7 resultados para project planning and controlling

em Cochin University of Science


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Production Planning and Control (PPC) systems have grown and changed because of the developments in planning tools and models as well as the use of computers and information systems in this area. Though so much is available in research journals, practice of PPC is lagging behind and does not use much from published research. The practices of PPC in SMEs lag behind because of many reasons, which need to be explored This research work deals with the effect of identified variables such as forecasting, planning and control methods adopted, demographics of the key person, standardization practices followed, effect of training, learning and IT usage on firm performance. A model and framework has been developed based on literature. Empirical testing of the model has been done after collecting data using a questionnaire schedule administered among the selected respondents from Small and Medium Enterprises (SMEs) in India. Final data included 382 responses. Hypotheses linking SME performance with the use of forecasting, planning and controlling were formed and tested. Exploratory factor analysis was used for data reduction and for identifying the factor structure. High and low performing firms were classified using a Logistic Regression model. A confirmatory factor analysis was used to study the structural relationship between firm performance and dependent variables.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Production Planning and Control (PPC) systems have grown and changed because of the developments in planning tools and models as well as the use of computers and information systems in this area. Though so much is available in research journals, practice of PPC is lagging behind and does not use much from published research. The practices of PPC in SMEs lag behind because of many reasons, which need to be explored. This research work deals with the effect of identified variables such as forecasting, planning and control methods adopted, demographics of the key person, standardization practices followed, effect of training, learning and IT usage on firm performance. A model and framework has been developed based on literature. Empirical testing of the model has been done after collecting data using a questionnaire schedule administered among the selected respondents from Small and Medium Enterprises (SMEs) in India. Final data included 382 responses. Hypotheses linking SME performance with the use of forecasting, planning and controlling were formed and tested. Exploratory factor analysis was used for data reduction and for identifying the factor structure. High and low performing firms were classified using a Logistic Regression model. A confirmatory factor analysis was used to study the structural relationship between firm performance and dependent variables.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Today India is seeking a speedy transformation of her semi-stagnant economy to a dynamic one by means of economic planning in a democratic set up. In the context of this growth oriented endeavour public sector has a vital role to play. After three decades of planned development, it has become important that India must make fresh appraisals on the role of public sector in the economic renaissance of the country. Almost no comprehensive study has been made on this vital segment of the economy vis-a-vis the growth economics. This study is an attempt to fill this need in a very modest way. It presents the subject in a new perspective. An earnest attempt is made to reveal the critical problems inhibiting the growth of the public sector from a new angle which focusses the spot-light on the economics of development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Rapid changes in the technological environment of marine logistics and the increasing integration of waterborne, air and land transport systems have fostered a revolution in the design and operations of transport vehicles, cargo handling technology, and terminal facilities. This in turn has caused major changes in the functions of and uses of ports. From literature, it was found that these changes were very slow in case of Indian ports and the performances of port operations were poor when compared with similar ports in the same region. It was also found that a very few studies were conducted to identify the reasons for slow improvements in the performances of Indian major ports. In this thesis, an attempt is made to find out the operational problems of Indian major ports and to analyze the reasons for it. Some solutions have also been found out using management tools

Relevância:

100.00% 100.00%

Publicador:

Resumo:

When we consider Kerala and Karnataka States according to their levels of decentralisation. Kerala is at the beginning of the scale of decentralisation whereas Kamataka has moved far ahead along this scale. Therefore I in order to conduct a comparative study of the SUbject under analysis t Kamataka has been selected owing to the fact that it is in an advanced stage in the experience of district planning compared to Kerala , Karnataka could successfully implement district planning and it is me of the pioneering states in this regard. But Kerala has not gained much experience in the field of decentralised district planning till now. Furthermore Kerala and Kamataka states are selected for the present study due to operational reasons I besides the author I s familiarity with the socia-economic conditions of these states. Thus. an analysis of the district planning experience of Kamataka will provide constructive and valuable information. which will be of great importance to Kerala State, which is now aspiring to introduce ful.I-f'Iedge district planning by constituting elected District Coancils in every district of Kerala. Moreover. the findings and policy implications of the present study will be of immense help to planners, politicians. administrators, academicians and people at large.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.