2 resultados para Acyclic monoterpene
em Dalarna University College Electronic Archive
Resumo:
The problem of scheduling a parallel program presented by a weighted directed acyclic graph (DAG) to the set of homogeneous processors for minimizing the completion time of the program has been extensively studied as academic optimization problem which occurs in optimizing the execution time of parallel algorithm with parallel computer.In this paper, we propose an application of the Ant Colony Optimization (ACO) to a multiprocessor scheduling problem (MPSP). In the MPSP, no preemption is allowed and each operation demands a setup time on the machines. The problem seeks to compose a schedule that minimizes the total completion time.We therefore rely on heuristics to find solutions since solution methods are not feasible for most problems as such. This novel heuristic searching approach to the multiprocessor based on the ACO algorithm a collection of agents cooperate to effectively explore the search space.A computational experiment is conducted on a suit of benchmark application. By comparing our algorithm result obtained to that of previous heuristic algorithm, it is evince that the ACO algorithm exhibits competitive performance with small error ratio.
Resumo:
In order to achieve the high performance, we need to have an efficient scheduling of a parallelprogram onto the processors in multiprocessor systems that minimizes the entire executiontime. This problem of multiprocessor scheduling can be stated as finding a schedule for ageneral task graph to be executed on a multiprocessor system so that the schedule length can be minimize [10]. This scheduling problem is known to be NP- Hard.In multi processor task scheduling, we have a number of CPU’s on which a number of tasksare to be scheduled that the program’s execution time is minimized. According to [10], thetasks scheduling problem is a key factor for a parallel multiprocessor system to gain betterperformance. A task can be partitioned into a group of subtasks and represented as a DAG(Directed Acyclic Graph), so the problem can be stated as finding a schedule for a DAG to beexecuted in a parallel multiprocessor system so that the schedule can be minimized. Thishelps to reduce processing time and increase processor utilization. The aim of this thesis workis to check and compare the results obtained by Bee Colony algorithm with already generatedbest known results in multi processor task scheduling domain.