112 resultados para engineering projects management
Resumo:
This paper reports part of a qualitative study into evolving practice in the implementation of the Dispute Adjudication Board (DAB) construction dispute resolution technique, a variant of the Dispute Review Board (DRB) concept used in the US and Canada. Data was collected through a focus group interview of 20 highly experienced dispute resolution practitioners from engineering and the law. The group was assembled from members of FIDIC-NET with direct experience of project DABs. The part reported here concerns practice and procedure for establishing DABs. The main findings are that: constitution of the DABs is often delayed because of either project owners' ignorance of the DAB process or deterrence by the cost of the DABs; such owners also tend to insist on appointing DAB members from local engineers and lawyers without sufficient understanding of the DAB process; rates of remuneration of DAB members vary widely; the training provision for DAB membership and advocacy skills is inadequate; the process of selecting candidates for DAB membership and negotiating the tripartite agreement between each member and the contractual parties needs to be navigated with great care to avoid raising ethical problems. The research contribution is threefold. First, it highlights the importance of realistic fees for DAB members within a standard framework in achieving timely establishment of a board that works well as a team. Second, it illustrates the use of qualitative focus group interview to study the impact of new contract terms from multiple stakeholder perspectives. Finally, it identifies areas where further research is needed.
Resumo:
Whole-life thinking for engineers working on the built environment has become more important in a fast changing world.Engineers are increasingly concerned with complex systems, in which the parts interact with each other and with the outside world in many ways – the relationships between the parts determine how the system behaves. Systems thinking provides one approach to developing a more robust whole life approach. Systems thinking is a process of understanding how things influence one another within a wider perspective. Complexity, chaos, and risk are endemic in all major projects. New approaches are needed to produce more reliable whole life predictions. Best value, rather than lowest cost can be achieved by using whole-life appraisal as part of the design and delivery strategy.
Resumo:
The UK government is mandating the use of building information modelling (BIM) in large public projects by 2016. As a result, engineering firms are faced with challenges related to embedding new technologies and associated working practices for the digital delivery of major infrastructure projects. Diffusion of innovations theory is used to investigate how digital innovations diffuse across complex firms. A contextualist approach is employed through an in-depth case study of a large, international engineering project-based firm. The analysis of the empirical data, which was collected over a four-year period of close interaction with the firm, reveals parallel paths of diffusion occurring across the firm, where both the innovation and the firm context were continually changing. The diffusion process is traced over three phases: centralization of technology management, standardization of digital working practices, and globalization of digital resources. The findings describe the diffusion of a digital innovation as multiple and partial within a complex social system during times of change and organizational uncertainty, thereby contributing to diffusion of innovations studies in construction by showing a range of activities and dynamics of a non-linear diffusion process.
Resumo:
This article describes a new application of key psychological concepts in the area of Sociometry for the selection of workers within organizations in which projects are developed. The project manager can use a new procedure to determine which individuals should be chosen from a given pool of resources and how to combine them into one or several simultaneous groups/projects in order to assure the highest possible overall work efficiency from the standpoint of social interaction. The optimization process was carried out by means of matrix calculations performed using a computer or even manually, and based on a number of new ratios generated ad-hoc and composed on the basis of indices frequently used in Sociometry.
Resumo:
Current research agendas are increasingly encouraging the construction industry to operate on the basis of 'added value'. Such debates echo the established concept of 'high value manufacturing' and associated trends towards servitization. Within construction, the so-called 'value agenda' draws heavily from the notion of integrated solutions. This is held to be especially appropriate in the context of PFI projects. Also relevant is the concept of service-led projects whereby the project rationale is driven by the client's objectives for delivering an enhanced service to its own customers. Such ideas are contextualized by a consideration of broader trends of privatization and outsourcing within and across the construction industry's client base. The current emphasis on integrated solutions reflects long-term trends within privatized client organizations towards the outsourcing of asset management capabilities. However, such trends are by no means uniform or consistent. An in-depth case study of three operating divisions within a major construction company illustrates that firms are unlikely to reorientate their business in response to the 'value agenda'. In the case of PFI, the tendency has been to establish specialist units for the purposes of winning work. Meanwhile, institutionally embedded operating routines within the rest of the business remain broadly unaffected.
Resumo:
This paper explores the apparent contradiction between the 'linearity' of most Sustainable Development projects, with time-bound and defined outputs achieved at a fixed cost, and an implied 'circularity' of the theory whereby there is no 'end'. Projects usually have clear parameters within which they are implemented, and the inclusion of elements such as the need for accountability, measurable impact and,value for money' have grown in importance. It could be argued that we live in a 'projectified' and therefore linear world. The paper explores the potential contradiction between 'linearity' and 'circularity', and suggests that one way around this is to frame the project within a form of the Kolb Learning Cycle heuristic. This will facilitate a rationalisation from those implementing the sustainable development project as to why decisions are being made and for whom. If these questions are opened up to the project stakeholders, including beneficiaries, then the Kolb cycle could encourage learning and understanding by all involved. It could also provide Sustainability Therapy to those trapped in processes, which they find orthogonal to their own perceptions. It is suggested that such learning, therapy and reflective practice should be a valid output of the sustainable development project, although typically the focus is only upon the final outputs and how they feed into policy. Ironically funders would be well advised to take a broader perspective in order to achieve true 'value for money' within such projects, even if learning is not an easily measurable or tangible outcome. These points are explored within the context of the wider literature and experience with a sustainable development project undertaken in Malta. (c) 2005 Elsevier Ltd. All rights reserved.
Resumo:
The two earliest structures of Minoan Crete that may be considered as large cisterns were both built in the first half of the second millennium BC (the time of the first Minoan palaces) at Myrtos-Pyrgos (lerapetra). A considerable feat of engineering and social management, they remain a most unusual attribute of a Minoan settlement, all the more so since the Myrtos river is/was available to supply water at the foot of the hill of Pyrgos. This paper presents these cisterns, briefly, in terms of geology and technology, the history of their use and re-use, and their relevance to understanding the culture and society (at local and regional levels) of Crete in the time of the Old Palaces, as well as their possible contribution to the political and military history of the period. I then review possible precursors of, and architectural parallels to, the Pyrgos cisterns at Knossos, Malia and Phaistos (none of which has been proved to be a cistern), and the later history of cisterns in Bronze Age Crete. Since only three others are known (at Archanes, Zakro and Tylissos, of Late Bronze Age date), the two cisterns of Myrtos-Pyrgos are an important addition to our still rudimentary knowledge of how the Bronze Age Cretans managed their water supplies.
Resumo:
A systematic technique for identifying the environments of construction projects is described. It provides a method for isolating the major variables surrounding construction projects, and is briefly applied to the industries of Britain and Jamaica to illustrate its application. From this, it is inferred that the environment of a Jamaican construction project in systems terms is broadly similar to the environment of a construction project in Britain.
Resumo:
An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable annual updates to the abstracts. Each annual update will carry cumulative indexes, so that only one index needs to be consulted.
Resumo:
This book is aimed primarily at students for whom the study of building or civil engineering contracts forms part of a construction-based course. We have had in mind the syllabus requirements for first degrees in Building, Civil Engineering, Architecture, Quantity Surveying and Building Surveying, as well as those of postgraduate courses in Construction Management and Project Management. We have also assumed that such students will already have been introduced to the general principles of English law, especially those relating to contract and tort. As a result, while aspects of those subjects that are of particular relevance to construction are dealt with here, the reader must look elsewhere for the general legal background. In producing this third edition, we have again been greatly assisted by the many helpful comments made by reviewers and users of its predecessor. Nonetheless, our basic aim is identical to that which underpinned the first edition: to provide an explanation of the fundamental principles of construction contract law, rather than a clause-by-clause analysis of any particular standard-form contract. As a result, while we draw most frequently upon JCT 98 for our illustrations of particular points, this merely reflects the pre-eminent position occupied by that particular form of contract in the UK construction industry. We conclude by repeating our previous warning as to the dangers inherent in a little learning. Neither this book, nor the courses for which it is intended, seek to produce construction lawyers. The objective is rather to enable those who are not lawyers to resolve simple construction disputes before they become litigious, and to recognize when matters require professional legal advice. It should be the aim of every construction student to understand the legal framework sufficiently that they can instruct and brief specialist lawyers, and this book is designed to help them towards that understanding.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • Journal of Construction Research (JCR) • Journal of Financial Management in Property and Construction (JFM) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable annual updates to the abstracts. Each annual update will carry cumulative indexes, so that only one index needs to be consulted.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. This volume brings together articles published during 1999. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable rapid reference to articles. A cumulative volume is available from the editor. Included in this volume is an appendix listing a wide range of journals associated with construction management research, giving details of frequency, editorial addresses and web sites, as well as whether each journal is international and/or refereed.
Resumo:
Standard form contracts are typically developed through a negotiated consensus, unless they are proffered by one specific interest group. Previously published plans of work and other descriptions of the processes in construction projects tend to focus on operational issues, or they tend to be prepared from the point of view of one or other of the dominant interest groups. Legal practice in the UK permits those who draft contracts to define their terms as they choose. There are no definitive rulings from the courts that give an indication as to the detailed responsibilities of project participants. The science of terminology offers useful guidance for discovering and describing terms and their meanings in their practical context, but has never been used for defining terms for responsibilities of participants in the construction project management process. Organizational analysis enables the management task to be deconstructed into its elemental parts in order that effective organizational structures can be developed. Organizational mapping offers a useful technique for reducing text-based descriptions of project management roles and responsibilities to a comparable basis. Research was carried out by means of a desk study, detailed analysis of nine plans of work and focus groups representing all aspects of the construction industry. No published plan of work offers definitive guidance. There is an enormous amount of variety in the way that terms are used for identifying responsibilities of project participants. A catalogue of concepts and terms (a “Terminology”) has been compiled and indexed to enable those who draft contracts to choose the most appropriate titles for project participants. The purpose of this terminology is to enable the selection and justification of appropriate terms in order to help define roles. The terminology brings an unprecedented clarity to the description of roles and responsibilities in construction projects and, as such, will be helpful for anyone seeking to assemble a team and specify roles for project participants.
Resumo:
This paper describes a technique that can be used as part of a simple and practical agile method for requirements engineering. The technique can be used together with Agile Programming to develop software in internet time. We illustrate the technique and introduce lazy refinement, responsibility composition and context sketching. Goal sketching has been used in a number of real-world development projects, one of which is described here.