75 resultados para Distribuição de renda


Relevância:

20.00% 20.00%

Publicador:

Resumo:

We are observing, particurlarly in the last two decades an aggravation of social problems inherent in contemporary society, such as high rates of unereloyment and social exclusion. In this context, the social economy appears as an alternative to generate employment and income, especially for the country man through the production and distribution of developed products in a collective way where the actions of cooperation gain significant importance this study aims to determine how the collective actions affect the sustainability of cooperative socio-political and economic developments of the economy and so it was adopted a methodology of multiple case study in three organizations in the apiculture sector of Rio Grande do Norte the Beekeepers Association of São Rafael City (AAMSR); Beekeepers Association of Serra do Mel (APISMEL) and Family Agriculture Cooperative of Apodi (COOAFAP). To evaluate relationship in collaborative ventures solidarity it is constructed a matrix that identify and develop relationship in the organization and, to measure the level of sustainability of these ventures are calculated the indices of socio-political sustainability and economic sustainability. The research results shows a fully collaborative relationship in all cases based on factors such as effective communication between beekeepers involved/and also cooperated with these organization; availability of beekeepers to perform adjustments in production process; an organizational culture focused on collaboration and high level of situation described above and taking into account that the business of solidarity economy better positioned in the matrix of relationships are those that have best indices of sustainability, it is evidence the importance of collaborative relationships for the sustainability of joint ventures

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research aims to study the manioc flour productive chain in order to understand how the relationship between its segments happens, specially between the flour agroindustry and the distribuition. This research was made from a study of case that envolved three agro industries from the Potiguar wasteland and a company of food distribution. The filiére and the supply chain management analysis were applied to identify the functioning and the organization of the manioc flour productive chain. From the study of case it s noticed that the existing contracts, even the informal ones, has mutual benefits and it suggests that they be legalized

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper analyzes the development of Bobbin Lace and Design workshops, in the neighborhood of Vila de Ponta Negra (in Natal - RN, Brazil), which proposed contents and practices for its learning and teaching that would compose a possible model for a hybrid Workshop of Bobbin Lace and Lace Design. This research was based on Ergonomic Work Analysis, a methodology used by Ergonomics to analyze work in a wide approach, considering cognitive, social, organizational, as well as other aspects which are relevant to the study of the working situation, in terms of learning/teaching, as addressed on this paper. Some steps of the above mentioned methodology were followed in order to understand the activity of Bobbin Lace craftswomen, by means of bibliographical research centered on this activity. The instruments used for collecting data comprise of conversational actions, analysis of collective work, and spontaneous as well as provoked verbalizations. The adaptations performed in the process of learning/teaching Bobbin Lace for the achievement of Bobbin Lace and Design workshops became instrumental for the continuity of that tradition, attracting new apprentices to this art/craft causing to revitalize a network of handicraft economical activities linked to the Bobbin Lace production, such as the making of cushion, bobbins and trestles

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The bobbin lace, a secular art in the process of extinction in the Village Ponta Negra in Natal, Brazil, was one of the main means of income generation for some families in town, but over time, there was growing disaffection of the younger generation to learn and practice this art, due to the high demand of time for production and insufficient and not guaranteed financial return . This project aims to promote the recovery of control over the product in the production of bobbin lace in the village of Ponta Negra, by design and implementation of a workshop for the transfer of drawing techniques in the Production Center of Craft in Village of Ponta Negra. This design was based on the methodology of Ergonomic Work Analysis and in the concepts of anthropotechnology and technology social. The ergonomic analysis, by advocating and enforcing the social and technical building, was essential for the modeling of this workshop, as allowed the construction of a social participative device , with the participation of the community groups and the external group of researchers, in a process of social construction technique. As a result, it was observed that the transfer of technical design of bobbin lace molds came to complement the learning of art office, providing solutions to promote the sustainable development of the group of tenants, in an attempt to reduce the risk of extinction eminent, and also contributed to reactivate a network of economic activities interconnected to the craft, such as the production of cushions, lace and easels

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The usual programs for load flow calculation were in general developped aiming the simulation of electric energy transmission, subtransmission and distribution systems. However, the mathematical methods and algorithms used by the formulations were based, in majority, just on the characteristics of the transmittion systems, which were the main concern focus of engineers and researchers. Though, the physical characteristics of these systems are quite different from the distribution ones. In the transmission systems, the voltage levels are high and the lines are generally very long. These aspects contribute the capacitive and inductive effects that appear in the system to have a considerable influence in the values of the interest quantities, reason why they should be taken into consideration. Still in the transmission systems, the loads have a macro nature, as for example, cities, neiborhoods, or big industries. These loads are, generally, practically balanced, what reduces the necessity of utilization of three-phase methodology for the load flow calculation. Distribution systems, on the other hand, present different characteristics: the voltage levels are small in comparison to the transmission ones. This almost annul the capacitive effects of the lines. The loads are, in this case, transformers, in whose secondaries are connected small consumers, in a sort of times, mono-phase ones, so that the probability of finding an unbalanced circuit is high. This way, the utilization of three-phase methodologies assumes an important dimension. Besides, equipments like voltage regulators, that use simultaneously the concepts of phase and line voltage in their functioning, need a three-phase methodology, in order to allow the simulation of their real behavior. For the exposed reasons, initially was developped, in the scope of this work, a method for three-phase load flow calculation in order to simulate the steady-state behaviour of distribution systems. Aiming to achieve this goal, the Power Summation Algorithm was used, as a base for developing the three phase method. This algorithm was already widely tested and approved by researchers and engineers in the simulation of radial electric energy distribution systems, mainly for single-phase representation. By our formulation, lines are modeled in three-phase circuits, considering the magnetic coupling between the phases; but the earth effect is considered through the Carson reduction. It s important to point out that, in spite of the loads being normally connected to the transformer s secondaries, was considered the hypothesis of existence of star or delta loads connected to the primary circuit. To perform the simulation of voltage regulators, a new model was utilized, allowing the simulation of various types of configurations, according to their real functioning. Finally, was considered the possibility of representation of switches with current measuring in various points of the feeder. The loads are adjusted during the iteractive process, in order to match the current in each switch, converging to the measured value specified by the input data. In a second stage of the work, sensibility parameters were derived taking as base the described load flow, with the objective of suporting further optimization processes. This parameters are found by calculating of the partial derivatives of a variable in respect to another, in general, voltages, losses and reactive powers. After describing the calculation of the sensibility parameters, the Gradient Method was presented, using these parameters to optimize an objective function, that will be defined for each type of study. The first one refers to the reduction of technical losses in a medium voltage feeder, through the installation of capacitor banks; the second one refers to the problem of correction of voltage profile, through the instalation of capacitor banks or voltage regulators. In case of the losses reduction will be considered, as objective function, the sum of the losses in all the parts of the system. To the correction of the voltage profile, the objective function will be the sum of the square voltage deviations in each node, in respect to the rated voltage. In the end of the work, results of application of the described methods in some feeders are presented, aiming to give insight about their performance and acuity

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most algorithms for state estimation based on the classical model are just adequate for use in transmission networks. Few algorithms were developed specifically for distribution systems, probably because of the little amount of data available in real time. Most overhead feeders possess just current and voltage measurements at the middle voltage bus-bar at the substation. In this way, classical algorithms are of difficult implementation, even considering off-line acquired data as pseudo-measurements. However, the necessity of automating the operation of distribution networks, mainly in regard to the selectivity of protection systems, as well to implement possibilities of load transfer maneuvers, is changing the network planning policy. In this way, some equipments incorporating telemetry and command modules have been installed in order to improve operational features, and so increasing the amount of measurement data available in real-time in the System Operation Center (SOC). This encourages the development of a state estimator model, involving real-time information and pseudo-measurements of loads, that are built from typical power factors and utilization factors (demand factors) of distribution transformers. This work reports about the development of a new state estimation method, specific for radial distribution systems. The main algorithm of the method is based on the power summation load flow. The estimation is carried out piecewise, section by section of the feeder, going from the substation to the terminal nodes. For each section, a measurement model is built, resulting in a nonlinear overdetermined equations set, whose solution is achieved by the Gaussian normal equation. The estimated variables of a section are used as pseudo-measurements for the next section. In general, a measurement set for a generic section consists of pseudo-measurements of power flows and nodal voltages obtained from the previous section or measurements in real-time, if they exist -, besides pseudomeasurements of injected powers for the power summations, whose functions are the load flow equations, assuming that the network can be represented by its single-phase equivalent. The great advantage of the algorithm is its simplicity and low computational effort. Moreover, the algorithm is very efficient, in regard to the accuracy of the estimated values. Besides the power summation state estimator, this work shows how other algorithms could be adapted to provide state estimation of middle voltage substations and networks, namely Schweppes method and an algorithm based on current proportionality, that is usually adopted for network planning tasks. Both estimators were implemented not only as alternatives for the proposed method, but also looking for getting results that give support for its validation. Once in most cases no power measurement is performed at beginning of the feeder and this is required for implementing the power summation estimations method, a new algorithm for estimating the network variables at the middle voltage bus-bar was also developed

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The usual programs for load flow calculation were in general developped aiming the simulation of electric energy transmission, subtransmission and distribution systems. However, the mathematical methods and algorithms used by the formulations were based, in majority, just on the characteristics of the transmittion systems, which were the main concern focus of engineers and researchers. Though, the physical characteristics of these systems are quite different from the distribution ones. In the transmission systems, the voltage levels are high and the lines are generally very long. These aspects contribute the capacitive and inductive effects that appear in the system to have a considerable influence in the values of the interest quantities, reason why they should be taken into consideration. Still in the transmission systems, the loads have a macro nature, as for example, cities, neiborhoods, or big industries. These loads are, generally, practically balanced, what reduces the necessity of utilization of three-phase methodology for the load flow calculation. Distribution systems, on the other hand, present different characteristics: the voltage levels are small in comparison to the transmission ones. This almost annul the capacitive effects of the lines. The loads are, in this case, transformers, in whose secondaries are connected small consumers, in a sort of times, mono-phase ones, so that the probability of finding an unbalanced circuit is high. This way, the utilization of three-phase methodologies assumes an important dimension. Besides, equipments like voltage regulators, that use simultaneously the concepts of phase and line voltage in their functioning, need a three-phase methodology, in order to allow the simulation of their real behavior. For the exposed reasons, initially was developped, in the scope of this work, a method for three-phase load flow calculation in order to simulate the steady-state behaviour of distribution systems. Aiming to achieve this goal, the Power Summation Algorithm was used, as a base for developping the three phase method. This algorithm was already widely tested and approved by researchers and engineers in the simulation of radial electric energy distribution systems, mainly for single-phase representation. By our formulation, lines are modeled in three-phase circuits, considering the magnetic coupling between the phases; but the earth effect is considered through the Carson reduction. Its important to point out that, in spite of the loads being normally connected to the transformers secondaries, was considered the hypothesis of existence of star or delta loads connected to the primary circuit. To perform the simulation of voltage regulators, a new model was utilized, allowing the simulation of various types of configurations, according to their real functioning. Finally, was considered the possibility of representation of switches with current measuring in various points of the feeder. The loads are adjusted during the iteractive process, in order to match the current in each switch, converging to the measured value specified by the input data. In a second stage of the work, sensibility parameters were derived taking as base the described load flow, with the objective of suporting further optimization processes. This parameters are found by calculating of the partial derivatives of a variable in respect to another, in general, voltages, losses and reactive powers. After describing the calculation of the sensibility parameters, the Gradient Method was presented, using these parameters to optimize an objective function, that will be defined for each type of study. The first one refers to the reduction of technical losses in a medium voltage feeder, through the installation of capacitor banks; the second one refers to the problem of correction of voltage profile, through the instalation of capacitor banks or voltage regulators. In case of the losses reduction will be considered, as objective function, the sum of the losses in all the parts of the system. To the correction of the voltage profile, the objective function will be the sum of the square voltage deviations in each node, in respect to the rated voltage. In the end of the work, results of application of the described methods in some feeders are presented, aiming to give insight about their performance and acuity

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The reconfiguration of a distribution network is a change in its topology, aiming to provide specific operation conditions of the network, by changing the status of its switches. It can be performed regardless of any system anomaly. The service restoration is a particular case of reconfiguration and should be performed whenever there is a network failure or whenever one or more sections of a feeder have been taken out of service for maintenance. In such cases, loads that are supplied through lines sections that are downstream of portions removed for maintenance may be supplied by the closing of switches to the others feeders. By classical methods of reconfiguration, several switches may be required beyond those used to perform the restoration service. This includes switching feeders in the same substation or for substations that do not have any direct connection to the faulted feeder. These operations can cause discomfort, losses and dissatisfaction among consumers, as well as a negative reputation for the energy company. The purpose of this thesis is to develop a heuristic for reconfiguration of a distribution network, upon the occurrence of a failure in this network, making the switching only for feeders directly involved in this specific failed segment, considering that the switching applied is related exclusively to the isolation of failed sections and bars, as well as to supply electricity to the islands generated by the condition, with significant reduction in the number of applications of load flows, due to the use of sensitivity parameters for determining voltages and currents estimated on bars and lines of the feeders directly involved with that failed segment. A comparison between this process and classical methods is performed for different test networks from the literature about networks reconfiguration

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of solar energy for water disinfection, and is accessible to disadvantaged communities because of its low cost, has the advantage of using disposable materials such as bottles of polyethylene terephthalate (PET). We present a study that used two methods of disinfection: the methodology proposed by the project Solar Water Disinfection (SODIS), which consisted of water disinfection by solar radiation and temperature and the methodology which the temperature of the water for disinfection. In both, we seek to eliminate microorganisms that cause serious diseases such as dysentery, typhoid, cholera, etc. Water samples were collected in the community of Bass, where the population has low income and the incidence of waterborne diseases is high. The experiments were divided into two stages. In step 1 we studied the feasibility of disinfection and in step 2 the feasibility of the pilot plant to obtain adequate levels of disinfection temperatures desired. The results showed the efficiency of the disinfection process, reaching an average of 80 to 100% death of microorganisms, but regrowth was observed in some samples. Finally on the good results of stage 1, is designed and built and tested in an experimental pilot plant, which has shown to be feasible to promote water disinfection through the use of solar energy. The water after treatment is in accordance with the limits established by Brazilian legislation for clean water, maintaining a positive performance for the disinfection and acceptable levels of bacterial regrowth

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The state of Rio Grande do Norte, possessor of an extremely irregular regime of rains, has the necessity of enlarge and specify the researches about its own hydro-climatic conditions, to achieve trustworthy results that are able to minimize the adversities imposed by these conditions and make possible the implementation of a better planning in the economic activities and of subsistence that somehow utilize of the multiple uses of hydro resources of the State. This way, the daily values observed from the pluviometric series of 166 posts, with 45 years uninterrupted of historic data, were adjusted to the incomplete gamma function to the determination of the probability of rain in the 36 period of ten days in which the year was divided. To the attainment of the α and β parameters of this function it was applied the method of the maximum verisimilitude allowing, in the end, to analyze the temporal and spatial distribution of the rain in the level of 75% of probability. The values of potential evapo-transpiration were calculated by the Linacre method that, through the SURFER software, were confronted with the dependant rain, obtaining, in this way, the spatialization of the potential hydro availability, which the values can be known to any period of ten days of the year, city and/or region of the state of Rio Grande do Norte. With the identification of the main meteorological systems that act in the State, we sought to better comprehend how this systems interfere, in the irregular regime of rain, in the situations of several clime in the major part of Rio Grande do Norte and in the hydro regional balance. And, finally, with these data in hand and with the generated maps, we verified that space-temporal distribution of the rain and of the potential hydro availability were heterogeneous in the whole State, mainly in the West and Central regions, inserted in potiguar s semi-arid, which, after the period of the rains station, suffers with dry season and length drought during the rest of the year

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this study is to characterize and evaluate the Macro System of Regional Water Distribution Natal North (RNN) and Southern Regional Natal (RNS), covering 35% and 65% respectively of the Natal-RN City. The terms of the quality and quantity of water (surface and groundwater) were also evaluated in order to adjust the parameters that contribute to proper distribution and control in water reserves. The methodology of the work took place from collecting volumetric data of production capacity and distribution of the two treatment plants for Regional as well as the flow rates of wells. Yet the quantitative capacity of reservation, distribution and consumption of the main reservoirs, population numbers and consumption of members neighborhoods were collected. Data were tabulated and used in computational simulator EPANET to diagnose possible through the water balance, the offers and demands on the water supply system in the neighborhoods of the capital, linking them to specific distribution points. We also evaluated the wells in the levels of nitrate in water consumed. As a result it was found that some neighborhoods in the South Regional Natal, was ranked as critical supply situation: City of Hope, Lagoa Nova and Nova Descoberta, where demand exceeds supply. While in most Northern Regional Natal present deficiency in the supply system as: Lagoa Azul, the Parque dos Coqueiros, igapó, Amarante and Salinas. The rates of nitrate in the city were significant, but manageable with corrective and preventive measures. The averages were 12 mg /l-N in Candelária, 10 mg/l-N in Lagoa Nova, 9 mg/l-N in Satelite, 20 mg/l-N in Gramore and 15 mg/l-N in N. Sra. Apresentação. Therefore proper distribution of water abstracted and implementation of quality control ensures the supply required by the system, associated with preservation of Water Resources of the Metropolitan Region of Natal

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This dissertation presents a methodology to the optimization of a predial system of cold water distribution. It s about a study of a case applied to the Tropical Buzios Residential Condominium, located in the Búzio s Beach, Nísia Floresta city, the east coast of the Rio Grande do Norte state, twenty kilometers far from Natal. The design of cold water distribution networks according to Norm NBR 5626 of the ABNT - Brazilian Association of Techniques Norms, does not guarantee that the joined solution is the optimal solution of less cost. It s necessary the use of an optimization methodology, that supplies us, between all the possible solutions, the minimum cost solution. In the optimization process of the predial system of water distribution of the Tropical Búzios Condominium, is used Method Granados, that is an iterative algorithm of optimization, based on the Dynamic Programming, that supplies the minimum cost s network, in function of the piezometric quota of the reservoir. For the application of this Method in ramifies networks, is used a program of computer in C language. This process is divided in two stages: attainment of the previous solution and reduction of the piezometric quota of headboard. In the attainment of the previous solution, the minors possible diameters are used that guarantee the limit of maximum speed and the requirements of minimum pressures. The piezometric quota of headboard is raised to guarantee these requirements. In the second stage of the Granados Method, an iterative process is used and it objective is to reduce the quota of headboard gradually, considering the substitution of stretches of the network pipes for the subsequent diameters, considering a minimum addition of the network cost. The diameter change is made in the optimal stretch that presents the lesser Exchange Gradient. The process is locked up when the headboard quota of desired is reached. The optimized network s material costs are calculated, and is made the analysis of the same ones, through the comparison with the conventional network s costs