7 resultados para mega-projects

em Cochin University of Science


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The study has wider policy implications as it identifies the possible variables which influence the sustainability of participatory productive sector projects. The method which is developed to study the sustainability of projects under People’s Planning in Chempu Panchayat could be used for studying the same in other panchayats also. Unlike the case of the standard features of sustainability identified, the independent variables vary according to the nature of the project. Hence, this needs to be modified accordingly while applying the method in a dissimilar domain. Selection of a single panchayat for the present study is relevant on the basis of a common package of inputs for decentralised planning which is forwarded by the State Planning Board respectively for the three-tier panchayat system in Kerala. The dynamic filed realities could be brought out in view of a comprehensive planning approach through an in depth study of specific cases.The assessment of the nature and pattern of productive sector projects in the selected Village Panchayat puts the projects under close scrutiny. The analysis has depended largely on secondary sources of information, especially from panchayat level plan documents, and also on the primary information obtained using direct observation and on-site inspection of project sites. An analysis of the nature and pattem of productive sector projects is important as it gives all necessary information regarding follow-up, monitoring/evaluation and even termination of a particular project. It has also revealed the tendencies of including infrastructure and service sector projects under ‘productive’ category, especially for maintaining the stipulated ratio (40:30:30) of grant-in-aid distribution. The study regarding the allocation and expenditure pattern of plan funds is vital in policy level as it reveals the under-noticed allocation and expenditure pattern of plan funds other than grant-in-aid. One major limitation of the study has been the limited availability of secondary data, especially regarding project-wise expenditure and monitoring/evaluation reports of various project committees.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present study is intended to provide a new scientific approach to the solution of the worlds cost engineering problems encountered in the chemical industries in our nation. The problem is that of cost estimation of equipments especially of pressure vessels when setting up chemical industries .The present study attempts to develop a model for such cost estimation. This in turn is hoped would go a long way to solve this and related problems in forecasting the cost of setting up chemical plants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aimed to study the evolution and substance of microfinance as a major tool for combating poverty at the global and national level. The development of micro finance in Kerala is briefly discussed. It also indicates the importance and role of microcredit in bringing the poor up in the society through entrepreneurial initiatives. The current trends in the field are also discussed, leading to the need of the present research.