36 resultados para Student Response System


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Thesis project is a part of the research conducted in Solar industry. ABSOLICON Solar Concentrator AB has invented and started production of the prospective solar concentrated system Absolicon X10. The aims of this Thesis project are designing, assembling, calibrating and putting in operation the automatic measurement system intended to evaluate distribution of density of solar radiation in the focal line of the concentrated parabolic reflectors and to measure radiation from the artificial source of light being a calibration-testing tool.On the basis of the requirements of the company’s administration and needs of designing the concentrated reflectors the operation conditions for the Sun-Walker were formulated. As the first step, the complex design of the whole system was made and division on the parts was specified. After the preliminary conducted simulation of the functions and operation conditions of the all parts were formulated.As the next steps, the detailed design of all the parts was made. Most components were ordered from respective companies. Some of the mechanical components were made in the workshop of the company. All parts of the Sun-Walker were assembled and tested. The software part, which controls the Sun-Walker work and conducts measurements of solar irradiation, was created on the LabVIEW basis. To tune and test the software part, the special simulator was designed and assembled.When all parts were assembled in the complete system, the Sun-Walker was tested, calibrated and tuned.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report describes work on the thesis “IT systems and organizational development”. The work is carried out on Stocksbro Energi AB, during spring 2009. The company wanted better flow in their production but also review if the inventory management function located in Visma SPCS Administration 2000, could be used in the organization. Under the first part of this report the system were tested to ensure if the system would work together with the organization. After testing the desired features they were evaluated along with two of the users to the system at the company. The wanted functions could not be obtained whenthe Admin 2000 is an economic system and are not made for the producing companies. Thereafter the theoretical possibility was examined of introducing a more advanced system to get the desired functionality to work together with the organization. To introduce a more advanced system will require major changes of the organization, before, during and after the introduction. It is therefore important how the management implements a possibility of a new system. It’s important to make the staff join in this implementation but also get as much as possible out of the system.To conclude the thesis a goal and problem analysis but also a solution proposal was made with the help of the FA/SIMM method. Also some suggestions are mentioned how the company could proceed in the implementation of the proposals for a solution.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Today, there are no standardized ways to characterize SOA, many are talking about SOA and many say they are using SOA. One way that we have chosen to characterize this phenomenon is through an evaluation that will indicate whether SOA have been used in the development. Basedon a Service Oriented Architecture literature study, we have created an evaluation pattern resulting SOA principles of integration, architecture and services. This evaluation was applied to Logica's own integration system AgrCom through an empirical study to result in a response indicating whether AgrCom is SOA based. The results of the evaluation show that AgrCom is part of an SOA solution but not an SOA as a whole concept. The study shows that it takes morethan just systems in an activity to be referred to as the SOA-based, hence the architecture of anactivity must be taken into account.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy efficiency and renewable energy use are two main priorities leading to industrial sustainability nowadays according to European Steel Technology Platform (ESTP). Modernization efforts can be done by industries to improve energy consumptions of the production lines. These days, steel making industrial applications are energy and emission intensive. It was estimated that over the past years, energy consumption and corresponding CO2 generation has increased steadily reaching approximately 338.15 parts per million in august 2010 [1]. These kinds of facts and statistics have introduced a lot of room for improvement in energy efficiency for industrial applications through modernization and use of renewable energy sources such as solar Photovoltaic Systems (PV).The purpose of this thesis work is to make a preliminary design and simulation of the solar photovoltaic system which would attempt to cover the energy demand of the initial part of the pickling line hydraulic system at the SSAB steel plant. For this purpose, the energy consumptions of this hydraulic system would be studied and evaluated and a general analysis of the hydraulic and control components performance would be done which would yield a proper set of guidelines contributing towards future energy savings. The results of the energy efficiency analysis showed that the initial part of the pickling line hydraulic system worked with a low efficiency of 3.3%. Results of general analysis showed that hydraulic accumulators of 650 liter size should be used by the initial part pickling line system in combination with a one pump delivery of 100 l/min. Based on this, one PV system can deliver energy to an AC motor-pump set covering 17.6% of total energy and another PV system can supply a DC hydraulic pump substituting 26.7% of the demand. The first system used 290 m2 area of the roof and was sized as 40 kWp, the second used 109 m2 and was sized as 15.2 kWp. It was concluded that the reason for the low efficiency was the oversized design of the system. Incremental modernization efforts could help to improve the hydraulic system energy efficiency and make the design of the solar photovoltaic system realistically possible. Two types of PV systems where analyzed in the thesis work. A method was found calculating the load simulation sequence based on the energy efficiency studies to help in the PV system simulations. Hydraulic accumulators integrated into the pickling line worked as energy storage when being charged by the PV system as well.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The project introduces an application using computer vision for Hand gesture recognition. A camera records a live video stream, from which a snapshot is taken with the help of interface. The system is trained for each type of count hand gestures (one, two, three, four, and five) at least once. After that a test gesture is given to it and the system tries to recognize it.A research was carried out on a number of algorithms that could best differentiate a hand gesture. It was found that the diagonal sum algorithm gave the highest accuracy rate. In the preprocessing phase, a self-developed algorithm removes the background of each training gesture. After that the image is converted into a binary image and the sums of all diagonal elements of the picture are taken. This sum helps us in differentiating and classifying different hand gestures.Previous systems have used data gloves or markers for input in the system. I have no such constraints for using the system. The user can give hand gestures in view of the camera naturally. A completely robust hand gesture recognition system is still under heavy research and development; the implemented system serves as an extendible foundation for future work.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Syftet med examensarbetet är att studera den subsynkrona interaktionen (subsynchronous torsional interaktion, SSTI) mellan ett HVDC system med spänningsstyva strömriktare och en närliggande generator. Studien utförs med hjälp av datorsimuleringar och fokuserar på att studera dämpkaraktäristiken för SSTI. Studien ska visa hur faktorer såsom den överförda effektens storlek och riktning, vald driftmod och kraftsystemets kortslutningseffekt påverkar dämpkaraktäristiken. Rapporten beskriver subsynkron oscillation (SSO) och tillvägagångssättet vid en SSTI undersökning. En kort introduktion till HVDC Light ges. Studien visar att HVDC Light ökar dämpningen för det frekvensområde som är intressant. Resultaten presenteras som diagram med beräknad dämpkaraktäristik.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Det svenska järnvägsområdet är sedan 1990-talet under stark omdaning med en ökad marknadsmedvetenhet, förändrad lagstiftning och harmonisering av Europas järnvägssystem. Järnvägsstyrelsen är en relativt ny myndighet som tillkommit som ett resultat av dessa förändringar. Järnvägsstyrelsens uppgift är huvudsakligen att tillse att järnvägsmarknaden är effektiv med likvärdiga villkor och en sund konkurrens men även att järnvägsmarknaden har hög säkerhet för medborgarna och näringslivet. Införande av EU-lagstiftning såsom andra järnvägspaketet är exempel på pågående förändringar inom järnvägsområdets säkerhetshantering där Järnvägsstyrelsens roll som säkerhetsmyndighet stärks och renodlas. Förändringarna innebär bland annat att Järnvägsstyrelsen skall sluta utreda orsaken till olyckor och tillbud. Säkerhetsmyndighetens uppgift är att övervaka säkerheten i järnvägssystemen och om säkerhetsmyndigheten utreder orsaker till inträffade olyckor och tillbud kan en jävsituation uppstå. Ytterligare förändring som föreslås innebär att Järnvägsstyrelsen skall beskriva den nationella säkerhetsnivån i en årlig rapport som skall lämnas till EU och regeringen. För detta behöver mer information om inträffade säkerhetsrelaterade händelser samlas in. Nämnda förändringar, som troligtvis kommer att införas i svensk rätt under 2007, är upphovet till denna rapport eftersom de påverkar Järnvägsstyrelsens organisation och arbetssätt. Behovet av att utreda inträffade olyckor och tillbud förändras när den lagliga grunden för uppdraget upphör att gälla. Mer information om inträffade händelser behöver samlas in och detta påverkar inte bara Järnvägsstyrelsen utan även verksamhetsutövarna genom att de får ökade krav att tillhandahålla uppgifter om inträffade händelser. I verksamhetsplanen för 2006 har Järnvägsstyrelsen fastställt att Järnvägsstyrelsens bärande idé är riskbaserad tillsyn vilket också har stor påverkan på utvecklingen av nya arbetsmetoder. De frågeställningar som behandlas i rapporten och som återknyter till ovanstående resonemang är: 1. Hur påverkar de nya kraven Järnvägsstyrelsens organisation och arbetssätt, med fokus på olycksutredningarna? 2. Hur skall Järnvägsstyrelsen arbeta med riskbaserad tillsyn – vilken påverkan får det på organisation och arbetsmetoder? 3. Vilken information skall Järnvägsstyrelsen samla in? 4. Hur skall insamling ske? Denna rapport lämnar förslag på nya och förändrade processer, bl.a. skapande av en analysprocess och intern samordning av Järnvägsstyrelsens tillsynsaktiviteter. I utredningen föreslås även utbildning i riskanalys för att bidra till utvecklingen av ett riskbaserat arbetssätt. Efter inventering av Järnvägsstyrelsens informationsbehov, kartläggning av några verksamhetsutövares befintliga organisation och system för rapportering av inträffade händelser, analyseras Järnvägsstyrelsens samverkanssituation för att utröna vilken relation Järnvässtyrelsen har till verksamhetsutövarna i detta sammanhang. Rapporten avslutas med en systembeskrivning för ett informationssystem med uppgifter om inträffade händelser. I systembeskrivningen förs även ett resonemang kring alternativa rapporteringssätt och här finns öppenhet för olika tekniska lösningar.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The main aim of this project is to develop an ESES lab on a full scale system. The solar combisystem used is available most of the time and is only used twice a year to carry out some technical courses. At the moment, there are no other laboratories about combisystems. The experiments were designed in a way to use the system to the most in order to help the students apply the theoretical knowledge in the solar thermal course as well as make them more familiar with solar systems components. The method adopted to reach this aim is to carry out several test sequences on the system, in order to help formulating at the end some educating experiments. A few tests were carried out at the beginning of the project just for the sake of understanding the system and figuring out if any additional measuring equipment is required. The level of these tests sequences was varying from a simple energy draw off or collector loop controller respond tests to more complicated tests, such as the use of the ‘collector’ heater to simulate the solar collector effect on the system. The tests results were compared and verified with the theoretical data wherever relevant. The results of the experiment about the use of the ‘collector’ heater instead of the collector were positively acceptable. Finally, the Lab guide was developed based on the results of these experiments and also the experience gotten while conducting them. The lab work covers the theories related to solar systems in general and combisystems in particular. 

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This master thesis presents a new technological combination of two environmentally friendly sources of energy in order to provide DHW, and space heating. Solar energy is used for space heating, and DHW production using PV modules which supply direct current directly to electrical heating elements inside a water storage tank. On the other hand a GSHP system as another source of renewable energy provides heat in the water storage tank of the system in order to provide DHW and space heating. These two sources of renewable energy have been combined in this case-study in order to obtain a more efficient system, which will reduce the amount of electricity consumed by the GSHP system.The key aim of this study is to make simulations, and calculations of the amount ofelectrical energy that can be expected to be produced by a certain amount of PV modules that are already assembled on a house in Vantaa, southern Finland. This energy is then intended to be used as a complement to produce hot water in the heating system of the house beside the original GSHP system. Thus the amount of electrical energy purchased from the grid should be reduced and the compressor in the GSHP would need fewer starts which would reduce the heating cost of the GSHP system for space heating and providing hot water.The produced energy by the PV arrays in three different circuits will be charged directly to three electrical heating elements in the water storage tank of the existing system to satisfy the demand of the heating elements. The excess energy can be used to heat the water in the water storage tank to some extent which leads to a reduction of electricity consumption by the different components of the GSHP system.To increase the efficiency of the existing hybrid system, optimization of different PV configurations have been accomplished, and the results are compared. Optimization of the arrays in southern and western walls shows a DC power increase of 298 kWh/year compared with the existing PV configurations. Comparing the results from the optimization of the arrays on the western roof if the intention is to feed AC power to the components of the GSHP system shows a yearly AC power production of 1,646 kWh.This is with the consideration of no overproduction by the PV modules during the summer months. This means the optimized PV systems will be able to cover a larger part of summer demand compared with the existing system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report presents a new way of control engineering. Dc motor speed controlled by three controllers PID, pole placement and Fuzzy controller and discusses the advantages and disadvantages of each controller for different conditions under loaded and unloaded scenarios using software Matlab. The brushless series wound Dc motor is very popular in industrial application and control systems because of the high torque density, high efficiency and small size. First suitable equations are developed for DC motor. PID controller is developed and tuned in order to get faster step response. The simulation results of PID controller provide very good results and the controller is further tuned in order to decrease its overshoot error which is common in PID controllers. Further it is purposed that in industrial environment these controllers are better than others controllers as PID controllers are easy to tuned and cheap. Pole placement controller is the best example of control engineering. An addition of integrator reduced the noise disturbances in pole placement controller and this makes it a good choice for industrial applications. The fuzzy controller is introduce with a DC chopper to make the DC motor speed control smooth and almost no steady state error is observed. Another advantage is achieved in fuzzy controller that the simulations of three different controllers are compared and concluded from the results that Fuzzy controller outperforms to PID controller in terms of steady state error and smooth step response. While Pole placement controller have no comparison in terms of controls because designer can change the step response according to nature of control systems, so this controller provide wide range of control over a system. Poles location change the step response in a sense that if poles are near to origin then step response of motor is fast. Finally a GUI of these three controllers are developed which allow the user to select any controller and change its parameters according to the situation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The work presented in this thesis concerns the dimensioning of an Energy Storage System (ESS) which will be used as an energy buffer for a grid-connected PV plant. This ESS should help managing the PV plant to inject electricity into the grid according to the requirements of the grid System Operator. It is desired to obtain a final production not below 1300kWh/kWp with a maximum ESS budget of 0.9€/Wp. The PV plant will be sited in Martinique Island and connected to the main grid. This grid is a small one where the perturbations due clouds in the PV generation are not negligible anymore. A software simulation tool, incorporating a model for the PV-plant production, the ESS and the required injection pattern of electricity into the grid has been developed in MS Excel. This tool has been used to optimize the relevant parameters defining the ESS so that the feed-in of electricity into the grid can be controlled to fulfill the conditions given by the System Operator. The inputs used for this simulation tool are, besides the conditions given by the System Operator on the allowed injection pattern, the production data from a similar PV-plant in a close-by location, and variables for defining the ESS. The PV production data used is from a site with similar climate and weather conditions as for the site on the Martinique Island and hence gives information on the short term insolation variations as well as expected annual electricity production. The ESS capacity and the injected electric energy will be the main figures to compare while doing an economic study of the whole plant. Hence, the Net Present Value, Benefit to Cost method and Pay-back period studies are carried on as dependent of the ESS capacity. The conclusion of this work is that it is possible to obtain the requested injection pattern by using an ESS. The design of the ESS can be made within an acceptable budget. The capacity of ESS to link with the PV system depends on the priorities of the final output characteristics, and it also depends on which economic parameter that is chosen as a priority.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Projektet omfattade en jämförelsestudie avseende stomsystem. Studien undersökte ramverk och fackverk/balk/pelar-system och genomfördes självständigt med stöttning av Ramböll AB´s kontor i Falun. Syftet var främst att undersöka vilka skillnader det finns mellan tvåledsramar och fackverk/balk/pelar-system för lätta hallbyggnader och försöka få klarhet i varför fackverk/balk/pelar-system är det dominerande systemet i Sverige eftersom övriga Europa har tagit en annan utveckling och domineras av tvåledsramar. Studien undersöker skillnaderna mellan systemen i en hallbyggnad med förutbestämda mått i stål.Inledningsvis gjordes en litteraturstudie för att få en bredare bakgrund av systemen och en bättre förståelse om förutsättningarna för varje system. Efter litteraturstudien kunde sedan ett typhus och beräkningsunderlag för jämförelsestudien tas fram. Även en enkätstudie gjordes med syftet att skapa en tydlig bild av vilket stomsystem konstruktörer i Sverige oftast väljer och varför. Resultatet av studien visade att tvåledsramar ger en ökad kostnad jämfört med fackverk/balk/pelar-system i materialåtgång och framställning samt att beräkningarna blir mer komplicerade. Skulle fortsatta studier göras med dessa system i byggnader med andra mått skulle det kanske gå att få fram speciella mått på byggnader där kostnaden för tvåledsramar blir densamma som för fackverk/balk/pelar-system och därför är ett likvärdigt alternativ som stomsystem.En viktig slutsats från projektet är att tvåledsramar används mycket mer sällan än fackverk/balk/pelar-system som stomsystem i lätta hallbyggnader i Sverige på grund av att kostnaderna blir mycket högre med tvåledsramar och att det är ett mer komplicerat system i beräkningsarbetet. De viktigaste slutsatserna från jämförelsestudien går att sammafatta som följande: Tvåledsramar är dyrare att använda. Tvåledsramar är ett mer komplicerat system beräkningsmässigt. Traditionen av att använda tvåledsramar finns inte och därför används inte systemet.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the main aims of this thesis is to design an optimized commercial Photovoltaic (PV) system in Barbados from several variables such as racking type, module type and inverter type based on practicality, technical performance as well as financial returns to the client. Detailed simulations are done in PVSYST and financial models are used to compare different systems and their viability. Once the preeminent system is determined from a financial and performance perspective a detailed design is done using PVSYST and AutoCAD to design the most optimal PV system for the customer. In doing so, suitable engineering drawings are generated which are detailed enough for construction of the system. Detailed cost with quotes from relevant manufacturers, suppliers and estimators become instrumental in determining Balance of System Costs in addition to total project cost. The final simulated system is suggested with a PV capacity of 425kW and an inverter output of 300kW resulting in an array oversizing of 1.42. The PV system has a weighted Performance Ratio of 77 %, a specific yield of 1467 kWh/kWp and a projected annual production of 624 MWh/yr. This system is estimated to offset approximately 28 % of Carlton’s electrical load annually. Over the course of 20 years the PV system is projected to produce electricity at a cost of $0.201USD/kWh which is significantly lower than the $0.35 USD/kWh paid to the utility at the time of writing this thesis. Due to the high cost of electricity on the island, an attractive Feed-In-Tariff is not necessary to warrant the installation of a commercial System which over a lifetime which produces electricity at less than 60% of the cost to the user purchasing electricity from the utility. A simple payback period of 5.4 years, a return on investment of 17 % without incentives, in addition to an estimated diversion of 6840 barrels of oil or 2168 tonnes of CO2 further provides compelling justification for the installation of a commercial Photovoltaic System not only on Carlton A-1 Supermarket, but also island wide as well as regionally where most electricity supplies are from imported fossil fuels.