Setup time reduction facilitate the flexibility needed for just-in-time production. An integrated steel mill with meltshop, continuous caster and hot rolling mill is often operated as decoupled processes. Setup time reduction provides the flexibility needed to reduce buffering, shorten lead times and create an integrated process flow. The interdependency of setup times, process flexibility and integration were analysed through system dynamics simulation. The results showed significant reductions of energy consumption and tied capital. It was concluded that setup time reduction in the hot strip mill can aid process integration and hence improve production economy while reducing environmental impact.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The problem of scheduling a parallel program presented by a weighted directed acyclic graph (DAG) to the set of homogeneous processors for minimizing the completion time of the program has been extensively studied as academic optimization problem which occurs in optimizing the execution time of parallel algorithm with parallel computer.In this paper, we propose an application of the Ant Colony Optimization (ACO) to a multiprocessor scheduling problem (MPSP). In the MPSP, no preemption is allowed and each operation demands a setup time on the machines. The problem seeks to compose a schedule that minimizes the total completion time.We therefore rely on heuristics to find solutions since solution methods are not feasible for most problems as such. This novel heuristic searching approach to the multiprocessor based on the ACO algorithm a collection of agents cooperate to effectively explore the search space.A computational experiment is conducted on a suit of benchmark application. By comparing our algorithm result obtained to that of previous heuristic algorithm, it is evince that the ACO algorithm exhibits competitive performance with small error ratio.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The capacitor test process at ABB Capacitors in Ludvika must be improved to meet future demands for high voltage products. To find a solution to how to improve the test process, an investigation was performed to establish which parts of the process are used and how they operate. Several parts which can improves the process were identified. One of them was selected to be improved in correlation with the subject, mechanical engineering. Four concepts were generated and decision matrixes were used to systematically select the best concept. By improving the process several benefits has been added to the process. More units are able to be tested and lead time is reduced. As the lead time is reduced the cost for each unit is reduced, workers will work less hours for the same amount of tested units, future work to further improve the process is also identified. The selected concept was concept 1, the sway stop concept. This concept is used to reduce the sway of the capacitors as they have entered the test facility, the box. By improving this part of the test process a time saving of 20 seconds per unit can be achieved, equivalent to 7% time reduction. This can be compared to an additional 1400 units each year.