37 resultados para Project Read and Write
Resumo:
The process of how contractors take account of risk when calculating their bids for construction work is investigated based on preliminary investigations and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which the contractors operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.
Resumo:
Services are very important to the UK balance of trade; a surplus has been recorded for trade in services every year since 1966. Construction professional services exports (CPS), which cover architecture, engineering and surveying (AES), have also increased, contributing over £3bn to the UK trade balance in 2007. The changing environment of construction professional services exports complicates the validity of the characteristics and definitions of services as described in the research literature and official export statistics. Through semi-structured interviews undertaken with large consulting engineers and a round-table discussion with industry and government representatives, the research found that the impact of globalisation and the changes in the construction business environment, such as increasing foreign ownership and changing forms of procurement, are not fully reflected in the official statistics. There have also been rapid changes in technology, procurement and methods of delivery which have impacted exporting AES firms and a more appropriate set of characteristics is needed to better reflect the project-specific and knowledge-intensive nature of AES firms.
Resumo:
Background: Several authors have highlighted areas of overlap in symptoms and impairment among children with autism spectrum disorder (ASD) and children with specific language impairment (SLI). By contrast, loss of language and broadly defined regression have been reported as relatively specific to autism. We compare the incidence of language loss and language progression of children with autism and SLI. Methods: We used two complementary studies: the Special Needs and Autism Project (SNAP) and the Manchester Language Study (MLS) involving children with SLI. This yielded a combined sample of 368 children (305 males and 63 females) assessed in late childhood for autism, history of language loss, epilepsy, language abilities and nonverbal IQ. Results: language loss occurred in just 1% of children with SLI but in 15% of children classified as having autism or autism spectrum disorder. Loss was more common among children with autism rather than milder ASD and is much less frequently reported when language development is delayed. For children who lost language skills before their first phrases, the phrased speech milestone was postponed but long-term language skills were not significantly lower than children with autism but without loss. For the few who experienced language loss after acquiring phrased speech, subsequent cognitive performance is more uncertain. Conclusions: Language loss is highly specific to ASD. The underlying developmental abnormality may be more prevalent than raw data might suggest, its possible presence being hidden for children whose language development is delayed.
Resumo:
In the emerging digital economy, the management of information in aerospace and construction organisations is facing a particular challenge due to the ever-increasing volume of information and the extensive use of information and communication technologies (ICTs). This paper addresses the problems of information overload and the value of information in both industries by providing some cross-disciplinary insights. In particular it identifies major issues and challenges in the current information evaluation practice in these two industries. Interviews were conducted to get a spectrum of industrial perspectives (director/strategic, project management and ICT/document management) on these issues in particular to information storage and retrieval strategies and the contrasting approaches to knowledge and information management of personalisation and codification. Industry feedback was collected by a follow-up workshop to strengthen the findings of the research. An information-handling agenda is outlined for the development of a future Information Evaluation Methodology (IEM) which could facilitate the practice of the codification of high-value information in order to support through-life knowledge and information management (K&IM) practice.
Resumo:
There are a number of challenges associated with managing knowledge and information in construction organizations delivering major capital assets. These include the ever-increasing volumes of information, losing people because of retirement or competitors, the continuously changing nature of information, lack of methods on eliciting useful knowledge, development of new information technologies and changes in management and innovation practices. Existing tools and methodologies for valuing intangible assets in fields such as engineering, project management and financial, accounting, do not address fully the issues associated with the valuation of information and knowledge. Information is rarely recorded in a way that a document can be valued, when either produced or subsequently retrieved and re-used. In addition there is a wealth of tacit personal knowledge which, if codified into documentary information, may prove to be very valuable to operators of the finished asset or future designers. This paper addresses the problem of information overload and identifies the differences between data, information and knowledge. An exploratory study was conducted with a leading construction consultant examining three perspectives (business, project management and document management) by structured interviews and specifically how to value information in practical terms. Major challenges in information management are identified. An through-life Information Evaluation methodology (IEM) is presented to reduce information overload and to make the information more valuable in the future.
Resumo:
This paper reviews the growing interest in an integrated construction project model, and examines the fundamental concept of an integrated project model by discussing the various definitions that have evolved as well as the various approaches to its development. The nature of collaborative communications that the integrated project model needs to support is also discussed, as are the enabling information and communications technologies that may have a role in the realization of the model. The paper concludes with some thoughts on the future development of the integrated construction project model.
Resumo:
The Clean Development Mechanism (CDM) has successfully demonstrated that market-based mechanisms can achieve some cost effective emissions reductions in developing countries. However the distribution of CDM projects has been extremely uneven across countries and regions, and a few technologies and sectors have dominated the early stages of CDM experience. This has caused some to question whether the CDM has fallen short of its potential in contributing to sustainable development. We review the broad patterns of CDM project approvals and evaluate 10 CDM projects according to their sustainability benefits. The difficulty of defining “sustainable development” and the process of defining criteria by individual non-Annex 1 governments has meant that sustainable development concerns have been marginalized in some countries. Given these observed limitations, we present possible CDM policy futures, focusing on the main proposals for a post-2012 climate regime. Five options for enhancing the sustainable development benefits in the CDM are discussed, including proactive approaches to favour eligibility of emission reduction projects which ensure such co-benefits.
Resumo:
Unhealthy diets can lead to various diseases, which in turn can translate into a bigger burden for the state in the form of health services and lost production. Obesity alone has enormous costs and claims thousands of lives every year. Although diet quality in the European Union has improved across countries, it still falls well short of conformity with the World Health Organization dietary guidelines. In this review, we classify types of policy interventions addressing healthy eating and identify through a literature review what specific policy interventions are better suited to improve diets. Policy interventions are classified into two broad categories: information measures and measures targeting the market environment. Using this classification, we summarize a number of previous systematic reviews, academic papers, and institutional reports and draw some conclusions about their effectiveness. Of the information measures, policy interventions aimed at reducing or banning unhealthy food advertisements generally have had a weak positive effect on improving diets, while public information campaigns have been successful in raising awareness of unhealthy eating but have failed to translate the message into action. Nutritional labeling allows for informed choice. However, informed choice is not necessarily healthier; knowing or being able to read and interpret nutritional labeling on food purchased does not necessarily result in consumption of healthier foods. Interventions targeting the market environment, such as fiscal measures and nutrient, food, and diet standards, are rarer and generally more effective, though more intrusive. Overall, we conclude that measures to support informed choice have a mixed and limited record of success. On the other hand, measures to target the market environment are more intrusive but may be more effective.
Resumo:
Hospitals represent complex and difficult contexts for AEC (architecture, engineering and construction) professionals to engage with due to their functional complexity and diversity of stakeholder interests (i.e. patient, visitor, medical specialist). Hospital designers need to take note of changing NHS policy contexts (e.g. the possible empowerment of general practitioners to shape services), technological advances in medical equipment design and the potential health needs of future generations. It is imperative for hospital designers and architects to align their processes and methodologies (e.g. briefing and requirements capture) to the needs and desires of their clients so that a medical facility design is produced which is truly aligned to the requirements of the hospital stakeholders. Semiotics, the “study” or “discipline” of signs aims to investigate the nature of signs (their inception, representation and meaning), whilst semiotics-rooted theories are concerned with investigating how meaning and understanding is mobilized between persons and between organisations. This paper details a semiotics-rooted research approach for investigating the interactions between hospital designers and stakeholders on a forthcoming NHS hospital project in the UK. A semiotics grounded study will potentially provide a deeper understanding of how meaning and understanding is established between hospital project stakeholders and construction professionals.
Resumo:
FAMOUS is an ocean-atmosphere general circulation model of low resolution, based on version 4.5 of the UK MetOffice Unified Model. Here we update the model description to account for changes in the model as it is used in the CMIP5 EMIC model intercomparison project (EMICmip) and a number of other studies. Most of these changes correct errors found in the code. The EMICmip version of the model (XFXWB) has a better-conserved water budget and additional cooling in some high latitude areas, but otherwise has a similar climatology to previous versions of FAMOUS. A variant of XFXWB is also described, with changes to the dynamics at the top of the model which improve the model climatology (XFHCC).
Resumo:
Individual-level constructs are seldom taken into consideration in construction management research relating to project performance. This is antithetical to the objectives of properly conceptualizing and contextualizing the research we do because many project performance outcomes, such as the extent of cooperation and level of communication or teamwork are influenced and moderated by individuals’ perceptions, values and behaviour. A brief review of the literature in organizational studies centred on culture, identity, empowerment and trust is offered. These constructs are then explored in relation to project performance issues and outcomes, and it is noted that they are predominantly studied at the project and industry levels. We argue that focusing these constructs at the individual unit of analysis has significant implications for project performance and therefore their effects need to be systematically accounted for in explanations of the success and failure of projects. Far from being prescriptive, the aim is to generate interest and awareness for more focused research at the individual level of analysis in order to add new insights and perspectives to critical performance questions in construction management. To this end, a research agenda is outlined, arguing that construction management research integrating individual-level constructs and broader, macro-contextual issues will help define and enhance the legitimacy of the field.
Resumo:
Fieldwork in a major construction programme is used to examine what is meant by professionalism where large integrated digital systems are used to design, deliver, and maintain buildings and infrastructure. The increasing ‘professionalization’ of the client is found to change other professional roles and interactions in project delivery. New technologies for approvals and workflow monitoring are associated with new occupational groups; new kinds of professional accountability; and a greater integration across professional roles. Further conflicts also arise, where occupational groups have different understandings of project deliverables and how they are competently achieved. The preliminary findings are important for an increasing policy focus on shareable data, in order for building owners and operators to improve the cost, value, handover and operation of complex buildings. However, it will also have an impact on wider public decision-making processes, professional autonomy, expertise and interdependence. These findings are considered in relation to extant literatures, which problematize the idea of professionalism; and the shift from drawings to shareable data as deliverables. The implications for ethics in established professions and other occupational groups are discussed; directions are suggested for further scholarship on professionalism in digitally mediated project work to improve practices which will better serve society.
Resumo:
The construction industry is widely recognised as being inherent with risk and uncertainty. This necessitates the need for effective project risk management to achieve the project objectives of time, cost and quality. A popular tool employed in projects to aid in the management of risk is a risk register. This tool documents the project risks and is often employed by the Project Manager (PM) to manage the associated risks on a project. This research aims to ascertain how widely risk registers are used by Project Managers as part of their risk management practices. To achieve this aim entailed interviewing ten PMs, to discuss their use of the risk register as a risk management tool. The results from these interviews indicated the prevalent use of this document and recognised its effectiveness in the management of project risks. The findings identified the front end and feasibility phases of a project as crucial stages for using risk registers, noting it as a vital ingredient in the risk response planning of the decision making process. Moreover, the composition of the risk register was also understood, with an insight into how PMs produce and develop this tool also ascertained. In conclusion, this research signifies the extensive use of the risk register by PMs. A majority of PMs were of the view that risk registers constitute an essential component of their project risk management practices. This suggests a need for further research on the extent to which risk registers actually help PMs to control the risks in a construction project, particularly residual risks, and how this can be improved to minimize deviations from expected outcomes.
Resumo:
This article reports on research which identified perceptions of reading and the teaching of reading held by trainee teachers and the impact on my provision as a teacher educator. It found that students’ past and present experiences of learning to read and being a reader influenced their perceptions of what reading is and of what it means to teach reading. As a teacher educator, I am not able to give students long experience of seeing children becoming readers, but I am able to give them richer experiences of reading in personally and culturally relevant contexts. This has implications for the nature of subject knowledge required by a student teacher of reading and the curriculum and practice of teacher education.
Resumo:
This paper provides a high-level overview of E-UTRAN interworking and interoperability with existing Third Generation Partnership Project (3GPP) and non-3GPP wireless networks. E-UTRAN access networks (LTE and LTE-A) are currently the latest technologies for 3GPP evolution specified in Release 8, 9 and beyond. These technologies promise higher throughputs and lower latency while also reducing the cost of delivering the services to fit with subscriber demands. 3GPP offers a direct transition path from the current 3GPP UTRAN/GERAN networks to LTE including seamless handover. E-UTRAN and other wireless networks interworking is an option that allows operators to maximize the life of their existing network components before a complete transition to truly 4G networks. Network convergence, backward compatibility and interpretability are regarded as the next major challenge in the evolution and the integration of mobile wireless communications. In this paper, interworking and interoperability between the E-UTRAN Evolved Packet Core (EPC) architecture and 3GPP, 3GPP2 and IEEE based networks are clearly explained. How the EPC is designed to deliver multimedia and facilitate interworking is also explained. Moreover, the seamless handover needed to perform this interworking efficiently is described briefly. This study showed that interoperability and interworking between existing networks and E-UTRAN are highly recommended as an interim solution before the transition to full 4G. Furthermore, wireless operators have to consider a clear interoperability and interworking plan for their existing networks before making a decision to migrate completely to LTE. Interworking provides not only communication between different wireless networks; in many scenarios it contributes to add technical enhancements to one or both environments.