12 resultados para component isolation, system call interpositioning, hardware virtualization, application isolation

em Dalarna University College Electronic Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

An international standard, ISO/DP 9459-4 has been proposed to establish a uniform standard of quality for small, factory-made solar heating systerns. In this proposal, system components are tested separatelyand total system performance is calculated using system simulations based on component model parameter values validated using the results from the component tests. Another approach is to test the whole system in operation under representative conditions, where the results can be used as a measure of the general system performance. The advantage of system testing of this form is that it is not dependent on simulations and the possible inaccuracies of the models. Its disadvantage is that it is restricted to the boundary conditions for the test. Component testing and system simulation is flexible, but requires an accurate and reliable simulation model.The heat store is a key component conceming system performance. Thus, this work focuses on the storage system consisting store, electrical auxiliary heater, heat exchangers and tempering valve. Four different storage system configurations with a volume of 750 litre were tested in an indoor system test using a six -day test sequence. A store component test and system simulation was carried out on one of the four configurations, applying the proposed standard for stores, ISO/DP 9459-4A. Three newly developed test sequences for intemalload side heat exchangers, not in the proposed ISO standard, were also carried out. The MULTIPORT store model was used for this work. This paper discusses the results of the indoor system test, the store component test, the validation of the store model parameter values and the system simulations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nested by linear cointegration first provided in Granger (1981), the definition of nonlinear cointegration is presented in this paper. Sequentially, a nonlinear cointegrated economic system is introduced. What we mainly study is testing no nonlinear cointegration against nonlinear cointegration by residual-based test, which is ready for detecting stochastic trend in nonlinear autoregression models. We construct cointegrating regression along with smooth transition components from smooth transition autoregression model. Some properties are analyzed and discussed during the estimation procedure for cointegrating regression, including description of transition variable. Autoregression of order one is considered as the model of estimated residuals for residual-based test, from which the teststatistic is obtained. Critical values and asymptotic distribution of the test statistic that we request for different cointegrating regressions with different sample sizes are derived based on Monte Carlo simulation. The proposed theoretical methods and models are illustrated by an empirical example, comparing the results with linear cointegration application in Hamilton (1994). It is concluded that there exists nonlinear cointegration in our system in the final results.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Projektet omfattade en jämförelsestudie avseende stomsystem. Studien undersökte ramverk och fackverk/balk/pelar-system och genomfördes självständigt med stöttning av Ramböll AB´s kontor i Falun. Syftet var främst att undersöka vilka skillnader det finns mellan tvåledsramar och fackverk/balk/pelar-system för lätta hallbyggnader och försöka få klarhet i varför fackverk/balk/pelar-system är det dominerande systemet i Sverige eftersom övriga Europa har tagit en annan utveckling och domineras av tvåledsramar. Studien undersöker skillnaderna mellan systemen i en hallbyggnad med förutbestämda mått i stål.Inledningsvis gjordes en litteraturstudie för att få en bredare bakgrund av systemen och en bättre förståelse om förutsättningarna för varje system. Efter litteraturstudien kunde sedan ett typhus och beräkningsunderlag för jämförelsestudien tas fram. Även en enkätstudie gjordes med syftet att skapa en tydlig bild av vilket stomsystem konstruktörer i Sverige oftast väljer och varför. Resultatet av studien visade att tvåledsramar ger en ökad kostnad jämfört med fackverk/balk/pelar-system i materialåtgång och framställning samt att beräkningarna blir mer komplicerade. Skulle fortsatta studier göras med dessa system i byggnader med andra mått skulle det kanske gå att få fram speciella mått på byggnader där kostnaden för tvåledsramar blir densamma som för fackverk/balk/pelar-system och därför är ett likvärdigt alternativ som stomsystem.En viktig slutsats från projektet är att tvåledsramar används mycket mer sällan än fackverk/balk/pelar-system som stomsystem i lätta hallbyggnader i Sverige på grund av att kostnaderna blir mycket högre med tvåledsramar och att det är ett mer komplicerat system i beräkningsarbetet. De viktigaste slutsatserna från jämförelsestudien går att sammafatta som följande: Tvåledsramar är dyrare att använda. Tvåledsramar är ett mer komplicerat system beräkningsmässigt. Traditionen av att använda tvåledsramar finns inte och därför används inte systemet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chunkwood is a wood fuel with a fuel particle length between 50 and 150 mm, i.e. with a sizebetween wood chips and conventional firewood. Chunkwood can be produced and handled asrational as wood chips and can dry during storage like conventional firewood. This is known sincelong. In project Smallwood for small scale heating we have investigated if chunkwood can be usedin a small scale as a fuel for heating detached houses in conventional firewood boilers as well asautomatically fed to a boiler in a similar way as wood chips. We have also compared completesystems for small scale production, distribution and heating with chunkwood, wood chips andconventional firewood.Storage of chunkwood produced for testing small scale boilers confirmed that chunkwood can dryduring storage at least as good as conventional firewood. Tests in different boilers for detachedhomes showed that chunkwood can be used in conventional firewood boilers as well as in automaticallyfed wood chips boilers. Chunkwood can be delivered to the customer to the same or lowercost as wood chips and firewood, but need much less handling by the customer than conventionalfirewood. However, if chunkwood is used in a conventional firewood boiler, it needs some handlingby shovel and wheelbarrow. Technical development of handling from the storage to the boiler isneeded. In a somewhat larger scale, e.g. a boiler for apartment blocks or a small district heatingsystem, chunkwood should be very interesting as a replacement of fuel pellets or fuel briquettes. Itwould be interesting with some projects, which in this scale demonstrates the whole system fromthe forest to heat.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis focuses on using photovoltaic produced electricity to power air conditioners in a tropical climate. The study takes place in Surabaya, Indonesia at two different locations the classroom, located at the UBAYA campus and the home office, 10 km away. Indonesia has an average solar irradiation of about 4.8 kWh/m²/day (PWC Indonesia, 2013) which is for ideal conditions for these tests. At the home office, tests were conducted on different photovoltaic systems. A series of measuring devices recorded the performance of the 800 W PV system and the consumption of the 1.35 kW air conditioner (cooling capacity). To have an off grid system many of the components need to be oversized. The inverter has to be oversized to meet the startup load of the air conditioner, which can be 3 to 8 times the operating power (Rozenblat, 2013). High energy consumption of the air conditioner would require a large battery storage to provide one day of autonomy. The PV systems output must at least match the consumption of the air conditioner. A grid connect system provides a much better solution with the 800 W PV system providing 80 % of the 3.5 kWh load of the air conditioner, the other 20 % coming from the grid during periods of low irradiation. In this system the startup load is provided by the grid so the inverter does not need to be oversized. With the grid-connected system, the PV panel’s production does not need to match the consumption of the air conditioner, although a smaller PV array will mean a smaller percentage of the load will be covered by PV. Using the results from the home office tests and results from measurements made in the classroom. Two different PV systems (8 kW and 12 kW) were simulated to power both the current air conditioners (COP 2.78) and new air conditioners (COP 4.0). The payback period of the systems can vary greatly depending on if a feed in tariff is awarded or not. If the feed in tariff is awarded the best system is the 12 kW system, with a payback period of 4.3 years and a levelized cost of energy at -3,334 IDR/kWh. If the feed in tariff is not granted then the 8 kW system is the best choice with a lower payback period and lower levelized cost of energy than the 12 kW system under the same conditions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper studies the influence of hydraulics and control of thermal storage in systems combined with solar thermal and heat pump for the production of warm water and space heating in dwellings. A reference air source heat pump system with flat plate collectors connected to a combistore was defined and modeled together with the IEA SHC Task 44 / HPP Annex 38 (T44A38) “Solar and Heat Pump Systems” boundary conditions of Strasbourg climate and SFH45 building. Three and four pipe connections as well as use of internal and external heat exchangers for DHW preparation were investigated as well as sensor height for charging of the DHW zone in the store. The temperature in this zone was varied to ensure the same DHW comfort was achieved in all cases. The results show that the four pipe connection results in 9% improvement in SPF compared to three pipe and that the external heat exchanger for DHW preparation leads to a 2% improvement compared to the reference case. Additionally the sensor height for charging the DHW zone of the store should not be too low, otherwise system performance is adversely affected

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Objective: For the evaluation of the energetic performance of combined renewable heating systems that supply space heat and domestic hot water for single family houses, dynamic behaviour, component interactions, and control of the system play a crucial role and should be included in test methods. Methods: New dynamic whole system test methods were developed based on “hardware in the loop” concepts. Three similar approaches are described and their differences are discussed. The methods were applied for testing solar thermal systems in combination with fossil fuel boilers (heating oil and natural gas), biomass boilers, and/or heat pumps. Results: All three methods were able to show the performance of combined heating systems under transient operating conditions. The methods often detected unexpected behaviour of the tested system that cannot be detected based on steady state performance tests that are usually applied to single components. Conclusion: Further work will be needed to harmonize the different test methods in order to reach comparable results between the different laboratories. Practice implications: A harmonized approach for whole system tests may lead to new test standards and improve the accuracy of performance prediction as well as reduce the need for field tests.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Dynamic system test methods for heating systems were developed and applied by the institutes SERC and SP from Sweden, INES from France and SPF from Switzerland already before the MacSheep project started. These test methods followed the same principle: a complete heating system – including heat generators, storage, control etc., is installed on the test rig; the test rig software and hardware simulates and emulates the heat load for space heating and domestic hot water of a single family house, while the unit under test has to act autonomously to cover the heat demand during a representative test cycle. Within the work package 2 of the MacSheep project these similar – but different – test methods were harmonized and improved. The work undertaken includes:  • Harmonization of the physical boundaries of the unit under test. • Harmonization of the boundary conditions of climate and load. • Definition of an approach to reach identical space heat load in combination with an autonomous control of the space heat distribution by the unit under test. • Derivation and validation of new six day and a twelve day test profiles for direct extrapolation of test results.   The new harmonized test method combines the advantages of the different methods that existed before the MacSheep project. The new method is a benchmark test, which means that the load for space heating and domestic hot water preparation will be identical for all tested systems, and that the result is representative for the performance of the system over a whole year. Thus, no modelling and simulation of the tested system is needed in order to obtain the benchmark results for a yearly cycle. The method is thus also applicable to products for which simulation models are not available yet. Some of the advantages of the new whole system test method and performance rating compared to the testing and energy rating of single components are:  • Interaction between the different components of a heating system, e.g. storage, solar collector circuit, heat pump, control, etc. are included and evaluated in this test. • Dynamic effects are included and influence the result just as they influence the annual performance in the field. • Heat losses are influencing the results in a more realistic way, since they are evaluated under "real installed" and representative part-load conditions rather than under single component steady state conditions.   The described method is also suited for the development process of new systems, where it replaces time-consuming and costly field testing with the advantage of a higher accuracy of the measured data (compared to the typically used measurement equipment in field tests) and identical, thus comparable boundary conditions. Thus, the method can be used for system optimization in the test bench under realistic operative conditions, i.e. under relevant operating environment in the lab.   This report describes the physical boundaries of the tested systems, as well as the test procedures and the requirements for both the unit under test and the test facility. The new six day and twelve day test profiles are also described as are the validation results.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The main objective for this degree project is to implement an Application Availability Monitoring (AAM) system named Softek EnView for Fujitsu Services. The aim of implementing the AAM system is to proactively identify end user performance problems, such as application and site performance, before the actual end users experience them. No matter how well applications and sites are designed and nomatter how well they meet business requirements, they are useless to the end users if the performance is slow and/or unreliable. It is important for the customers to find out whether the end user problems are caused by the network or application malfunction. The Softek EnView was comprised of the following EnView components: Robot, Monitor, Reporter, Collector and Repository. The implemented system, however, is designed to use only some of these EnView elements: Robot, Reporter and depository. Robots can be placed at any key user location and are dedicated to customers, which means that when the number of customers increases, at the sametime the amount of Robots will increase. To make the AAM system ideal for the company to use, it was integrated with Fujitsu Services’ centralised monitoring system, BMC PATROL Enterprise Manager (PEM). That was actually the reason for deciding to drop the EnView Monitor element. After the system was fully implemented, the AAM system was ready for production. Transactions were (and are) written and deployed on Robots to simulate typical end user actions. These transactions are configured to run with certain intervals, which are defined collectively with customers. While they are driven against customers’ applicationsautomatically, transactions collect availability data and response time data all the time. In case of a failure in transactions, the robot immediately quits the transactionand writes detailed information to a log file about what went wrong and which element failed while going through an application. Then an alert is generated by a BMC PATROL Agent based on this data and is sent to the BMC PEM. Fujitsu Services’ monitoring room receives the alert, reacts to it according to the incident management process in ITIL and by alerting system specialists on critical incidents to resolve problems. As a result of the data gathered by the Robots, weekly reports, which contain detailed statistics and trend analyses of ongoing quality of IT services, is provided for the Customers.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The purpose of this project is to update the tool of Network Traffic Recognition System (NTRS) which is proprietary software of Ericsson AB and Tsinghua University, and to implement the updated tool to finish SIP/VoIP traffic recognition. Basing on the original NTRS, I analyze the traffic recognition principal of NTRS, and redesign the structure and module of the tool according to characteristics of SIP/VoIP traffic, and then finally I program to achieve the upgrade. After the final test with our SIP data trace files in the updated system, a satisfactory result is derived. The result presents that our updated system holds a rate of recognition on a confident level in the SIP session recognition as well as the VoIP call recognition. In the comparison with the software of Wireshark, our updated system has a result which is extremely close to Wireshark’s output, and the working time is much less than Wireshark. In the aspect of practicability, the memory overflow problem is avoided, and the updated system can output the specific information of SIP/VoIP traffic recognition, such as SIP type, SIP state, VoIP state, etc. The upgrade fulfills the demand of this project.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

With the rapid development of telecommunication industry, the IP multimedia Subsystem (IMS) could very well be the panacea for most telecom operators. It is originally defined as the core network for 3G mobile systems by the 3rd Generation Partnership Project (3GPP), the more recent development is merging between fixed line network and wireless networkd This report researchs the characteristic of the IMS data and proposes an IMS characterization analysis. We captured the IMS traffic data with 10 tousands users for about 41 hours. By analyzing the characteristics of the IMS, we know that the most important application in the IMS is VoIP call. Then we use the tool designed by Tsinghua University & Ericsson Company to recognize the data, and the results we got can be used to build the traffic models. From the results of the traffic models, I will get some reasons and conclusion. The traffic model gives out the types of session and types of VoIP call. I bring into a concept—busy hour. This concept is very important because it can help us to know which period is the peak of the VoIP call. The busy hour is from 10:00 to 11:00 in the morning. I also bring into another concept—connection ratio. This concept is significant because it can evaluate whether the VoIP call is good when it use IMS network. By comparing the traffic model with other one’s models, we found the different results from them, both the accuracy and the busy hour. From the contract, we got the advantages of our traffic models.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this thesis the solar part of a large grid-connected photovoltaic system design has been done. The main purpose was to size and optimize the system and to present figures helping to evaluate the prospective project rationality, which can potentially be constructed on a contaminated area in Falun. The methodology consisted in PV market study and component selection, site analysis and defining suitable area for solar installation; and system configuration optimization based on PVsyst simulations and Levelized Cost of Energy calculations. The procedure was mainly divided on two parts, preliminary and detailed sizing. In the first part the objective was complex, which included the investigation of the most profitable component combination and system optimization due to tilt and row distance. It was done by simulating systems with different components and orientations, which were sized for the same 100kW inverter in order to make a fair comparison. For each simulated result a simplified LCOE calculation procedure was applied. The main results of this part show that with the price of 0.43 €/Wp thin-film modules were the most cost effective solution for the case with a great advantage over crystalline type in terms of financial attractiveness. From the results of the preliminary study it was possible to select the optimal system configuration, which was used in the detailed sizing as a starting point. In this part the PVsyst simulations were run, which included full scale system design considering near shadings created by factory buildings. Additionally, more complex procedure of LCOE calculation has been used here considered insurances, maintenance, time value of money and possible cost reduction due to the system size. Two system options were proposed in final results; both cover the same area of 66000 m2. The first one represents an ordinary South faced design with 1.1 MW nominal power, which was optimized for the highest performance. According to PVsyst simulations, this system should produce 1108 MWh/year with the initial investment of 835,000 € and 0.056 €/kWh LCOE. The second option has an alternative East-West orientation, which allows to cover 80% of occupied ground and consequently have 6.6 MW PV nominal power. The system produces 5388 MWh/year costs about 4500,000 € and delivers electricity with the same price of 0.056 €/kWh. Even though the EW solution has 20% lower specific energy production, it benefits mainly from lower relative costs for inverters, mounting and annual maintenance expenses. After analyzing the performance results, among the two alternatives none of the systems showed a clear superiority so there was no optimal system proposed. Both, South and East-West solutions have own advantages and disadvantages in terms of energy production profile, configuration, installation and maintenance. Furthermore, the uncertainty due to cost figures assumptions restricted the results veracity.