87 resultados para Roof deconstruction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: The rapid and ongoing expansion of urbanised impervious areas could lead to more frequent flood inundation in urban flood-prone regions. Nowadays, urban flood inundation induced by rainstorm is an expensive natural disaster in many countries. In order to reduce the flooding risk, eco-roof systems (or green roof systems) could be considered as an effective mechanism of mitigating flooding disasters through their rainwater retention capability. However, there is still a lack of examining the stormwater management tool. The purpose of this paper is to evaluate the effects on flooding disaster from extensive green roofs. Design/methodology/approach: Based on geographical information system (GIS) simulation, this research presents a frame of assessing eco-roof impacts on urban flash floods. The approach addresses both urban rainfall-runoff and underground hydrologic models for traditional impervious and green roofs. Deakin University’s Geelong Waurn Ponds campus is chosen as a study case. GIS technologies are then utilised to visualise and analyse the effects on flood inundation from surface properties of building roofs. Findings: The results reveal that the eco-roof systems generate varying degrees of mitigation of urban flood inundation with different return period storms. Originality/value: Although the eco-roof technology is considered as an effective stormwater management tool, it is not commonly adopted and examined in urban floods. This study will bring benefits to urban planners for raising awareness of hazard impacts and to construction technicians for considering disaster mitigation via roof technologies. The approach proposed here could be used for the disaster mitigation in future urban planning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The truss bolt reinforcement system has been used in controlling the stability of underground excavations in severe ground conditions and cutter roof failure in layered rocks especially in coal mines. In spite of good application reports, working mechanism of this system is largely unknown and truss bolts are predominantly designed based on past experience and engineering judgement. In this study, the reinforcing effect of the truss bolt system on an underground excavation in layered rock is studied using non-linear finite element analysis. Different indicators are defined to evaluate the reinforcing effects of the truss bolt system. Using these indicators one can evaluate the effects of a reinforcing system on the deformation, loosened area, failure prevention, horizontal movement of the immediate layer, shear crack propagation and cutter roof failure of underground excavations. Effects of truss bolt on these indicators reveal the working mechanism of the truss bolt system. To illustrate the application of these indicators, a comparative study is conducted between three different truss bolt designs. It is shown that the design parameters of truss bolt systems, including tie-rod span, length, and angle of the bolts can have significant effects on the reinforcing capability of the system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Aims to compare the energy embodied in office buildings varying in height from a few storeys to over 50 storeys. The energy embodied in substructure, superstructure and finishes elements was investigated for five Melbourne office buildings of the following heights: 3, 7, 15, 42 and 52 storeys. The two high-rise buildings have approximately 60 percent more energy embodied per unit gross floor area (GFA) in their materials than the low-rise buildings. While building height was found to dictate the amount of energy embodied in the “structure group” elements (upper floors, columns, internal walls, external walls and staircases), other elements such as substructure, roof, windows and finishes seemed uninfluenced.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A key criterion by which any building will be judged when its environmental impact is assessed is its thermal performance. This paper describes the simulation of an office module in a three-storey university building in south eastern Australia. The module, located at the north-west corner of the top floor of the building, was chosen because it is likely to have the highest cooling load - a primary concern of energy conscious designers of commercial buildings for most parts of Australia.

In the paper, the initial key assumptions are stated, together with a description of a "reference" or base case, against which improvements in thermal performance were measured. The simulation process identified the major influences on thermal performance. This enabled changes in materials and construction, as well as basic design concepts to be evaluated. Features incorporated into the base case such as a metal roof and glazed walkway were found to have adverse influence on energy consumption, and were consequently rejected in preference for an improved design which included a hypocaust slab system on the roof of the office module. The final design was predicted to reduce the annual energy consumption for heating and cooling by 72% and 76% respectively.

La performance thermique est l'un des critegraveres cleacutes de l'eacutevaluation environnementale de tout bacirctiment. Cet article deacutecrit la simulation d'un module de bureau appartenant agrave un immeuble de trois eacutetages d'une universiteacute du sud-est de l'Australie. Ce module, situeacute agrave l'angle nord-ouest de l'eacutetage supeacuterieur du bacirctiment a eacuteteacute choisi car c'eacutetait lui qui, vraisemblablement, avait la charge de refroidissement la plus eacuteleveacutee, ce qui est une preacuteoccupation majeure des concepteurs conscients des problegravemes d'eacutenergie des bacirctiments commerciaux dans la plus grande partie du pays. Le processus de simulation a fait apparaicirctre trois influences principales sur la performance thermique par rapport agrave un cas de base. Cela a permis d'eacutevaluer les modifications apporteacutees aux mateacuteriaux et agrave la construction ainsi qu'aux avant-projets. Les caracteacuteristiques inteacutegreacutees dans le cas de base comme le toit meacutetallique et la passerelle vitreacutee avaient une influence neacutefaste sur la consommation d'eacutenergie et ont donc eacuteteacute rejeteacutees au beacuteneacutefice d'un concept ameacutelioreacute qui comprenait une dalle de type hypocauste sur le toit du module de bureau. Le concept final devrait reacuteduire la consommation annuelle d'eacutenergie pour le chauffage et le refroidissement de 72 % et 76 % respectivement, ce qui donne une ideacutee de la valeur ajouteacutee au processus de production agrave partir de proceacutedures avanceacutees de modeacutelisation et de simulation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper questions the relative silence of queer theory and theorizing in
environmental education research. We explore some possibilities for queering environmental education research by fabricating (and inviting colleagues to fabricate) stories of Camp Wilde, a fictional location that helps us to expose the facticity of the field’s heteronormative constructedness. These stories suggest alternative ways of (re)presenting and (re)producing both the subjects/objects of our inquiries and our identities as researchers. The contributors draw on a variety of theoretical resources from art history, deconstruction, ecofeminism, literary criticism, popular cultural studies, and feminist poststructuralism to perform an orientation to environmental education research that we hope will never be arrested by its categorization as a “new genre.”

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A commercial roller-skating centre in southern Australia had condensation problems on both the roof and floor. The building is a typical warehouse-type structure with a high level of natural ventilation due to poor construction and permanently open vents. A computer model of the building, using the thermal simulation software TRNSYS, was calibrated from a sensitivity analysis of three key parameters, namely air exchange rate, roof surface heat transfer coefficient and deep ground temperature. The predicted times of condensation on the roof were compared with site observations. The time of year was predicted with acceptable accuracy, although earlier in the morning than had been observed. The effect of installing foil insulation in the roof was simulated. Under normal winter conditions, this modification was enough to stop the condensation. However, in unusually cold and humid conditions, condensation still occurred on both surfaces. This was overcome by heating the floor (15 W/m 2 ) for approximately eight hours. Subsequent modifications have demonstrated the value of the simulations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

With the increasing stock of aging structures, building
demolition is becoming achallenging research field from
the perspective of management. As the converse of
construction, management of demolition puts forward some
new management themes or adds some new contents
even though the same issues are faced in construction
management. This research aims to develop a quantitative
approach to estimate the costs of a demolition project. A
cost analysis method is presented to systematically break
down the cost components involved in the demolition of
a structure. Due to the lack of robust research in theory
and systematic summary in practice to date, the economic
performances of demolition will be studied through acase
study, and the majority of parameters are derived from
actual experiences in practice. The proposed demolition cost
estimation method is applied to the actual form of building
elimination (Scenario 1), and further comparison is carried
out with two other elimination methods, which are the newly
developed deconstruction (Scenario 2) and mechanical
demolition (Scenario 3). Deconstruction is found to be the
most profitable in this particular instance, and is closely
followed by the actual form.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background: Whilst negative responses to traumatic injury have been well documented in the literature, there is a small but growing body of work that identifies posttraumatic growth as a salient feature of this experience. We contribute to this discourse by reporting on the experiences of 13 individuals who were traumatically injured, had undergone extensive rehabilitation and were discharged from formal care. All participants were injured through involvement in a motor vehicle accident, with the exception of one, who was injured through falling off the roof of a house.
Methods: In this qualitative study, we used an audio-taped in-depth interview with each participant as the means of data collection. Interviews were transcribed verbatim and analysed thematically to determine the participants' unique perspectives on the experience of recovery from traumatic injury. In reporting the findings, all participants' were given a pseudonym to assure their anonymity.
Results: Most participants indicated that their involvement in a traumatic occurrence was a springboard for growth that enabled them to develop new perspectives on life and living.
Conclusion: There are a number of contributions that health providers may make to the recovery of individuals who have been traumatically injured to assist them to develop new views of vulnerability and strength, make changes in relationships, and facilitate philosophical, physical and
spiritual growth.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This article presents a reflective theoretical deconstruction of my practice with disempowered human service workers. Specifically, it presents a case study of how critical reflection was fostered amongst a group of practitioners in Geelong, a regional Victorian town in Australia. This models how a critical postmodern analysis provided a framework for overcoming entrenched power dynamics and structural barriers in a particular context and at a particular point in time. It describes and analyses the content of this work in terms of its significance and implications for responding to the impact of globalisation on this group, which was undermining the effectiveness of their social work practice.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Building demolition is one of the most common activities in the construction industry. Several demolition techniques are commonly used, including mechanical demolition, deconstruction and hybrid demolition. Although deconstruction has been advocated for its environmentally friendly approaches, the cost comparison of a demolition project under different techniques is rarely researched. In this paper, the cost of a demolition project is broken down to input and output costs, which are further broken down to more countable sections. Through an empirical study in Victoria, Australia, project costs of mechanical demolition, hybrid demolition and deconstruction are investigated. It is found that deconstruction has the greatest profitability among the three techniques. Hybrid demolition, which is the actual technique adopted by the contractor, has a slightly lower profit, and mechanical demolition is the most expensive. Although deconstruction has the best overall economical performance, the small extra gain comes with increased complexity and risk that deters demolition contractors from its attempt. It is found in the paper that an optimized demolition project strategy exists between hybrid demolition and deconstruction with the greatest profitability among various building demolition techniques.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Presented is an examination of residential building faults in the Australian Slate of Victoria. The aim is to determine the interconnections between identified main house faults., with a view to establishing their cause· effect relationships. A total of 42753 residential houses in Victoria were examined for nine key faults fully documented in Archicentre's database. These faults are: rising damp. framing fault, illegal building, stump fault, timber rot, cracking, electrical fault, roof fault and water supply issue. Second to framing fault, roof fault was found to be closely associated with other house faults examined. Hence, this paper concludes that a properly framed and roofed house could limit most of these faults. As illegal building was observed to have only a little overall association with other house faults, this study has implications for the Australia Productivity Commission's on-going efforts to deregulate various aspects of the building and construction industry professions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The demolition of building structures produces enormous amounts of waste materials. In most current demolition projects, a great number of demolished materials are directly sent to landfill after their primary usage due to the difficulties in finding their next usage immediately. At the same time, because of limited supply of second-hand materials, new and high quality materials are used in construction projects whose design standards can be fitted using the secondary or used materials. However, this is an inefficient method to reduce waste because off the flow nature of the current waste-exchange systems and the demolition procedure. The recent concept using deconstruction rather than destruction for demolishing a constructed facility fails to achieve widespread understanding or acceptance due to various practical limitations. In this paper, for the purpose of envisaging the deconstruction implementations in practice and promoting cascading usages of construction materials, the concept of electronic demolition (e-Demotion, eDemolition) is put forward for the first time. E-demolition is a virtual demolition approach by which the demolition information, progress and outputs are operated before the physical demolition. Furthermore, the authors set up the essential models to implement electronic demolition of buildings from the viewpoints of demolition progress, business, and information. Each model is demonstrated in accord with the conventional demolition practice and subject to the ideal deconstruction implementation. Following the electronic demolition of a real project, the physical demolition can be anticipated with a minimum of construction waste emission.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The recent deconstruction approach for demolition projects promotes reusing and recycling materials. However, the demolition project is interrupted and slowed down while the project team wait for the waste exchange process. Wasted materials generated from the demolition project have to be stored on demolition site or extra depository. Cost and time might be lost for the inventory of wasted materials and products. Just-in-Time (JIT) is a matured method widely used in manufacture industry as well as construction industry. It is utilised to reduce the inventory of both raw materials and final products. It is also used to shorten production cycle and improve the quality of the products. The JIT philosophy can be applied into demolition project so that the inventory of wasted materials can be eliminated and the project time can be shortened. To implement JIT demolition, the waste exchange process can be performed before the wasted materials are generated from the project. Material owners and demanders can virtually plan for waste handling before the demolition project is physically implemented. As a result, waste materials can be sent to demanders through transportation right after they are produced from the project. Applying JIT philosophy in demolition projects can effectively reduce the inventory of wasted materials and the amount of demolition waste to be sent to landfills. Therefore the cost and time of the project are reduced, and the quality of final delivered materials is improved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The main objectives of this work are to establish a relationship between solar radiation and equivalent temperatures for the radiation heat source (oven) to be used in the laboratory and to determine the impact of solar radiation on the absorption and evaporation potential of roofing tiles (glazed and unglazed). Based on the results obtained, it is justifiable to conclude that solar radiation do affect the evaporation and absorption potential of the glazed and unglazed tiles. There is a trend of decrease in both the absorption and evaporation potential of both tiles when exposed to decreasing solar radiation. The evaporation potential of the roof tiles is much higher than its absorption potential. This is clearly displayed in both types of tiles.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Possums in urban areas can cause problems for residents when they live in the roof cavity of homes. The Victorian Living With Possums policy was implemented by the Department of Natural Resources and Environment (DNRE) in 1997 to address the ineffective, illegal and inhumane nature of possum management practices. Human-possum conflicts in urban areas can be difficult to resolve, and it is therefore important that the Living With Possums policy is effectively reaching the community and other stakeholders (e.g. vets, local councils).

This study represents Stage 1 of a two-part research project that aims to examine community awareness of and compliance with the policy and relevant legislation. A pilot questionnaire was designed and distributed to a sample of individuals who have recently hired possum traps from local councils or private organisations within metropolitan Melbourne. Preliminary findings indicate that although there is some level of awareness about the Living with Possums policy, there is evidence of non-compliance and a lack of understanding about the detailed policy guidelines. In Stage 2 of this project, questionnaires will be distributed to a larger sample of individuals who are experiencing conflicts with possums in order to examine just how widespread this lack of compliance and awareness is.