35 resultados para Dimensionamento de pavilhões


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The progressing cavity pump artificial lift system, PCP, is a main lift system used in oil production industry. As this artificial lift application grows the knowledge of it s dynamics behavior, the application of automatic control and the developing of equipment selection design specialist systems are more useful. This work presents tools for dynamic analysis, control technics and a specialist system for selecting lift equipments for this artificial lift technology. The PCP artificial lift system consists of a progressing cavity pump installed downhole in the production tubing edge. The pump consists of two parts, a stator and a rotor, and is set in motion by the rotation of the rotor transmitted through a rod string installed in the tubing. The surface equipment generates and transmits the rotation to the rod string. First, is presented the developing of a complete mathematical dynamic model of PCP system. This model is simplified for use in several conditions, including steady state for sizing PCP equipments, like pump, rod string and drive head. This model is used to implement a computer simulator able to help in system analysis and to operates as a well with a controller and allows testing and developing of control algorithms. The next developing applies control technics to PCP system to optimize pumping velocity to achieve productivity and durability of downhole components. The mathematical model is linearized to apply conventional control technics including observability and controllability of the system and develop design rules for PI controller. Stability conditions are stated for operation point of the system. A fuzzy rule-based control system are developed from a PI controller using a inference machine based on Mandami operators. The fuzzy logic is applied to develop a specialist system that selects PCP equipments too. The developed technics to simulate and the linearized model was used in an actual well where a control system is installed. This control system consists of a pump intake pressure sensor, an industrial controller and a variable speed drive. The PI control was applied and fuzzy controller was applied to optimize simulated and actual well operation and the results was compared. The simulated and actual open loop response was compared to validate simulation. A case study was accomplished to validate equipment selection specialist system

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The usual programs for load flow calculation were in general developped aiming the simulation of electric energy transmission, subtransmission and distribution systems. However, the mathematical methods and algorithms used by the formulations were based, in majority, just on the characteristics of the transmittion systems, which were the main concern focus of engineers and researchers. Though, the physical characteristics of these systems are quite different from the distribution ones. In the transmission systems, the voltage levels are high and the lines are generally very long. These aspects contribute the capacitive and inductive effects that appear in the system to have a considerable influence in the values of the interest quantities, reason why they should be taken into consideration. Still in the transmission systems, the loads have a macro nature, as for example, cities, neiborhoods, or big industries. These loads are, generally, practically balanced, what reduces the necessity of utilization of three-phase methodology for the load flow calculation. Distribution systems, on the other hand, present different characteristics: the voltage levels are small in comparison to the transmission ones. This almost annul the capacitive effects of the lines. The loads are, in this case, transformers, in whose secondaries are connected small consumers, in a sort of times, mono-phase ones, so that the probability of finding an unbalanced circuit is high. This way, the utilization of three-phase methodologies assumes an important dimension. Besides, equipments like voltage regulators, that use simultaneously the concepts of phase and line voltage in their functioning, need a three-phase methodology, in order to allow the simulation of their real behavior. For the exposed reasons, initially was developped, in the scope of this work, a method for three-phase load flow calculation in order to simulate the steady-state behaviour of distribution systems. Aiming to achieve this goal, the Power Summation Algorithm was used, as a base for developping the three phase method. This algorithm was already widely tested and approved by researchers and engineers in the simulation of radial electric energy distribution systems, mainly for single-phase representation. By our formulation, lines are modeled in three-phase circuits, considering the magnetic coupling between the phases; but the earth effect is considered through the Carson reduction. Its important to point out that, in spite of the loads being normally connected to the transformers secondaries, was considered the hypothesis of existence of star or delta loads connected to the primary circuit. To perform the simulation of voltage regulators, a new model was utilized, allowing the simulation of various types of configurations, according to their real functioning. Finally, was considered the possibility of representation of switches with current measuring in various points of the feeder. The loads are adjusted during the iteractive process, in order to match the current in each switch, converging to the measured value specified by the input data. In a second stage of the work, sensibility parameters were derived taking as base the described load flow, with the objective of suporting further optimization processes. This parameters are found by calculating of the partial derivatives of a variable in respect to another, in general, voltages, losses and reactive powers. After describing the calculation of the sensibility parameters, the Gradient Method was presented, using these parameters to optimize an objective function, that will be defined for each type of study. The first one refers to the reduction of technical losses in a medium voltage feeder, through the installation of capacitor banks; the second one refers to the problem of correction of voltage profile, through the instalation of capacitor banks or voltage regulators. In case of the losses reduction will be considered, as objective function, the sum of the losses in all the parts of the system. To the correction of the voltage profile, the objective function will be the sum of the square voltage deviations in each node, in respect to the rated voltage. In the end of the work, results of application of the described methods in some feeders are presented, aiming to give insight about their performance and acuity

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this study was to develop a pilot plant which the main goal is to emulate a flow peak pressure in a separation vessel. Effect similar that is caused by the production in a slug flow in production wells equipped with the artificial lift method plunger lift. The motivation for its development was the need to test in a plant on a smaller scale, a new technique developed to estimate the gas flow in production wells equipped with plunger lift. To develop it, studies about multiphase flow effects, operation methods of artificial lift in plunger lift wells, industrial instrumentation elements, control valves, vessel sizing separators and measurement systems were done. The methodology used was the definition of process flowcharts, its parameters and how the effects needed would be generated for the success of the experiments. Therefore, control valves, the design and construction of vessels and the acquisition of other equipment used were defined. One of the vessels works as a tank of compressed air that is connected to the separation vessel and generates pulses of gas controlled by a on/off valve. With the emulator system ready, several control experiments were made, being the control of peak flow pressure generation and the flow meter the main experiments, this way, it was confirmed the efficiency of the plant usage in the problem that motivated it. It was concluded that the system is capable of generate effects of flow with peak pressure in a primary separation vessel. Studies such as the estimation of gas flow at the exit of the vessel and several academic studies can be done and tested on a smaller scale and then applied in real plants, avoiding waste of time and money.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work deals with the development of an experimental study on a power supply of high frequency that provides the toch plasmica to be implemented in PLASPETRO project, which consists of two static converters developed by using Insulated Gate Bipolar Transistor (IGBT). The drivers used to control these keys are triggered by Digital Signal Processor (DSP) through optical fibers to reduce problems with electromagnetic interference (EMI). The first stage consists of a pre-regulator in the form of an AC to DC converter with three-phase boost power factor correction which is the main theme of this work, while the second is the source of high frequency itself. A series-resonant inverter consists of four (4) cell inverters operating in a frequency around 115 kHz each one in soft switching mode, alternating itself to supply the load (plasma torch) an alternating current with a frequency of 450 kHz. The first stage has the function of providing the series-resonant inverter a DC voltage, with the value controlled from the power supply provided by the electrical system of the utility, and correct the power factor of the system as a whole. This level of DC bus voltage at the output of the first stage will be used to control the power transferred by the inverter to the load, and it may vary from 550 VDC to a maximum of 800 VDC. To control the voltage level of DC bus driver used a proportional integral (PI) controller and to achieve the unity power factor it was used two other proportional integral currents controllers. Computational simulations were performed to assist in sizing and forecasting performance. All the control and communications needed to stage supervisory were implemented on a DSP

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work aims to predict the total maximum demand of a transformer that will be used in power systems to attend a Multiple Unit Consumption (MUC) in design. In 1987, COSERN noted that calculation of maximum total demand for a building should be different from that which defines the scaling of the input protection extension in order to not overestimate the power of the transformer. Since then there have been many changes, both in consumption habits of the population, as in electrical appliances, so that this work will endeavor to improve the estimation of peak demand. For the survey, data were collected for identification and electrical projects in different MUCs located in Natal. In some of them, measurements were made of demand for 7 consecutive days and adjusted for an integration interval of 30 minutes. The estimation of the maximum demand was made through mathematical models that calculate the desired response from a set of information previously known of MUCs. The models tested were simple linear regressions, multiple linear regressions and artificial neural networks. The various calculated results over the study were compared, and ultimately, the best answer found was put into comparison with the previously proposed model

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work purposes the application of a methodology to optimize the implantation cost of an wind-solar hybrid system for oil pumping. The developed model is estimated the implantation cost of system through Multiple Linear Regression technique, on the basis of the previous knowledge of variables: necessary capacity of storage, total daily energy demand, wind power, module power and module number. These variables are gotten by means of sizing. The considered model not only can be applied to the oil pumping, but also for any other purposes of electric energy generation for conversion of solar, wind or solar-wind energy, that demand short powers. Parametric statistical T-student tests had been used to detect the significant difference in the average of total cost to being considered the diameter of the wind, F by Snedecor in the variance analysis to test if the coefficients of the considered model are significantly different of zero and test not-parametric statistical by Friedman, toverify if there is difference in the system cost, by being considered the photovoltaic module powers. In decision of hypothesis tests was considered a 5%-significant level. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 3 HP. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 5 HP only to wind speed of 4m/s and 6 m/s in wind of 3 m, 4m and 5 m of diameter. There was not significant difference in costs to diameters of winds of 3 m and 4m. The mathematical model and the computational program may be used to others applications which require electrical between 2.250 W and 3.750 W. A computational program was developed to assist the study of several configurations that optimizes the implantation cost of an wind-solar system through considered mathematical model

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents an analysis of technical and financial feasibility of the use of a solar system for water heating in a fictitious hotel located in the Northeast region. Thereunto it is used techniques of solar collectors´ sizing and methods of financial mathematics, such as Net Present Value (NPV), Internal Rate of Return (IRR) and Payback. It will also be presented a sensitivity analysis to verify which are the factors that impact the viability of the solar heating. Comparative analysis will be used concerning three cities of distinct regions of Brazil: Curitiba, Belém and João Pessoa. The viability of using a solar heating system will be demonstrated to the whole Brazil, especially to the northeast region as it is the most viable for such an application of solar power because of its high levels of solar radiation. Among the cities examined for a future installation of solar heating systems for water heating in the hotel chain, João Pessoa was the one that has proved more viable.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Ensure the integrity of the pipeline network is an extremely important factor in the oil and gas industry. The engineering of pipelines uses sophisticated robotic inspection tools in-line known as instrumented pigs. Several relevant factors difficult the inspection of pipelines, especially in offshore field which uses pipelines with multi-diameters, radii of curvature accentuated, wall thickness of the pipe above the conventional, multi-phase flow and so on. Within this context, appeared a new instrumented Pig, called Feeler PIG, for detection and sizing of thickness loss in pipelines with internal damage. This tool was developed to overcome several limitations that other conventional instrumented pigs have during the inspection. Several factors influence the measurement errors of the pig affecting the reliability of the results. This work shows different operating conditions and provides a test rig for feeler sensors of an inspection pig under different dynamic loads. The results of measurements of the damage type of shoulder and holes in a cyclic flat surface are evaluated, as well as a mathematical model for the sensor response and their errors from the actual behavior

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Natal still dominates the use of individual disposal systems for domestic sewage, once only 29% of the city has a sewarage system. Wastes that are accumulated in these individual treatment systems should be exhausted periodically, service provided by collector entrepreneurs. Some of these companies causing major damage to the environment. In Natal, only two companies have their own septage (RESTI) treatment system, which were designed with parameters from domestic sewage generating strain and inefficient systems. Therefore, the characterization becomes essential as a source of parameters for their design. Thus, this work presents the physical-chemical and microbiological characterization of waste pumped from individual sewage treatment systems. Samples collections were made weekly from 5 different trucks at the reception point on the treatment plant on the point of the preliminary treatment. From each truck it was taken 5 samples during the discharge in order to make a composite sample. Afterwards, samples were carried out to laboratory and analyses for determination of temperature, pH, conductivity, BOD, COD, nitrogen (ammonia e organic), alkalinity, oils, phosphorus, solids, faecal coliforms and helminth egg. The results were treated as a single database, and ranked according to its generating source (multi and single house, lodging, health, services and / or food), area of origin (metropolitan, south and north) and type of system (cesspits, septic tank and / or sink). Through these data it was possible to verify that the type of system adopted by most in Natal and the metropolitan region is cesspit, besides to confirm the difference between the septage of areas with a population have different social and economical characteristics. It was found that the septage have higher concentrations than domestic sewage, except for thermotolerant coliforms that showed concentrations of 1,38E+07. Among the parameters studied, is the median values identified for COD (3,549 mg / L), BOD (973mg / L) and total solids (3.557mg / L). The volatile fraction constitutes about 70% of the total solids of the septage. For helminths has been a median of 7 eggs/L. In general, the characteristics of the waste followed the variability found in the literature reviewed for all variables, showing high amplitudes

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Wetlands systems are considered nowadays as a treatment method that uses simple, easy operation and low cost technology, which has been used in various parts of the world and also in Brazil. Used alone or as a complement to other types of treatment systems, once it effectively removes nutrients, pathogens and other pollutants in the water. Due to the high complexity found in wetlands, making it difficult to predict the response of the system to treat wastewater, one should consider as ideal to base the sizing of the wetland system over the necessary removal of this parameter instead of scaling it from empiricism. The study was conducted to determine the coefficient of bacterial decrease in the Wetland unit located at Ponta Negra Station Sewage Treatment, located in Natal, the coastal region of Rio Grande do Norte. The most representative model to determine the bacterial decrease in this system was the one from Chick for hydraulic piston system. Kb of 0.37 d-1 were found for the flow rate of 15m³/d, while for the system operating at maximum design flow, 30m³/d, the Kb of 0.98 d-1 was found

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This dissertation presents a methodology to the optimization of a predial system of cold water distribution. It s about a study of a case applied to the Tropical Buzios Residential Condominium, located in the Búzio s Beach, Nísia Floresta city, the east coast of the Rio Grande do Norte state, twenty kilometers far from Natal. The design of cold water distribution networks according to Norm NBR 5626 of the ABNT - Brazilian Association of Techniques Norms, does not guarantee that the joined solution is the optimal solution of less cost. It s necessary the use of an optimization methodology, that supplies us, between all the possible solutions, the minimum cost solution. In the optimization process of the predial system of water distribution of the Tropical Búzios Condominium, is used Method Granados, that is an iterative algorithm of optimization, based on the Dynamic Programming, that supplies the minimum cost s network, in function of the piezometric quota of the reservoir. For the application of this Method in ramifies networks, is used a program of computer in C language. This process is divided in two stages: attainment of the previous solution and reduction of the piezometric quota of headboard. In the attainment of the previous solution, the minors possible diameters are used that guarantee the limit of maximum speed and the requirements of minimum pressures. The piezometric quota of headboard is raised to guarantee these requirements. In the second stage of the Granados Method, an iterative process is used and it objective is to reduce the quota of headboard gradually, considering the substitution of stretches of the network pipes for the subsequent diameters, considering a minimum addition of the network cost. The diameter change is made in the optimal stretch that presents the lesser Exchange Gradient. The process is locked up when the headboard quota of desired is reached. The optimized network s material costs are calculated, and is made the analysis of the same ones, through the comparison with the conventional network s costs

Relevância:

10.00% 10.00%

Publicador:

Resumo:

n this master s dissertation a Kerr Magneto Optic s magnetometer effect was set up to do characterization of samples type films fine and ultra thin, these samples will be grown after the implementation of the sputtering technique at the magnetism laboratory of of this department. In this work a cooled electromagnet was also built the water and that it reaches close values to 10kOe with a gap of 22 mm including an area of uniform field of 25mm of diameter. The first chapter treats of the construction of this electromagnet from its dimensioning to the operation tests that involve measures of reached maximum field and temperature of the reels when operated during one hour. The second chapter is dedicated to the revision of the magnetism and the magnetization processes as well as it presents a theoretical base regarding the magnetic energies found in films and magnetic multilayer. In the sequence, the third chapter, is especially dedicated the description of the effects magneto opticians the effect kerr in the longitudinal, traverse and polar configurations, using for so much only the classic approach of the electromagnetism and the coefficients of Fresnel. Distinguished the two areas of observation of the effect regarding thickness of the film. The constructive aspects of the experimental apparatus as well as the details of its operation are explained at the room surrender, also presenting the preliminary results of the measures made in one serializes of permalloy films and concluding with the results of the characterization of the first films of iron and permalloy grown here at the theoretical and experimental physics department at UFRN

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work consists on the study of two important problems arising from the operations of petroleum and natural gas industries. The first problem the pipe dimensioning problem on constrained gas distribution networks consists in finding the least cost combination of diameters from a discrete set of commercially available ones for the pipes of a given gas network, such that it respects minimum pressure requirements at each demand node and upstream pipe conditions. On its turn, the second problem the piston pump unit routing problem comes from the need of defining the piston pump unit routes for visiting a number of non-emergent wells in on-shore fields, i.e., wells which don t have enough pressure to make the oil emerge to surface. The periodic version of this problem takes into account the wells re-filling equation to provide a more accurate planning in the long term. Besides the mathematical formulation of both problems, an exact algorithm and a taboo search were developed for the solution of the first problem and a theoretical limit and a ProtoGene transgenetic algorithm were developed for the solution of the second problem. The main concepts of the metaheuristics are presented along with the details of their application to the cited problems. The obtained results for both applications are promising when compared to theoretical limits and alternate solutions, either relative to the quality of the solutions or to associated running time

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Nowadays, as well as in the past decades, the dumping of biodegradable organic waste in landfill is common practice in Brazil, as well as in most parts of the world. Nevertheless due to its rapid decomposition and release of odors, this practice hamper’s the operation and implementation of a recycling system. These facts encouraged our research to find an efficient system for the management of organic waste, not only for the use of official workers responsible for managing these wastes, but also for non-governmental institutions. The Recycling for Life Community Association – ACREVI (Associação Comunitária Reciclando para a Vida), together with the municipal authorities of Mossoró-RN, Brazil, have assumed the social role of collecting and recycling solid waste produced by most of the local population. However, it was observed that the organic waste it collected was not receiving any treatment. This present work aims to make compost with mixed waste (green waste and organic household), and then do chemical analysis of the material in view to use the waste as organic fertilizer. The objective being: to share the knowledge acquired by putting it into a very simple language accessible to people with little education. The experiment was conducted at ACREVI, Mossoró (RN), and the compost was obtained following the method "windrow", forming three cells (I, II, III) with conical shape, dimensions of 1.6 meters and 2.0 meters in diameter for cells I and II, and 1.0 meters high and 2.0 meters in diameter for cell III. The process was accompanied by analysis: CHN elemental, a variation of cell temperature, humidity, pH, TKN, bulk density, nutrients and heavy metals. Stabilized organic compounds reached the C/N ratio of 10.4/1 cell I and 10.4/1 in the cell II in the cell, showing how good soil conditions, with potential to improve the physical properties of any soil and pH acid soils, has presented the cell III at the end of the process the C/N 26/1, is a high ratio may be associated with the stack size III, thus changing the optimal conditions for the occurrence of the process. The levels of heavy metals in the analyzed compounds were lower than those established by the SDA normative instruction, Nº 27, of 5 June, 2006. The use of pruning trees and grass are used in small-scale composting, while generating a quality compost in the final process, it also created an important condition for a correct sizing of the composting piles. Under the studied conditions it is not advisable to use cells with a height of 1.00 m in height and 2.00 m in diameter, as these do not prevent the rapid dissipation of heat and thus can not be a good product at the end of composting. The composting process in the shed of the association and the preparation of the primer enabled the development of an alternative technology to generate income for members of ACREVI.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The sizing of nursing human resources is an essential management tool to meet the needs of the patients and the institution. Regarding to the Intensive Care Unit, where the most critical patients are treated and the most advanced life-support equipments are used, requiring a high number of skilled workers, the use of specific indicators to measure the workload of the team becomes necessary. The Nursing Activities Score is a validated instrument for measuring nursing workload in the Intensive Care Unit that has demonstrated effectiveness. It is a cross-sectional study with the primary objective of assessing the workload of nursing staff in an adult Intensive Care Unit through the application of the Nursing Activities Score. The study was conducted in a private hospital specialized in the treatment of patients with cancer, which is located in the city of Natal (Rio Grande do Norte – Brazil). The study was approved by the Research Ethics Committee of the hospital (Protocol number 558.799; CAAE 24966013.7.0000.5293). For data collection, a form of sociodemographic characteristics of the patients was used; the Nursing Activities Score was used to identify the workload of nursing staff; and the instrument of Perroca, which classifies patients and provides data related to the their need for nursing care, was also used. The collected data were analyzed using a statistical package. The categorical variables were described by absolute and relative frequency, while the number by median and interquartile range. Considering the inferential approach, the Spearman test, the Wald chi-square, Kruskal Wallis and Mann-Whitney test were used. The statistically significant variables were those with p values <0.05. The evaluation of the overall averages of NAS, considering the first 15 days of hospitalization, was performed by the analysis of Generalized Estimating Equations (GEE), with adjust for the variable length of hospitalization. The sample consisted of 40 patients, in the period of June to August 2014. The results showed a mean age of 62,1 years (±23,4) with a female predominance (57,5%). The most frequent type of treatment was clinical (60,0%), observing an average stay of 6,9 days (±6,5). Considering the origin, most patients (35%) came from the Surgical Center. There was a mortality rate of 27,5%. 277 measures of NAS score and Perroca were performed, and the averages of 69,8% (±24,1) and 22,7% (±4.2) were obtained, respectively. There was an association between clinical outcome and value of the Nursing Activities Score in 24 hours (p <0.001), and between the degree of dependency of patients and nursing workload (rp 0,653, p<0,001). The achieved workload of the nursing staff, in the analyzed period, was presented high, showing that hospitalized patients required a high demand for care. These findings create subsidies for sizing of staff and allocation of human resources in the sector, in order to achieve greater safety and patient satisfaction as a result of intensive care, as well as an environment conducive to quality of life for the professionals