, and 1.0 meters high and 2.0 meters in diameter for cell III. The process was accompanied by analysis: CHN elemental, a variation of cell temperature, humidity, pH, TKN, bulk density, nutrients and heavy metals. Stabilized organic compounds reached the C/N ratio of 10.4/1 cell I and 10.4/1 in the cell II in the cell, showing how good soil conditions, with potential to improve the physical properties of any soil and pH acid soils, has presented the cell III at the end of the process the C/N 26/1, is a high ratio may be associated with the stack size III, thus changing the optimal conditions for the occurrence of the process. The levels of heavy metals in the analyzed compounds were lower than those established by the SDA normative instruction, Nº 27, of 5 June, 2006. The use of pruning trees and grass are used in small-scale composting, while generating a quality compost in the final process, it also created an important condition for a correct sizing of the composting piles. Under the studied conditions it is not advisable to use cells with a height of 1.00 m in height and 2.00 m in diameter, as these do not prevent the rapid dissipation of heat and thus can not be a good product at the end of composting. The composting process in the shed of the association and the preparation of the primer enabled the development of an alternative technology to generate income for members of ACREVI.
Resumo:
The sizing of nursing human resources is an essential management tool to meet the needs of the patients and the institution. Regarding to the Intensive Care Unit, where the most critical patients are treated and the most advanced life-support equipments are used, requiring a high number of skilled workers, the use of specific indicators to measure the workload of the team becomes necessary. The Nursing Activities Score is a validated instrument for measuring nursing workload in the Intensive Care Unit that has demonstrated effectiveness. It is a cross-sectional study with the primary objective of assessing the workload of nursing staff in an adult Intensive Care Unit through the application of the Nursing Activities Score. The study was conducted in a private hospital specialized in the treatment of patients with cancer, which is located in the city of Natal (Rio Grande do Norte – Brazil). The study was approved by the Research Ethics Committee of the hospital (Protocol number 558.799; CAAE 24966013.7.0000.5293). For data collection, a form of sociodemographic characteristics of the patients was used; the Nursing Activities Score was used to identify the workload of nursing staff; and the instrument of Perroca, which classifies patients and provides data related to the their need for nursing care, was also used. The collected data were analyzed using a statistical package. The categorical variables were described by absolute and relative frequency, while the number by median and interquartile range. Considering the inferential approach, the Spearman test, the Wald chi-square, Kruskal Wallis and Mann-Whitney test were used. The statistically significant variables were those with p values <0.05. The evaluation of the overall averages of NAS, considering the first 15 days of hospitalization, was performed by the analysis of Generalized Estimating Equations (GEE), with adjust for the variable length of hospitalization. The sample consisted of 40 patients, in the period of June to August 2014. The results showed a mean age of 62,1 years (±23,4) with a female predominance (57,5%). The most frequent type of treatment was clinical (60,0%), observing an average stay of 6,9 days (±6,5). Considering the origin, most patients (35%) came from the Surgical Center. There was a mortality rate of 27,5%. 277 measures of NAS score and Perroca were performed, and the averages of 69,8% (±24,1) and 22,7% (±4.2) were obtained, respectively. There was an association between clinical outcome and value of the Nursing Activities Score in 24 hours (p <0.001), and between the degree of dependency of patients and nursing workload (rp 0,653, p<0,001). The achieved workload of the nursing staff, in the analyzed period, was presented high, showing that hospitalized patients required a high demand for care. These findings create subsidies for sizing of staff and allocation of human resources in the sector, in order to achieve greater safety and patient satisfaction as a result of intensive care, as well as an environment conducive to quality of life for the professionals
Resumo:
Tailings dams are structures that aims to retain the solid waste and water from mining processes. Its analysis and planning begins with searching of location for deployment, step on which to bind all kinds of variables that directly or indirectly influence the work, such as geological, hydrological, tectonic, topographic, geotechnical, environmental, social characteristics, evaluation security risks, among others. Thus, this paper aims to present a study on the most appropriate and secure type of busbar to design a layout structure of iron ore tailings, taking into account all the above mentioned variables. The case study involves the assessment of sites for location of dams of tailings disposal beneficiation of iron mine to be built in Bonito, in the municipality of Jucurutu in Seridó Potiguar. For site selection among alternatives, various aspects of the current state of the art were considered, one that causes the least environmental impact, low cost investment, adding value to the product and especially the safety of the implanted structure mitigates the concern about induced earthquakes as a result of liquefaction wastes somatized by dams in the region, as the tilling of Mina Bonito is located practically in the hydraulic basin dam Armando Ribeiro in environmental protection (APA). The methodology compares induced by dams in the semiarid region with the characteristics of the waste disposal and sterile seismicity, taking into account the enhancement of liquefaction by the action of seismicity in the Mina Bonito region. With the fulcrum in the methodology, we indicated the best busbar type for disposal of tailings from iron ore or combination of them, to be designed and built in semiarid particularly for Mina Bonito. Also presents a number of possible uses for the tailings and in engineering activities, which may cause processing to the common good.